CHAPTER-10 AIRPORT PLANNING.

Slides:



Advertisements
Similar presentations
Airport Planning and Design
Advertisements

Airport Financial Management
Airport planning.
Regulatory Landscape for Leased Federal Airports Archerfield Airport Community Aviation Consultation Group (AACACG) 2 November 2011 Helen Gannon Aviation.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Aggregate Planning.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
1 FY 11 Airport Budget Recommendations. 2 Aviation Department Mission Statement To provide a safe and secure air transportation system that is economically.
Chapter 10 FISCAL MANAGEMENT. DEALS WITH GOAL SETTING, DESIGNING A BUDGET THAT IS TARGETED TO ACHIEVE THOSE GOALS, THE PROCESS OF BUDGET REVIEW AND APPROVAL,
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Systems Analysis and Design 9th Edition
Chapter 2.
1 Budgeting Dr. Varadraj Bapat Module 14.. Management Accounting Dr. Varadraj Bapat, IIT Mumbai 2 Index  Introduction  Objectives  Advantages  Components.
Hilton Maher Selto. 15 Budgeting & Financial Planning McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Lec 20, Ch.11: Transportation Planning Process (objectives)
Lec 15 LU, Part 1: Basics and simple LU models (ch6.1 & 2 (A), ch (C1) Get a general idea of urban planning theories (from rading p (A)
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Air Transportation A Management Perspective
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
Introduction to Hospitality, 6e
Prepared for Airport Ground Transportation Association Spring 2008 Meeting Atlanta, GA April 8, 2008 PRESENTATION COMMERCIAL VEHICLES: WHO’S CURB IS IT.
Route Planning and Evaluation
Operations Management
Production planning and control is the organization and planning of the manufacturing process. It co-ordinates supply and movement of materials and labor,
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
© Jerusalem Policy Forum Towards Economic Development in East Jerusalem Now A Strategic Approach by the Jerusalem Policy Forum.
Initiating and Planning Systems Development projects
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Working Paper One/ Study Committee Meeting May 2015.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Lecture 4 1 Introduction to Systems Planning Lecture 4 2 Objectives n Describe the strategic planning process n Explain the purpose of a mission statement.
Reaching New Heights... Developing the Strategy Chapter VI Integrating Marketing in the Leisure Industry.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Lecture 7: Airport Financial Management
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
Chapter (7) Master Budget : Overall Plan
Evaluating Ongoing Programs: A Chronological Perspective to Include Performance Measurement Summarized from Berk & Rossi’s Thinking About Program Evaluation,
Feasibility Study.
FUTURE OF AIRPORT MANAGEMENT 1. Though, we cannot predict precisely what airport management be in next 100 years, but it will evolve with changes in technologies,
The Business Plan: Creating and Starting the Venture
Lecture 6: Airport Financial Management
Lecture 9: The Economic & Political Role of Airports By: Zuliana Ismail.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Babes-Bolyai University Faculty of Political, Administrative and Communication Science The need for Planning Diana Apostol NGO Management 1 st Year.
In the Framework of: Financed by: Developed by: Business Planning for Water Associations Prepared by Water Supply and Sewerage Association of Albania SHUKALB.
Chapter 5 5 Planning C H A P T E R. Outcomes Differentiate between strategic planning and master planning. Understand the strategic and master planning.
Border Master Plan Laredo, Texas July 28, 2010  Laredo District  Coahuila  Nuevo León  Tamaulipas.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Systems Analysis & Design 7 th Edition Chapter 2.
Airports of Montenegro. General informations  Airports of Montenegro is a public enterprise established by the Government of the Republic of Montenegro.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Budgeting and financial management
Tourism Master Plan A master plan for tourism destinations usually incorporates concerns that includes all aspects of Tourism development process. Factors.
Planning for Information System
ACA Conference - September 2017
Airport Planning.
Draft Transportation Element September 6, 2017
McKinney Airport Master Plan Update April 3, 2018
The Air Traffic Organization: Building Today to Ensure Our Future
Capital Improvement Plans
Pierre Regional Airport Master Plan Update
Chicago to Council Bluffs-Omaha
Presentation transcript:

CHAPTER-10 AIRPORT PLANNING

INTRODUCTION A/P mgt are handed the responsibility of strategically planning for a coordinated system of A/Ps to meet the future needs of the traveling public A/P planning may be defined as the employment of an organized strategy for the future management of airport operations, facilities designs, airfield configurations, financial allocations and revenues, environmental impacts, and organizational structures

Environmental Planning Organizational Planning AIRPORT PLANNING Six types of airport planning studies Facilities Planning Financial Planning Economic Planning Environmental Planning Organizational Planning Strategic planning

