Corporate Partner Overview and Update September 27, 2007 Gary Crane SURA Director IT Initiatives.

Slides:



Advertisements
Similar presentations
PC Blades Wilson Edgar. Objective - 44% Lower Operating Cost than traditional PCs - 50% More Energy Efficient than traditional PCs - Unsurpassed Security.
Advertisements

MicroTerabyte Leveraging InfiniBand to Build a Powerful, Scalable Oracle Database and Application Platform Brian Dougherty Chief Architect, CMA.
PowerEdge T20 Customer Presentation. Product overview Customer benefits Use cases Summary PowerEdge T20 Overview 2 PowerEdge T20 mini tower server.
Confidential Prepared by: System Sales PM Version: 1.0 Lean Design with Luxury Performance.
© 2010 Cisco and/or its affiliates. All rights reserved. 1 Microsoft Exchange Server Ready UCS Data Center & Virtualizacion Cisco Latin America Valid through.
4/11/2017 © 2014 Microsoft Corporation. All rights reserved. Microsoft, Windows, and other product names are or may be registered trademarks and/or trademarks.
Custom’s K-12 Education Technology Council Presents… Custom Computer Specialists Server Technology Solutions Designed for NYCDOE Affordable and.
1© Copyright 2011 EMC Corporation. All rights reserved. EMC SQL Server Data Warehouse Fast Track Solutions Nov 30, 2011 Ling Wu, EMC.
Jia Yao Director: Vishwani D. Agrawal High Performance Compute Cluster April 13,
Information Technology Center Introduction to High Performance Computing at KFUPM.
Tower Dual Processor 1 x 2.13GHz Quad Core Intel Xeon E5506 1x250GB 7200RPM Drive Four open 3.5” Direct- Cabled SATA Bays 2GB 2 (1 DIMM) PC MHz.
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
SURA IT Program Update See Board materials book Tab 17 for IT highlights –ITSG activities & summary of interactions with I2 & NLR – Page 1-2 and –SURA.
Novell Server Linux vs. windows server 2008 By: Gabe Miller.
HIGH PERFORMANCE COMPUTING ENVIRONMENT The High Performance Computing environment consists of high-end systems used for executing complex number crunching.
An Introduction to Princeton’s New Computing Resources: IBM Blue Gene, SGI Altix, and Dell Beowulf Cluster PICASso Mini-Course October 18, 2006 Curt Hillegas.
Intel  modular server building blocks ( built on Intel  Multi-Flex Technology ) Intel  modular server building blocks ( built on Intel  Multi-Flex.
CPP Staff - 30 CPP Staff - 30 FCIPT Staff - 35 IPR Staff IPR Staff ITER-India Staff ITER-India Staff Research Areas: 1.Studies.
BNL Oracle database services status and future plans Carlos Fernando Gamboa RACF Facility Brookhaven National Laboratory, US Distributed Database Operations.
Real Parallel Computers. Modular data centers Background Information Recent trends in the marketplace of high performance computing Strohmaier, Dongarra,
Cluster Computers. Introduction Cluster computing –Standard PCs or workstations connected by a fast network –Good price/performance ratio –Exploit existing.
5.3 HS23 Blade Server. The HS23 blade server is a dual CPU socket blade running Intel´s new Xeon® processor, the E5-2600, and is the first IBM BladeCenter.
Module 9 PS-M4110 Overview <Place supporting graphic here>
Cluster computing facility for CMS simulation work at NPD-BARC Raman Sehgal.
ww w.p ost ers essi on. co m E quipped with latest high end computing systems for providing wide range of services.
KYLIN-I 麒麟一号 High-Performance Computing Cluster Institute for Fusion Theory and Simulation, Zhejiang University
ADVANCE FORENSIC WORKSTATION. SPECIFICATION Mother board : Xeon 5000 Series Server Board support 667MHz, 1066MHz and 1333MHz1 Processor : Two Intel Quad.
© Copyright IBM Corporation 2006 Course materials may not be reproduced in whole or in part without the prior written permission of IBM IBM BladeCenter.
Computing/Tier 3 Status at Panjab S. Gautam, V. Bhatnagar India-CMS Meeting, Sept 27-28, 2007 Delhi University, Delhi Centre of Advanced Study in Physics,
