Senior Design 2010 Group 10.  Students  Nathan Dane  Jamin Hitchcock  Eric Tweedt  Advisor  Tien Nguyen  Client  Mary Greeley Medical Center 

Slides:



Advertisements
Similar presentations
For Developmental Services Financial Group (DSFG)
Advertisements

Team members: Van Nguyen, Christopher Waters, and William Tran Client: iapp24 Advisor: Govindarasu.
1 Configuring Web services (Week 15, Monday 4/17/2006) © Abdou Illia, Spring 2006.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
CSE 4939 Hito-Shura Project Manager Harlan Broughton Stephen Link.
1 Project Management & Project Management Software Yale Braunstein School of Information Management & Systems UC Berkeley.
Inventory Control in Stores Dec05-09 Team: Jeff Benson Frederick Brown Christopher Reed Brian Wagner Date: December 6, 2005 Client: ISU Senior Design Program.
Presented By: Shashank Bhadauriya Varun Singh Shakti Suman.
Student Help Immunization Tracking System American DataBank LLC Empowered by.
Final Year Project Presentation E-PM: A N O NLINE P ROJECT M ANAGER By: Pankaj Goel.
Web-based Document Management System By Group 3 Xinyi Dong Matthew Downs Joshua Ferguson Sriram Gopinath Sayan Kole.
Senior Design Group 10 – December 2010 Solution  Our solution to this problem was to design and build a web based application that can be run on the servers.
Joel Bapaga on Web Design Strategies Technologies Commercial Value.
Social Network for Behavior Change Team #11: Gavin Monroe Nicholas Schramm Davendra Jayasingam Client: Yolanda Coil Advisor: Simanta Mitra.
Operating Room Instrument Rapid Delivery System sddec11-03 Group Members: Charles Ristau (Group Manager) Yik Sen Tan (Webpage Designer) Tariq Azmy (Secretary)
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
Scalable Systems Software Center Resource Management and Accounting Working Group Face-to-Face Meeting June 13-14, 2002.
Development Strategies for Web Applications Jonathan Babbage National Superconducting Cyclotron Laboratory.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
Elockbox Team08 Fall2014 Jian Lei Role(s): Project Manager / Builder Da Lu Role(s): Prototyper / System/Software Architect Cheng Role(s):Feasibility Analyst.
Plenary meeting 2015 – Chania - Crete CASCADE Data Services Yusuf Yigini, Panos Panagos, Martha B. Dunbar Joint Research Centre - European Commission.
Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.
TestFiles Life Cycle Architecture Chris Byszeski Ooi Hsu Han Amir Kouretchian Sachin Pradhan Quang Tran Peter Turschmid Nick Walker.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
ICT Standards and Guidelines The Structure of the Project Akram Najjar CNSI – Senior Consultant Director of InfoConsult.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Chapter 7 IS630. Project Design  Technical Design & Specification Network and System Architecture & Design Software System Architecture & Design  Database.
May05-36: Boone Cemetery Management Software Boone Cemetery Management Software May05-36 Greg Thede, Director, Boone Parks Department Dr. Kothari Joseph.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Training.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
By Matt Baker Eric Sprauve Stephen Cauterucio. The Problem Advisors create a sign-up sheet to be posted on the door of their office. These sign-up sheets.
Dec 0605 Team Leader Ryan Wiegel (Cpr E) Team Members Kyle Curran (Cpr E) Seth Gillespie (Cpr E) Carlos Ortiz (Cpr.
Product Tracking Database Sponsored by Aviation learning, Inc. The goal is to create an n-tier, client-server system that will track the product and order.
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
Project Portfolio Management MaestroTec, Inc. Project Portfolio Management Providing the tools and resources necessary to effectively.
SENIOR DESIGN TEAM 11 SPRING Title & Goal Title: Social network website for behavior change Goal: Design a social network that supports/monitors.
Online Radschool Web-Based Software for Radiologic Programs America’s Software Corporation  Call us today for a.
Attack Tool Repository and Player for ISEAGE May06-11 Abstract Today’s world is changing shape as it increases its dependency on computer technology. As.
CSUS Senior Project. Introduction Ryan - Our sponsor, their problem Aaron - Specifications and features Matt- Technical skills - Learning plan Jaspreet.
Abstract Evidence can be the key to convicting someone of a crime, or acquitting a person of charges brought against them. To make sure evidence is carefully.
Budgeting Tool Brandon Ganch Chris George Paul Perello Mike Schmidt.
USER DOCUMENTATION Zaheer Shaikh Noshaba Bakht Eric Tse Mayyapan Ramaswamy.
By : SAG3 Members.  Cross platform client interface for Time recording/capturing  MS Project integration to Time tracker  integration to Time.
FriendFinder Location-aware social networking on mobile phones.
Hatrak Scheduler UsOn Line Demo HATRAK SCHEDLER.
Internet Centralized K-12 Homework Assignment Capability May Client : Senior Design Team Ongo-08 Advisors : Dr. Thomas Daniels Dr. Yong Guan Team.
Web-based Front End for Kraken Jing Ai Jingfei Kong Yinghua Hu.
Schedule of Tasks Summary Estimated Resources and Schedule Proposed Approach and Considerations Abstract Introduction Ames Community Schools (ACS) has.
Senior Design 2010 Group 10.  Students  Nathan Dane  Jamin Hitchcock  Eric Tweedt  Advisor  Tien Nguyen  Client  Mary Greeley Medical Center.
Senior Design 2010 Group 10.  Students  Nathan Dane  Jamin Hitchcock  Eric Tweedt  Advisor  Tien Nguyen  Client  Mary Greeley Medical Center.
ECpE Student Database Team 21 Adviser: Tien Nguyen ECpE and Tony Moore.
Dynamic Website Design for Temple Beth-El of Ithaca, NY CS 501 Project – Final Presentation May 4, 2006 Presented By: Peter Babinski, Christopher Benedict,
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Eugene Marathon 5 Guys. What was planned to this point Main milestones ◦ Write first pass of documentation ◦ Create WebPages ◦ Get server running and.
QA process for Business Catalyst projects.. Starting a project What QA needs to start testing::  Specifications – A detailed description of the product,
Architecture Review 10/11/2004
Quantum Leap Project Management
DCR ARB Presentation Team 5: Tour Conductor.
Software Support Framework
Configuring Internet-related services
SENIOR PROJECT WEBSITE
Website Planning EIT, Author Gay Robertson, 2018.
New Innovations for Medical Students
Install MySQL Community Server and MySQL Workbench
Chapter 5 IS630.
Welcome to Grant Tracker!
CS 4360 Software Engineering
Web-Based Information Management Program
Presentation transcript:

Senior Design 2010 Group 10

 Students  Nathan Dane  Jamin Hitchcock  Eric Tweedt  Advisor  Tien Nguyen  Client  Mary Greeley Medical Center  Chris Figland

 Paramedics need to keep track of several different certifications, class time, and immunizations  Client wants a system where paramedics can enter and modify certification information, receive notifications when certifications are about to expire  About 40 people will use this system

 Certifications are proof of proficiency for skills required by paramedics  Client would also like to be able to manage schedules using our system  Client would like to be able to keep track of continuing education

 User information  Login  Contact information  Access Level  Certification  Name, description, serial number  Expiration date

 Documents  Link to webpage  Link to uploaded file  Continuing education  Class completed  Time completed

 Scheduling  Users can view their schedules, request time off, and request open shifts  Admin can approve time off requests, assign open shifts to a random user

 Admin rights  View all user certifications  View all user Continued Education  Upload/ Manage documents  Add/Drop Users  Manage Schedule (tentative)  User rights  View/Modify certifications  View/ Modify Continued Education  View/Modify personal profile  Request Time off (tentative)

 Easy User Interface  Runs on current MG servers  Availability  Secure

 Time  Knowledge  Availability  Server Setup

 NinthBrain  Designed for large organizations  High monetary cost  Proposed System  Designed for small organizations  Use free software

 Security  HIPAA  Other Hospital information  Mitigation: build secure system  Fines  Missed Certification  Missed Scheduling  Mitigation: error checking, redundant notifications

 Make project plan  System diagrams  Research frameworks  Design documents  Database Schema  Website layout  Detailed design

 * Project plan completed  * Design documents completed  * Development Environment setup  * Database setup  * Website layout completed  * User/Admin profiles completed  * User/Admin logins completed  * User/Admin file upload capability completed  * Notification system completed  * Website traversal completed  * Writing Tests completed  * Running and Evaluating Tests completed  * Move system to production site  * Technical Documentation completed  * Tutorial / Help site completed  * Poster completed

 Login  User Profile  Phone  Certification  User to certification

 Education  User to Education  Document  Document to certification  Schedule  System log

 Linux  Apache  MySQL  PHP

 Prototyping  PHPUnit  Selenium  Firebug

 * Project plan completed  * Design documents completed  * Development Environment started  * Database design  * Website layout completed

 Screen shots approved by client  Setting up test server  Design document completed  Started MVC Framework  Begin Prototyping

 Nathan Dane  Project Plan – Intended Users/Uses, Milestones, Use Case Diagram 2, Problem Statement  Design Document – Login/Main Screen/Schedule Screen shots, Approach, Recommendations  Eric Tweedt  Project Plan – Audience, Use Case Diagram 1  Design Document – Executive Summary, Problem Statement, User/Logs Screen shots, Screen shot generation method

 Jamin Hitchcock  Project Plan – Operating Environment, Concept Diagram, Schedule, Task List, Intellectual Property, Project Tracking Procedures, Effort Estimation  Design Document – Detailed Design, Certification and Immunization Tracking / Documents / Continuing Education Screen Shots  MVC Framework

 Set Up Database  Begin Programming (Prototyping)  Decide on MVC Framework  Write Tests  Finish Programming  Run Tests  Fix Bugs  Write Tutorial – Installation and Operation  Make Poster