AIRPORT PLANNING FACILITIES PLANNING FINANCIAL PLANNING Facilities planning which focuses on future needs for A/F infrastructure such as R/Ws, T/Ws, A/C parking facilities, associated lighting, comm & nav systems, terminal buildings/ facilities, parking lots, ground access infrastructure, & support facilities, and non-aeronautical land uses (office parks, hotels, restaurants, or rental car locations) FINANCIAL PLANNING Financial planning, which is concerned with predicting future revenues and expenses, budgeting resources, and planning for financial assistance through grant programs, bond issues, or private investment Economic planning, which considers the future of economic activity, such as trade & commerce, & activity of industries that exist on A/P & off-A/P property and are either a direct or indirect result of A/P ops ECONOMIC PLANNING

ENVIRONMENTAL PLANNING ORGANIZATIONAL PLANNING AIRPORT PLANNING ENVIRONMENTAL PLANNING Environmental planning, which concentrates on maintaining or improving existing environmental conditions in the face of changes in future airport activity. Environmental planning includes land use planning, noise mitigation, wetland reclamation, and wildlife preservation ORGANIZATIONAL PLANNING Organizational planning, which involve the management of future labour requirements and organizational structures for the A/P admin, staff, & associated labor force It encompasses all other planning activities into a coordinated effort to maximize the future potential of the A/P to the community STRATEGIC PLANNING

DEFINING THE PLANNING HORIZON

DEFINING THE PLANNING HORIZON - Planning of A/P ops, is defined by the length of time into the future mgt considers its planning. This length of time into the future is called planning horizon - Different planning efforts require different PHs. For example, the organizational planning of staffing levels per shift for A/P ops may require a 3-month PH, but certainly not 20-yr PH. On the other hand, facilities planning of an A/F (runway construction) requires at least a 5-year PH, and certainly not a PH of less than 1 yr - Various types of A/P planning studies may be performed on a variety of different levels. Three such levels of planning include SYSTEM PLANNING MASTER PLANNING PROJECT PLANNING

AIRPORT SYSTEM PLANNING Airport system planning is a planning effort that considers a collection of airports on a local/state/regional, or national level, expected to complement each other as part of a coordinated air transportation system Through A/P system planning, the objectives of individual A/Ps are set in accordance with the needs of the community by setting the mission of each A/P to serve certain segments of the demand for aviation, such as targeting one A/P in a region to handle international commercial air travelers and another A/P to handle primarily smaller general aviation A/C ops

AIRPORT MASTER PLAN A/P master plan is a document that charts the proposed evolution of the A/P to meet future needs At large comm service A/Ps, master planning is a formal & complex process that coordinate large construction projects which is carried out over a period of 20 years At Smaller A/P, master planning might be the responsibility of a few staff members with other responsibilities, who depend on outside consultants for expertise and support At very small A/Ps, where capital improvements are minimal, the master plan might be a very simple document, prepared locally with the help of consultants  

OBJECTIVES OF THE AIRPORT MASTER PLAN • Provide an effective graphic presentation of the ultimate development of A/P & of anticipated land uses adjacent to the A/P • Establish a schedule of priorities & phasing for the various improvements proposed in the plan • Present pertinent backup info & data essential to the development of the master plan • Describe the various concepts and alternatives which were considered in the proposed plan • Provide a concise & descriptive report so that the impact and logic of its recommendations can be clearly understood

ELEMENTS OF MASTER PLAN AIRPORT MASTER PLAN ELEMENTS INVENTORY ACTIVITY FORECASTS DEMAND/ CAPACITY ANALYSIS FACILITIES REQUIREMENTS DESIGN ALTERNATIVES FINANCIAL PLANS AIRPORT MASTER PLAN In addition, some master plans include environmental and economic assessments of plans associated with the future plans for the A/P

INVENTORY

AIRPORT MASTER PLANING INVENTORY First step is the collection of all types of data pertaining to area that the A/P is to serve This includes an inventory of existing A/P facilities, area planning efforts that might affect the master plan and historical information related to their development This will provide background info for the master plan report It will also provide basic information for the development of forecasts and facility requirements  

INVENTORY HISTORICAL REVIEW OF AIRPORTS AND FACILITIES AIRSPACE STRUCTURE & NAVAIDS AIRPORT-RELATED LAND USE AERONAUTICAL ACTIVITY SOCIOECONOMIC FACTORS Demography Disposable Personal Income per Capita Economic Activity and Status of Industries Geographic Factors Competitive Position Political Factors Community Values Airport Layout Plan

