CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 1 GATS Cosmic Dust.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

GWDAW 16/12/2004 Inspiral analysis of the Virgo commissioning run 4 Leone B. Bosi VIRGO coalescing binaries group on behalf of the VIRGO collaboration.
1 Research & Development on SOI Pixel Detector H. Niemiec, T. Klatka, M. Koziel, W. Kucewicz, S. Kuta, W. Machowski, M. Sapor, M. Szelezniak AGH – University.
ADC Performance and Calibration of MDT Chambers
AOSC 634 Air Sampling and Analysis Lecture 1 Measurement Theory Performance Characteristics of instruments Nomenclature and static response Copyright Brock.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
Olin Student Projects 2008 Keith Gendreau Code 662 NASA/GSFC
Fiber-Optic Communications
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Metra Mess- und Frequenztechnik Radebeul / Germany Piezoelectric Accelerometers Theory & Application.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Enea Detectors Range.
Low-cost organic gas sensors on plastic for distributed environmental sensing Vivek Subramanian Department of Electrical Engineering and Computer Sciences.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
9 September 2009 Beam Loss Monitoring with Optical Fibers for Particle Accelerators Joint QUASAR and THz Group Workshop.
Final Presentation By Matthew Lewis 17 th March 2006 “To Determine the Accuracy that GOES True Numbers can Reproduce the Full X-ray Spectrum of the Sun”
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
Detection of trace elements in meteorites using PIXE Presented by: Sasha dos-Santos.
AMS Tracker Data Reduction Status Claude Zurbach Laboratoire de Physique Théorique et Astroparticules – Montpellier Houston, AMS-TIM, January 08, 2007.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
SNAP Collaboration meeting / Paris 10/20071 SPECTROMETER DETECTORS From science requirements to data storage.
AMS-RICH Detector. J. Berdugo – CIEMAT (Madrid, Spain) 1 AMS-02 Phase II Flight Safety Review AMS Ring Imaging CHerenkov PURPOSE: 1.Precise measurement.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Trip-t testing progress report
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
TPC Detector Simulators TPC Fast Simulator & TPC Response Simulator April 9, 2000 ALICE-STAR Joint Meeting.
Eleuterio SpiritiILC Vertex Workshop, April On pixel sparsification architecture in 130nm STM technology ILC Vertex Workshop April 2008 Villa.
Yonsei Univ. M.G. Song.  Introduction  Scope for efforts  Evaluation  Cosmic muon test  Preamp  Summary and Outlook.
Receiver Circuit Testing Test setup Eye diagrams BER measurement Eye - BER relationship.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
EKT 314/4 WEEK 5 : CHAPTER 3 SIGNAL CONDITIONING ELECTRONIC INSTRUMENTATION.
On Chamber Front End electronics Test Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele.
WP 7 (RDH) Detector for high intensity beam WP 6 (IRPT) New TERA chip development Leslie Karen Fanola Guarachi.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
26th Oct 2006CAA cross cal meeting, MSSL RAPID Calibration Status RAPID team.
Activities on straw tube simulation
ProtoDUNE SP – Slow control temperature readout setup test
RAPID/IES Calibration Status Rutherford Appleton Lab
CLAS12 Commissioning with Cosmincs
The Silicon Drift Detector of the ALICE Experiment
GLAST LAT tracker signal simulation and trigger timing study
Gamma-ray Large Area Space Telescope
CMS Preshower: Startup procedures: Reconstruction & calibration
Design of Digital Filter Bank and General Purpose Digital Shaper
Electronics for the E-CAL physics prototype
Level 1 Algorithm Structure
On behalf of the GECAM group
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
BESIII EMC electronics
Integration and Test Organization Chart
Mini Tower Preliminary Results
CONTOUR NGIMS Electronics Test History
B. Genolini for the IPNO detector dept.
Signal Detection & Processing
Presentation transcript:

CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 1 GATS Cosmic Dust Experiment (CDE) Science and Calibration David James University of Colorado/LASP

CDE CDR, September 14, 2004 Your Position, Your Name 2 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 2 GATS Science Goals Monitor the cosmic dust flux variability : CDE measures dust flux using an impact detector. Measurement at S/C is directly related to dust input to the mesosphere.

CDE CDR, September 14, 2004 Your Position, Your Name 3 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 3 GATS Dust Detection using PVDF Depolarization induced current PVDF Film Al/Ni Contacts

CDE CDR, September 14, 2004 Your Position, Your Name 4 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 4 GATS Calibration and Validation Plan Calibration is performed in two steps: Electronics (DN to charge) –Performed at LASP 9/16-9/20 PVDF Detectors (Charge to mass, given velocity) –SDC calibration with dust accelerator in Heidelberg, Germany is complete –Proposed CDE calibration in early 2006

CDE CDR, September 14, 2004 Your Position, Your Name 5 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 5 GATS E-box Calibration Calibration of Electronics was performed at LASP before (abbreviated) and after the environmental (full) testing Tested full dynamic range of each signal chain e charges at 21 individual values (100 events at each of the 21 values injected externally). Tested over full range of E-box temperatures (-26 to 50 o C) –Full calibration at -26, 0, 15, 30, 50°C –Pre-Environmental Calibration at 20 o C Repeated for all 14 channels Total Calibration generated 14 x 5 x 21 = 1476 data sets of 100 hits.

CDE CDR, September 14, 2004 Your Position, Your Name 6 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 6 GATS Calibration Setup – External Charge Injection Injection Circuit to Simulate Detector Signal Environmental Chamber Data Collection

CDE CDR, September 14, 2004 Your Position, Your Name 7 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 7 GATS Sample CDE Calibration Curves

CDE CDR, September 14, 2004 Your Position, Your Name 8 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 8 GATS Simpson-Tuzzolino Curve

CDE CDR, September 14, 2004 Your Position, Your Name 9 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 9 GATS CDE will maximize impact rates CDE detector area ~ 0.1 m  m threshold  m threshold Science requirement: 100 hits/week → 0.7  m threshold mass

CDE CDR, September 14, 2004 Your Position, Your Name 10 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 10 GATS 15 km/s 10 PVDF Detectors hits/week on ~ 0.1 m hits/day To meet science requirement of 100 hits/week must have a noise floor of 10 6 electrons.

CDE CDR, September 14, 2004 Your Position, Your Name 11 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 11 GATS Noise floor well below required 10 6 electrons. CDE satisfies its science requirements! CDE Noise Characterization 9*10 5 e level

CDE CDR, September 14, 2004 Your Position, Your Name 12 GATS CDE Pre-Ship Review October 6, 2005 Science and Calibration David James 12 GATS Calibration Summary Charge injection calibration has been completed and is ready for integration into ground processing software Determination of noise floor via zero threshold noise collection verifies that CDE meets science requirements CDE is ready to ship and meets science requirements