DELL PowerEdge 6800 performance for MR study Alexander Molodozhentsev KEK for RCS-MR group meeting November 29, 2005.
Group 6 Project: Server Proposal. Introduction I. Vendor II. Servers a. Exchange b. Print c. Web d. SQL III. Software IV. Cost.
UTA Site Report Jae Yu UTA Site Report 4 th DOSAR Workshop Iowa State University Apr. 5 – 6, 2007 Jae Yu Univ. of Texas, Arlington.
SURA Birds of a Feather I2 Spring Members Meeting April 23, 2007 Gary Crane SURA Director IT Initiatives.
Objective  CEO of a small company  Create a small office network  $10,000 and $20,000 Budget  Three servers (workstations)  Firewall device  Switch.
InfiniSwitch Company Confidential. 2 InfiniSwitch Agenda InfiniBand Overview Company Overview Product Strategy Q&A.
Rensselaer Why not change the world? Rensselaer Why not change the world? 1.
Hardware Trends. Contents Memory Hard Disks Processors Network Accessories Future.
© Copyright 2013 TONE SOFTWARE CORPORATION New Client Turn-Up Overview.
IBM Linux Update for CAVMEN Jim Savoie Linux Sales IBM Americas Group October 21, 2004.
Wright Technology Corp. Minh Duong Tina Mendoza Tina Mendoza Mark Rivera.
PDSF at NERSC Site Report HEPiX April 2010 Jay Srinivasan (w/contributions from I. Sakrejda, C. Whitney, and B. Draney) (Presented by Sandy.
KOLKATA Grid Site Name :- IN-DAE-VECC-02Monalisa Name:- Kolkata-Cream VO :- ALICECity:- KOLKATACountry :- INDIA Shown many data transfers.
Weekly Report By: Devin Trejo Week of June 21, 2015-> June 28, 2015.
IDC HPC User Forum April 14 th, 2008 A P P R O I N T E R N A T I O N A L I N C Steve Lyness Vice President, HPC Solutions Engineering
ClinicalSoftwareSolutions Patient focused.Business minded. Slide 1 Opus Server Architecture Fritz Feltner Sept 7, 2007 Director, IT and Systems Integration.
Control System Virtualization for the LHCb Online System ICALEPCS – San Francisco Enrico Bonaccorsi, (CERN)
SA1 operational policy training, Athens 20-21/01/05 Presentation of the HG Node “Isabella” and operational experience Antonis Zissimos Member of ICCS administration.
LSST Cluster Chris Cribbs (NCSA). LSST Cluster Power edge 1855 / 1955 Power Edge 1855 (*LSST1 – LSST 4) –Duel Core Xeon 3.6GHz (*LSST1 2XDuel Core Xeon)
구성도 Server Farm Storage DB Server WEB Server F/W ( 방화벽 ) App Server Forti 200B UTM 신비넷 IDC L2 스위치 Si BS_Sapphire1# BS_Sapphire2#
 System Requirements are the prerequisites needed in order for a software or any other resources to execute efficiently.  Most software defines two.
© 2011 IBM Corporation Product positioning Jana Jamsek, ATS Europe.
Pathway to Petaflops A vendor contribution Philippe Trautmann Business Development Manager HPC & Grid Global Education, Government & Healthcare.
GPU Solutions Universal I/O Double-Sided Datacenter Optimized Twin Architecture SuperBlade ® Storage SuperBlade ® Configuration Training Francis Lam Blade.
HP Proliant Server  Intel Xeon E3-1220v3 (3.1GHz / 4-core / 8MB / 80W).  HP 4GB Dual Rank x8 PC E (DDR3-1600) Unbuffered Memory Kit.  HP Ethernet.
Dell PowerEdge Blade Server PDVSA Jun-05
Acer Altos T110 F3 E3-1220v3 4GB 500GB: 24,900 Baht
1062m0656 between 10692m2192 DS/ICI/CIF EqualLogic PS6510E
Power Systems with POWER8 Technical Sales Skills V1
Ryan Leonard Storage and Solutions Architect
TYBIS IP-Matrix Virtualized Total Video Surveillance System Edge Technology, World Best Server Virtualization.
SURA Presentation for IBM HW for the SURA GRID for 2007
Virtualization OVERVIEW
IBM Linux Update for CAVMEN
Low Latency Analytics HPC Clusters
,Dell PowerEdge 13 gen servers rental.
Dell ™ PowerEdge R320 E GB 1TB:- 57,900 Baht
HP SERVERS & OPTIONS PRODUCTS THAT DELIVER
Retail File September 2019 LENOVO ThinkSystem ST50 Server
BUNDLE Hewlett Packard SERVER DL 380 G10 WITH 32GB, 3x 1
Presentation transcript:

Corporate Partner Overview and Update September 27, 2007 Gary Crane SURA Director IT Initiatives

SURAgrid Corporate Partnerships IBM p575 AIX offering IBM e1350 Linux offering Dell PowerEdge 1950 offering Significant product discounts Owned and operated by SURAgrid participants Integrated into SURAgrid with 20% of capacity available to SURAgrid

16W Fed SW BPA 2U 4U 16W 0.97 TFlop Configuration 8, 16W Nodes at 1.9 Ghz 128 Processors Federation Switch 256 GB or 128 GB System Memory Storage Capacity: 2.35 TBytes 1.7 TFlop Configuration 14, 16W Nodes at 1.9 Ghz 224 Processors Federation Switch 224 GB or 448 GB System Memory Storage Capacity: 4.11 TBytes IBM Systems Offerings p575 systems 16W Fed SW BPA 2U 4U 16W

p575 Software AIX 5.3 General Parallel File System (GPFS) with WAN Support LoadLeveler Cluster Systems Management (CSM) Compilers (XL/FORTRAN, XLC) Engineering and Scientific Subroutine Library (ESSL) IBM’s Parallel Environment (PE) Simultaneous Multi-Threading (SMT) Support Virtualization, Micro-Partitioning, DLPAR

IBM e1350 Linux Cluster Offering IBM BladeCenter-H, HS21XM Blades and Intel Quad-Core Processors 3 TFLOP Configuration –One Rack solution with GigE interconnect –1GB/core –Combination Management/User node with storage 6 TFLOP – Performance Focused Solution for HPC –Two Rack solution utilizing DDR Infiniband –2GB/core –Combination Management/User node with storage –Optional SAN supporting 4Gbs storage at 4.6Tbytes Announced at April 17 SURA BoT meeting

3 TFLOP e1350 Cluster -  34 HS21XM Blade Servers in 3 BladeCenter H Chassis Dual Quad-Core 2.67 GHz Clovertown Processors 1 GB Memory per core 73 GB SAS Disk per blade GigE Ethernet to Blade with 10Gbit Uplink Serial Terminal Server connection to every blade Redundant power/fans  x3650 2U Management/User Node Dual Quad-Core 2.67 GHz Clovertown Processors 1 GB Memory per core Myricom 10Gb NIC Card RAID Controller with (6) 300GB 10K Hot-swap SAS Drives Redundant power/fans  Force10 48-port GigE Switch with 2 10Gb Uplinks  SMC 8-port 10Gb Ethernet Switch  (2) 32-port Cyclades Terminal Servers  RedHat ES 4 License and Media Kit (3 years update support)  Console Manger, Pull-out console, keyboard, mouse  One 42U Enterpise Rack, all cables, PDU’s  Shipping and Installation  5 Days onsite Consulting for configuration, skills transfer  3 Year Onsite Warranty