FORECASTING FORECASTING

FORECASTING A/P master plans are developed on the basis of forecasts From forecasts, the relationships between demand and the capacity of an A/P’s various facilities can be established and A/P requirements can be determined Short, intermediate, & long-range (approx 5, 10, & 20-yr) forecasts are made to enable the planner to establish a schedule of development for improvements proposed in the master plan Two types of forecasting methods are available to assist planners in the decision- making process: qualitative and quantitative

FORECASTS OF AVIATION DEMAND Forecasts of aviation demand form the basis for facilities planning There is a need to know the Types of civil airport users Certificated air carriers Commuters General aviation Military services where applicable Types and volume of operational activity A/C ops Passengers and cargo Based A/C Jet and large-capacity prop transport A/C Smaller commercial, corporate, business, and pleasure A/C Future vertical/short takeoff and landing (V/STOL) A/C

ACTIVITY FORCASTE By performing a comprehensive forecast of the above measures of airport activity, using both quantitative and qualitative methods, the airport planner has the ability to incorporate into the master plan airport facilities that will accommodate forecast activity

DEMAND CAPACITY ANALYSIS

FACILITIES REQUIREMENTS Study of the demand/capacity relationship involves an estimation of the need to expand facilities and the cost of these improvements This type of analysis is done in consultation with the airlines & general aviation community The analysis is applied to A/C ops versus A/F improvements, passenger enplanements versus terminal building improvements, cargo tonnage versus cargo facility development, A/P access traffic versus access roads and rapid transit facilities Airspace in the vicinity of the master plan airport is also analyzed

DEMAND CAPACITY ANALYSIS Demand/capacity analysis is normally applied to short, intermediate, and long-range developments (approx 5, 10, and 20 yrs) Analysis is only an approximation of facility requirements, their costs, and savings that will result from reduced delays to A/P users as well as anticipated revenues obtained from proposed improvements Preliminary estimates of economic feasibility may also be obtained These approximations will provide a basis for developing the details of the A/P master plan and for determining the feasibility of improvements considered in the plan

DEMAND CAPACITY ANALYSIS DEMAND/CAPACITY ANALYSIS Demand/capacity analysis yields the approximate number & configuration of R/Ws, number of gates, square footage of terminal buildings, cargo facilities, number of public and employee parking spaces, types of airport access roads, and the overall land area required for the airport From the mix of aircraft and the number of aircraft operations, general requirements for length, strength, and number of runways; spacing of taxiways; layout and spacing of gates; and apron area requirements can be determined

DESIGN ALTERNATIVES

DESIGN ALTERNATIVES When planning for an A/P’s future, A/P planners develop a series of design alternatives to accommodate forecast levels of demand These design alternatives are then brought to A/P mgt, local govt, surrounding community, federal govt. to reach a consensus on recommended design alternative Design alternatives for airports may include: Selection of an A/P on a new yet undeveloped site Plans for design & operation of the A/F and local airspace Plans for design & operation of terminal & ground access sys

DESIGN ALTERNATIVES - One of the design alternatives for the future of an A/P may be to design a new A/P on an open, or greenfield, site - In this case, the first step in this process is that of proper site selection - The major factors that require careful analysis in the final evaluation of airport sites include RUNWAY ORIENTATION AND WIND ANALYSIS AIRSPACE ANALYSIS SURROUNDING OBSTRUCTIONS AVAILABILITY FOR EXPANSION NOISE IMPACTS COST COMPARISONS OF ALTERNATIVE SITES METEOROLOGICAL CONDITIONS AVAILABILITY OF UTILITIES

FINANCIAL PLANS

FINANCIAL PLANS Financial plan is an economic evaluation of the entire plan of development It looks at the master plan activity forecasts from the point of view of revenues and expenditures, analyzing the airport’s balance sheet over the planning period to ensure that A/P sponsor can afford to proceed An activity in this phase is the consideration of funding sources and financing methods for the proposed development Questions to be addressed include which portions will be funded through federal grants-in-aid; the size and timing of bond issues; and the revenue from concessionaire rents, parking fees, landing fees etc

ENVIRONMENTAL PLANNING

ENVIRONMENTAL PLANNING For every proposed project, an Environmental Impact Review (EIR) is performed Results of the review may find that there will be no significant impact to the surrounding environment as a result of the project. If so then a Finding of No Significant Impact (FONSI) statement is issued If the EIR reveals that there is the potential for significant environmental impact as a result of the project, then a more comprehensive Environmental Impact Statement (EIS) must be developed EIS states specific areas of the environment that will be impacted and the degree of impact on the environment, and plan to mitigate those impacts