Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Slides:



Advertisements
Similar presentations
DLS VERIFICATION TESTING FIELD TESTS TO CHECK DLS OPERATIONS.
Advertisements

Machine Setup. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS? Webinar Information.
Construction Surveys
EXCAVATORS HYPACK 2013.
Section Cross Slope District 1 Your logo here.
AoN Session 2. Highlight a number of cells at the top of the page. Then with the cursor over these cells right click. Scroll down to the format cell.
Overtime Air Request Website (CWEB). Itinerary for this session: Sign In View Past overtime air requests history View Current overtime air requests View.
TOWFISH DRIVER.
Spectrophotometer Jan 28, 2002 Deryck Hong Suryadi Gunawan.
Application of Formal Verification Methods to the analysis of Bearings-only Ballistic Missile Interception Algorithms Eli Bendersky Michael Butvinnik Supervisor:
Setup “Do’s & Don’ts Presented By:
MSU Extension Pesticide Education Turfgrass Pest Management (Category 3A) Application Calculations and Calibration Chapter 5.
Differential Leveling
GPS & Total Station Basics
EXAMPLE 4 Find a margin of error MEDIA SURVEY In a survey of 1011 people, 52% said that television is their main source of news. a.What is the margin of.
© 2014 Cengage Learning. All Rights Reserved. Learning Objectives © 2014 Cengage Learning. All Rights Reserved. LO5 Prepare the Balance Sheet and Income.
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Field-IQ System Boom Height Control. Benefits  Maintain boom height in uneven terrain  Reduce operator fatigue  Consistent spray tip height reduces.
Trimble GCS900 Dual Antenna System Why Trimble uses a Dual Antenna Solution and why it is the better solution?
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
Simultaneous Estimations of Ground Target Location and Aircraft Direction Heading via Image Sequence and GPS Carrier-Phase Data Luke K.Wang, Shan-Chih.
Chapter 7 – Work Sheet for a Service Business
3.2 Data Checking.
What is GPS??? GPS is short for Global Positioning System
Excavator X62 Installation. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?
Heavy & Highway GNSS & Total Stations Basics
In the original lesson we learned that a robot should move forward a specific distance for each rotation. That distance traveled is equivalent to the.
1 Rover setting for Network RTK (GSM) Trimble 5700.
Portable Broadband Seismic Stations - Checking Data Quality Cairo, Egypt November, 2009 Noel Barstow Bruce Beaudoin Marcos Alvarez.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
How Errors Propagate Error in a Series Errors in a Sum Error in Redundant Measurement.
The Cut Cone. The given views show the Front Elevation and part Plan of a cut cone. Draw the following views :- Complete Plan End Elevation Development.
Lecture 5 – Differential Correction
Bonanza Health Card -How to Buy Online??. Download “Bonanza Health” App from Google Play Store. Search for Bonanza Health Care and Click on it. Install.
Microsoft ® Excel 2010 Core Skills Lesson 3 Using Formulas Courseware #: 3243 Microsoft ® Office Excel 2010.
Traffic Forecast Tool An introduction and guide to the Traffic Forecasting tool.
The Larsen Autoblocker Calibrating Your System for Maximum Productivity and Quality.
Solving Linear Equations Substitution. Find the common solution for the system y = 3x + 1 y = x + 5 There are 4 steps to this process Step 1:Substitute.
2D Guidance for Excavators on the 3D Display. Configuring a 2D Hex Machine If this was a 2D only display you would only see “Depth and Slope”
Copy of the from the secure website - click on the AccoridaLife.zip link.
Cut Cones. At the end of this unit you will be able to: Identify a Cone and draw orthographic views of Cones with cut surfaces. Project a cut surface.
EXAMPLE 1 Subtracting Integers –56 – (–9) = – = –47 –14 – 21 = –14 + (–21) = –35 Add the opposite of –9. Add. Add the opposite of 21. Add. a. –56.
Verification & Validation
CTCT PCS900 v1.10 Quick Start Guide Phil Jackson Training Manager March 2010.
Surveying for non-surveyors National Reference points whose Coordinates are known are used to determine coordinate value of points ( or stations) on site.
EXCAVATORS. Excavator.dll : General Settings Contains:  Excavator Dimensions  System Override Values  Useful when a sensor fails  Sensor Adjustments.
3D-MC 2 Basic Functions. This Webinar is LISTEN only QUESTIONS? Questions will be answered in writing at the end of the Webinar.
© 2014 Cengage Learning. All Rights Reserved. Learning Targets © 2014 Cengage Learning. All Rights Reserved. Lesson 6-1 Creating a Work Sheet What: Work.
EXCAVATORS.
CUTTER SUCTION DREDGES. Cutter Suction Configuration Cutter Suction Configuration ` Water Level Chart Datum Channel Design Depth Channel Design Overdepth.
Michael Dix Measutronics Corporation Dredge Positioning Systems: Types of Hardware Sensors Being Used and Why.
Version of document: 2.02 Software CBox: v3 User Manual Application Examples Language: English.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
SUR-2250 Error Theory.
ANSWER SHEET LISTENING (PartⅠ~ Ⅳ) READING (PartⅤ ~ Ⅶ) NO
Deans Community High School
Absence Tracking Year End Processing
CPW PD Welcome Back to CPW!!!
PPT PROCEDURES TO INSTALL PAVERS
2. Further applications of area and volume
LO6 Total and rule the work sheet.
© 2014 Cengage Learning. All Rights Reserved.
© 2014 Cengage Learning. All Rights Reserved.
STUDYING THE ACCURACY OF AFAR-BASED RADAR SOUNDING SYSTEM
Finding and Correcting Errors on the Work Sheet
Graphic Communication
Section 4 Finding and Correcting Errors on the Work Sheet
© 2014 Cengage Learning. All Rights Reserved.
BellWork, Thurs 8/24 Which of these pictures shows accuracy?
Presentation transcript:

Excavator X63 Verification

This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Last Week Webinar Update  Correction on installation information No software termination for bucket sensor Hardware termination on bucket sensor CAN filter for GX Bucket Termination CAN Isolator

Reference Material Excel Verification

Excavator X63 Verification Webinar September 11 th, 2009 Verification Excel Work Sheets TS-1 Calibration Verification MC-A1 Position Verification

Excel Verification Work Sheet

Verification No Verification (Rotation error) Graphics only Not critical

 Start 3DMC and enter simulation mode. TS-1 Calibration and Implement Length Verification

 In Simulation  Set Level String  Match Elevation

Antenna Measurements (using GPS)  Compare GPS measured distance to the physical measured distance to adjust Main/Aux Antenna position  RTK Solution (Single point localization )  Planner Surface  Rover with Pocket 3D

Verifying Main Antenna to Boom Length  Position the machine directly North  Mark bucket location and record Northing value  Rotate 180 o  Position the machine directly North  Mark bucket location and record Northing value

Verifying Main Antenna to Boom Length  Subtract the two Northing values to get a GPS distance 15.50’  Using a tape or Rover measure the actual distance 15.30’  Subtract the two values and divide by 2 ( =.20)/2 =.10 If the GPS measured(Northing) value is larger shorten the length in 3D-MC If the tape measured value is larger lengthen the length in 3D-MC

Excel Verifying Main Antenna to Boom Length

Verifying Aux Antenna to Boom Length  Rotational Heading

Verifying Aux Antenna to Boom Length  Position the machine directly North  Curl the bucket in and record: 3DMC Easting of a bucket corner (position screen) Easting with Rover and Pocket 3D  Extend the bucket to its fullest and record: 3DMC Easting of the same corner (position screen) Easting with Rover and Pocket 3D

Verifying Aux Antenna to Boom Length  Curled bucket Easting: 3DMC Rover  Extended bucket Easting: 3DMC Rover  The difference in curled position =.03  The difference in extended position – =.15  Measured distance from curled to extended 20’

Verifying Aux Antenna to Boom Length  Determine the Aux antenna correction amount using this formula: A(Distance Between Antennas) C(Ext Easting – D (Curl Easting) X B (Curl To Ext Distance) = X 20 = X=.045 Rover Easting's larger (decrease) 3DMC Easting’s larger (Increase)  Curled bucket Easting: 3DMC Rover  Extended bucket Easting: 3DMC Rover

Excel Verifying Aux Antenna to Boom Length

Verifying Main Antenna Offset  Position the machine directly North  Curl the bucket in and record: 3DMC Easting of a bucket corner (position screen) Easting with Rover and Pocket 3D  Extend the bucket to its fullest and record: 3DMC Easting of the same bucket corner (position screen) Easting with Rover and Pocket 3D

Verifying Main Antenna Offset  Curled bucket Easting: 3DMC Rover  Extended bucket Easting: 3DMC Rover  The difference in curled position =.03  The difference in extended position – =.03  If Rover Easting's are larger (increase)  If 3DMC Easting’s are larger (decrease)

Excel Verifying Main Antenna Offset

Verifying Main Antenna Height If 3DMC elevations are higher than the rover increase the antenna height If 3DMC elevations are lower than the rover decrease the antenna height.  Record several 3DMC bucket elevations and corresponding survey rover elevations  Subtract the elevations and find the average

Excel Verifying Main Antenna Height

Testing Machine Sensors for Accuracy

Elevation/Position Errors Wedge errors or Inconsistent elevation errors  Perform Elevation Accuracy Verification to check machine and sensor calibration Overall bias between machine and rover  Perform Main Antenna Height Verification Northing Errors:  Perform Main Antenna to Boom Length Verification Rotational Errors: (curled to extended)  Perform Aux Antenna to Boom Length Verification Easting Errors:  Perform Main Antenna Offset Verification

Address to download all TU-Live Webinars: –Recorded Webinar –PP Presentation; Introduction to Paver System Five –Webinar Q & A Additional requests for TU staff: Questions?