 70 HS21XM Blade Servers in 5 BladeCenter H Chassis Dual Quad-Core 2.67 GHz Clovertown Processors 2 GB Memory per core 73 GB SAS Disk per blade GigE Ethernet to Blade DDR Non-Blocking Voltaire Infiniband Low Latency Network Serial Terminal Server connection to every blade Redundant power/fans  x3650 2U Management/User Node Dual Quad-Core 2.67 GHz Clovertown Processors 1 GB Memory per core Myricom 10Gb NIC Card RAID Controller with (6) 300GB 10K Hot-swap SAS Drives Redundant power/fans  DDR Non-Blocking Infiniband Network  Force10 48-port GigE Switch  (3) 32-port Cyclades Terminal Servers  RedHat ES 4 License and Media Kit (3 years update support)  Console Manger, Pull-out console, keyboard, mouse  One 42U Enterpise Rack, all cables, PDU’s  Shipping and Installation  10 Days onsite Consulting for configuration, skills transfer  3 Year Onsite Warranty 6 TFLOP e1350 Cluster -

 x3650 Storage Node Dual Quad-Core 2.67 GHz Clovertown Processors 1 GB Memory per core Myricom 10Gb NIC Card (2) 3.5" 73GB 10k Hot Swap SAS Drive (2) IBM 4-Gbps FC Dual-Port PCI-E HBA Redundant power/fans 3 Year Onsite 24x7x4Hour On-site Warranty  DS4700 Storage Subsystem 4 Gbps Performance (Fiber Channel) EXP810 Expansion System (32) 4 Gbps FC, GB/15K Enhanced Disk Drive Module (E-DDM) Total 4.6 TB Storage Capacity 6 TFLOP e1350 Cluster Storage Option -

Additional Interactions with IBM Provided technical assistance with porting of SCOOP applications to AIX and configuring LoadLeveler to allow job suspension and pre-emption Provided SURA with booth space at SC06 and SC07 Hosted SCOOP and SURAgrid presentations at SC06 and SC07 Plan to update offerings by end of calendar year to include Power6 offering and repricing of p575 and e1350 systems

SURA – Dell Partnership Dell Dell PowerEdge TFlop High Performance Cluster SURAgrid Special Offer - $112,500 –Master Node – Dell PowerEdge 1950 (Qty = 1) –Compute Nodes – Dell PowerEdge 1950 (Qty = 27) –Gigabit Ethernet Interconnect Dell PowerConnect 6248 (Qty = 2) –PowerEdge 4210, 42U Frame –Platform Rocks – Cluster Management Software 3 year support agreement –Complete Rack & Stack, including cabling, prior to delivery –Complete Software Installation – Operating system, Cluster Management Software –2 Day on-site systems engineer

Dual 2.33GHz/2x4MB Cache, Quad Core Intel® Xeon E5345, 1333MHz FSB Processors 12GB FBD 667MHz Memory 80GB 7.2K RPM SATA Hard Drive Red Hat Enterprise Linux WS v4 3Yr RHN Subscription, EM64T 24X CD-ROM 3 Years HPCC Next Business Day Parts and Labor On-Site Service 28 Node Dell PowerEdge 1950

All SURA Partner Systems Available Under SURA-Participant MOU Participants agree to –join SURAgrid as a contributing member –Purchase, install and operate systems –Contribute 20% of purchased systems to SURAgrid pool MOU is under revision with input from the SGC

Future Partnerships Discussions currently underway with MicroSoft –Explore development of MS Compute Cluster Server (CCS) gateway to SURAgrid –SURAgrid as a possible testbed environment for this development Other partner suggestions - contacts

For More Information Regarding IBM and Dell Discount Packages Contact Gary Crane or