Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility.

Slides:



Advertisements
Similar presentations
INDIANAUNIVERSITYINDIANAUNIVERSITY GENI Global Environment for Network Innovation James Williams Director – International Networking Director – Operational.
Advertisements

U.S. Department of the Interior U.S. Geological Survey Beyond the Archive Task Team Discussion at WGISS #25 February, 2008 Lyndon R. Oleson U.S. Geological.
Future Directions and Initiatives in the Use of Remote Sensing for Water Quality.
1 US activities and strategy :NSF Ron Perrott. 2 TeraGrid An instrument that delivers high-end IT resources/services –a computational facility – over.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
UNIVERSITY OF TWENTE - FACULTY OF GEO-INFORMATION SCIENCE AND EARTH OBSERVATION (ITC) Human Sensor Web project h2.0 Inform and Empower Initiative Human.
Peter Griffith and Megan McGroddy 4 th NACP All Investigators Meeting February 3, 2013 Expectations and Opportunities for NACP Investigators to Share and.
Presentation at WebEx Meeting June 15,  Context  Challenge  Anticipated Outcomes  Framework  Timeline & Guidance  Comment and Questions.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
1 Assessment of Cambodia’s Statistics Capacity Prepared by Zia A. Abbasi IMF Multi-sector Statistics Advisor, Cambodia for the International Conference.
NSF and Environmental Cyberinfrastructure Margaret Leinen Environmental Cyberinfrastructure Workshop, NCAR 2002.
Support Considerations for the Houston Environmental Aerosol Thunderstorm (HEAT) Project Richard Dirks, Jim Moore, Steve Williams UCAR/Joint Office for.
COST ES0602: Towards a European Network on Chemical Weather Forecasting and Information Systems.
CPSC 695 Future of GIS Marina L. Gavrilova. The future of GIS.
Energy Efficiency & Renewable Energyeere.energy.gov 1 Three-part strategy to reduce geothermal development risks System Design, Development and Testing.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
V. Chandrasekar (CSU), Mike Daniels (NCAR), Sara Graves (UAH), Branko Kerkez (Michigan), Frank Vernon (USCD) Integrating Real-time Data into the EarthCube.
Mr. Samuel P. Williamson Federal Coordinator for Meteorology Sponsored by: The Office of the Federal Coordinator for Meteorological Services and Supporting.
NGAC Interagency Data Sharing and Collaboration Spotlight Session: Best Practices and Lessons Learned Robert F. Austin, PhD, GISP Washington, DC March.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
The Natural Resources Digital Library Needs, Partners, and Challenges Bonnie Avery, Janine Salwasser, & Janet Webster Oregon State University.
, Data for Disaster Planning, Response, Management and Awareness ASDC Introduction The Atmospheric Science Data Center (ASDC) at NASA Langley Research.
Pacific TA Meeting: Quality Practices in Early Intervention and Preschool Programs Overview to Trends and Issues in Quality Services Jane Nell Luster,
Introduction to Information Systems Class Agenda Instructor Introductions –Instructor –Class Objectives Competitive Advantages will be a key area Very.
The US CLIVAR SSC is undertaking an examination of progress made and priority science questions and research needs remaining to be addressed to: – improve.
Citizens Redistricting Commission Civic Engagement Proposal February 11, 2011 Center for Collaborative Policy, California State University, Sacramento.
Configuring Electronic Health Records Migration to an Electronic Health Record System Lecture b This material (Comp11_unit1b) was developed by Oregon Health.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
Planning for Arctic GIS and Geographic Information Infrastructure Sponsored by the Arctic Research Support and Logistics Program 30 October 2003 Seattle,
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Data Management Practices for Early Career Scientists: Closing Robert Cook Environmental Sciences Division Oak Ridge National Laboratory Oak Ridge, TN.
TE Workshop - October 6, 2011 Review of ABoVE Scoping Study The NASA Terrestrial Ecology Program requested community input on the Arctic-Boreal Vulnerability.
T-PARC Operations Plan Outline Chapter 1. T-PARC Overview Chapter 2 Scientific Mission Planning Organization and Intensive Observing Period Definition.
ARCSS Data Management Support Overview and Update James Moore Steve Williams NCAR Earth Observing Laboratory 3-5 October 2007.
Division of Arctic Sciences Support for Toolik Field Station Renee Crain Arctic Research Support and Logistics Program Manager.
START-08/pre-HIPPO FIELD CATALOG AND DATA MANAGEMENT Steve Williams NCAR Earth Observing Laboratory (EOL) Boulder, Colorado START-08/pre-HIPPO Planning.
Office of Performance Review (OPR) U.S. Department of Health and Human Services (DHHS) Health Resources and Services Administration (HRSA) Stephen Dorage.
Catawba County Board of Commissioners Retreat June 11, 2007 It is a great time to be an innovator 2007 Technology Strategic Plan *
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
08/05/06 Slide # -1 CCI Workshop Snowmass, CO CCI Roadmap Discussion Jim Bottum and Patrick Dreher Building the Campus Cyberinfrastructure Roadmap Campus.
RAINEX Data Management UCAR Joint Office for Science Support José Meitín Jim Moore Dick Dirks UCAR Joint Office for Science Support José Meitín Jim Moore.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
NAME 2004 Field Operations and Procedures NAME Special Session Field Operations Center Concept: Define requirements for, and conduct the day-to-day operations,
The Integrated Ocean Observing System (IOOS) is envisioned as a coordinated national and international network of observations, data management and analyses.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
Workshop: Food, Energy and Water Nexus in Sustainable Cities Beijing October 20-21, 2015 Nada Marie Anid, Ph.D. Dean School of Engineering and Computing.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Breakout Session Assignments and Goals. Summary of Objectives and Charge to Breakout Groups Desired outcome: a comprehensive vision for NACP Data Management.
OOI-CYBERINFRASTRUCTURE OOI Cyberinfrastructure Education and Public Awareness Plan Cyberinfrastructure Design Workshop October 17-19, 2007 University.
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL.
U.S. Department of the Interior U.S. Geological Survey Decision Support Tools and USGS Data Management Best Practices Cassandra Ladino USGS Chesapeake.
ORIENTATION WORKSHOP. Target Capabilities Assessment Purpose Objectives Structure of the Target Capabilities Assessment Process Overview The Self-Assessment.
Fire Emissions Network Sept. 4, 2002 A white paper for the development of a NSF Digital Government Program proposal Stefan Falke Washington University.
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
Improving Technology Infrastructure and Web-based Information and Services Northeast Iowa Community College PRP031A Christine Woodson, Project Director.
1 CREATING AND MANAGING CERT. 2 Internet Wonderful and Terrible “The wonderful thing about the Internet is that you’re connected to everyone else. The.
Where/how could we change the overall process of field project implementation to improve in our mission of answering key science questions? Are we open.
Industrial and Manufacturing Engineering JACLYN VANGILDER LAURA PAZ VINCENT ISOPI.
OFCM CEISC December 12, 2005 Non-Traditional and Non-WMO Observational Networks: Transitioning of the Meteorological Assimilation Data Ingest System (MADIS)
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
A Shared Commitment to Digital Preservation and Access.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
GPM GPM Conference May , 2001Erich Franz Stocker 1 GPM Ground System Study Coordinator May 17, 2001 Data Management Global Precipitation Measurement.
The Lead Agency Council Sports Trust (Sport Otago) Cluster of clubs Interested parties / other.
Presentation transcript:

Field Project Planning, Operations and Data Services Jim Moore, EOL Field Project Services (FPS) Mike Daniels, EOL Computing, Data and Software (CDS) Facility

Science Planning Meeting Facility & Science Coordination Mtg. Operations Planning Mtg. Finalize Ops Plan Project Safety Review Finalize Data Mgmt Plan Data Analysis Workshop Program Assessment Site setup Initiate Data Collection Communications Sys. Shakedown Generic Large Field Project Timeline Establish distributed/centralized data archive Assist with dataset submission, updating and distribution Perform special data processing (QC, formatting) Support analysis and synthesis activities Implement long term data security, stewardship and access Field Phase Daily Planning Process In-Field Data Management Operational Data Collection Facility Coordination Real-time Displays Operations Center User Services In-field Catalog Long-Term Data Management Support Phase Project Planning Phase Data Processing Quality Control Routine Archive/ Access +1 yr Proj Team selection, Prepare Ops Plan, Data Mgmt. Plan, Logistics, Web site US Facilities Request Draft the Science Plan and Operations Plan Initial Site Survey US Science Proposal Submissions US Facility Decisions Feasibility Cost Estimates -1 yr -4 yrs yrs (or more) EDO/SPO Preparation

Challenges Balancing use of latest technologies with the maintenance and operation of existing instrumentation and infrastructure Defining project requirements and scope in a complex set of exchanges which include PIs, EOL & NSF (and often other agencies) Handling new requirements related to international and domestic security Expanding from regional/shorter duration projects to global/longer duration projects as the science needs dictate and facilities grow in their capabilities

Challenges (cont.) Obtaining more data, from a wider variety of sources, faster or in real-time and analyzing these data as quickly as possible Working on new or current field projects while meeting the analysis needs of the completed projects Building effective internal, university, inter-agency and international partnerships with regard to field projects and data analysis Assessing community input with the outcome of determining priorities constrained by resources

Discussion Where/how could we change the overall process of field project implementation to improve in our mission of answering key science questions? Are we open enough to new ideas from PIs? Are we paying enough attention to the needs during the analysis phase and do we have the appropriate balance between our support of current and future projects versus support of past projects? How are we doing with regard to our support of projects with a more global and/or long-term scope? Are we keeping up with logistical and staffing challenges, especially in the more complex projects? Are our communications and interactions with NSF and the PIs during the project planning phase efficient, clear and productive?

Discussion (cont.) How effectively are we managing interactions with other agencies during field projects as they increasingly partner with us? Are we tapping into the operational data sources (e.g. NEXRAD, model output, satellite, mesonets, soundings, etc.) effectively? Are our visualization and analysis tools used during field projects and beyond meeting the needs of the science community? How are we doing with regard to remote participation in the field phase? Is this important? Are we meeting your objectives with regard to our data delivery in terms of both timeliness and quality? What can we do to increase student involvement in field projects in a meaningful way?

Where/how could we change the overall process of field project implementation to improve in our mission of answering key science questions? Are we open enough to new ideas from PIs? Are we paying enough attention to the needs during the analysis phase and do we have the appropriate balance between our support of current and future projects versus support of past projects? How are we doing with regard to our support of projects with a more global and/or long- term scope? Are we keeping up with logistical and staffing challenges, especially in the more complex projects? Are our communications and interactions with NSF and the PIs during the project planning phase efficient, clear and productive? How effectively are we managing interactions with other agencies during field projects as they increasingly partner with us? Are we tapping into the operational data sources (e.g. NEXRAD, model output, satellite, mesonets, soundings, etc.) effectively? Are our visualization and analysis tools used during field projects and beyond meeting the needs of the science community? How are we doing with regard to remote participation in the field phase? Is this important? How are we doing with regard to our data delivery in terms of both timeliness and quality? What can we do to increase student involvement in field projects in a meaningful way?