Terminal Learning Objective

Slides:



Advertisements
Similar presentations
Electrical Safety.
Advertisements

New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
VARIOUS WAYS OF TIMING NORMAL TIMING - BLOCK.
STEEL CUTTING CHARGES ACTION: Calculate and place steel cutting charges. CONDITONS: Given a 2 hour block of instruction, students handout, FM ,
John Jossifakis Director of Events Innovations Unlimited ME.
HYDRAULICS & PNEUMATICS
Bridgwater College Electronic Ignition - Programme Ignition.
Primary Instructor SSG Ratliff Primary Instructor.
Preparing a Launch Release Device. Gather the required parts 1 – Appropriate sized balloon 1 – Burner coil 1 – Spool 1 – String with small loop on one.
General Electrical Safety. Why is it so important to work safely with or near electricity? The electrical current in regular businesses and homes has.
Specification Engineering Standard Issuance 4.36.XXX Purpose To specify packaging to preserve and protect purchased parts and assemblies manufactured to.
ESD Constant Monitor System Packaging Bench set-up.
PISTON ENGINES Part 6 Piston Engine Operations (Ignition)
Explosives and Explosions
Weapons Familiarization
Chapter 7 – Serial-Parallel Circuits
Model Rocketry Mr. Capella Technology Education. Parts of a Model Rocket n Nose cone n Body tube n Fins n Launch lug
Gas Transmission Pipelines
Blasting Fundamentals ©Dr. B. C. Paul 2000 Note – The slides that follow present the author’s summary of knowledge commonly held by people well studied.
DIESEL ENGINE ENGINE DEVELOPMENT DIRECTORATE
Battery Fundamentals Chapter 26.
AIR CONDITIONING (COOLING)
Safe Introduction of Electronic Detonators Your host... John Watson The Ensign-Bickford Company.
Wiring Schematics 101 Electrical Symbols Supplemental Inflatable Restraint (SIR) or Supplemental Restraint System (SRS) Icon This icon is used to alert.
May Fiber Optic Technology Basics May 2008 WHY USE FIBER OPTICS?  Superior Signal Quality  Long Distance Signal Transmission  Protection from.
Lighting and Wiring Services
Smart solutions for comfort and safety UL/CSA approval of small motors.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Weapons Familiarization
Electrical Safety in Construction. Objectives In this course, we will discuss the following: Common electrical hazards Standards relating to those hazards.
Background Information  Kit included materials to make seven toys  Called “Eco” Science Toys because many of the materials used were recycled objects.
KB SYSTEMS KB SYSTEMS KB SYSTEMS KB Systems, Inc. Introduction KB SYSTEMS KB SYSTEMS  Designer, manufacturer and installer of bakery.
EMPLOY AN M18A1 CLAYMORE MINE
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
Chapter 7 Safety. Introduction This chapter covers the following topics: Dangers of electricity Preventive measures Electrostatic discharge Safety practices.
Created by Herbert Oxendine, CSP The History of Explosives...
MULTILAYERED CYLINDRICAL ITEMS MADE BY EXPLOSIVE WELDING OF SHEETS WRAPPED INTO SPIRAL V. M. Ogolikhin, I.V. Yakovlev Design & Technology Branch of Lavrentyev.
6/4/ MODERNIZED DEMOLITION INITIATORS (MDI) ( ) ( )
A for Military Ships August What is A? A is a system of: –tube assemblies –tube connectors –tube management closures –fibre bundles –fibre management.
The History of Explosives
Voltage Tester Used for testing voltage on electrical outlets, fuse clips, and circuit breakers will test voltage from 120 to 600 volts.
Technician License Course Chapter 3 Lesson Plan Module 6 – Part 2 Electrical Components 28 March 2015 Practice Questions 2014 Technician License Course.
Explosive Ordnance Disposal Explosive Ordnance Disposal.
BACKGROUND NSTM 300 was completely re-written to clarify and update requirements for today’s increasingly complex shipboard electrical systems. The enclosed.
Page 1 Daiwa, Moving Ahead New Terminal Tackle Program for 2011.
Forensic Investigation of Explosives Chapter 13 Forensics.
This CD-ROM is STRICTLY for IN-DISTRIBUTOR and DEALER USE.
Electrical Testers Basic test equipment used in today’s shops may include an analog type meter, a VAT (Volt-Amp-Tester), DMM (Digital Multimeter),
Blast Gauge Blasters Tool and Supply Company Incorporated has served the blasting industry for over 20 years. During those years we have been dedicated.
Electronic Detonators
All About Workplace Electrical Safety
Apparatus Testing Sugar Land Fire Department Driver/Operator-Pumper Academy Spring 2003.
SQUAD AMBUSH A surprise attack from a concealed position on a moving or temporarily halted target.
Internal Combustion Engines
Scintillating Fiber BLM with PMTs
Agricultural Science Career Development Event Electric Power
Core Competencies Designing protective solutions for building infrastructure and personal military use. Developing protective systems that cope with future.
GrainPro® TranSafeliner™
Circuits Electrical Wiring.
DEMOLITION MATERIALS.
Mr. Capella Technology Education
Core Competencies Designing protective solutions for building infrastructure and personal military use. Developing protective systems that cope with future.
FIGURE 31-1 Internal construction of an oil-cooled ignition coil
© 2012 Delmar, Cengage Learning Battery Fundamentals Chapter 26.
FIGURE 17–2 A grid from a battery used in both positive and negative plates.
Gas Transmission Pipelines
Presentation transcript:

Terminal Learning Objective Action: Introduction to Modernized Demolition Initiators

HISTORY Developed in the late 40s Used in Civilian Market Introduced to the Army in 1996 Supplements and Partially Replaces the M6, M7 and Detonating Cord.

CONSIDERATIONS MDI DOES NOT CHANGE CHARGE EMPLACEMENT OR SETUP MDI IS STRICTLY AN IGNITION SYSTEM CHANGE.

CAPABILITIES Standard military demolition missions Deepwater up to 30 meters Quarrying(with special application). Instant or delay initiation Eliminates accidental initiation from static, transmitters, or electrical discharge Hybrid (two types of firing systems) MDI Stand Alone MDI/Det Cord, Det Cord/MDI

COMPONENTS M12/M13-Cap M15-Cap M11-Cap M14 Time Fuse M81-FI M9 Holder

M9 HOLDER USES: PACKAGING: Secure a blasting cap (small flap end) Secure shock tubes to the blasting cap (larger flap) Can secure up to five shock tubes for initiation PACKAGING: 50 Ea Per box 10 boxes per crate Crate Total- 500

M9 HOLDER SECURING SHOCK TUBE 1-2 Shock Tubes Looped under holder Tied in a knot

M9 ISSUES Secures only high strength caps (M11 & M14) NOT REUSBLE Unit must request enough to support all training and live fire missions

M11 BLASTING CAP A branch line to a primary charge To ignite shock tube or detonating cord “High Strength Cap”

M11 DESCRIPTION 2 FLAGS J HOOK CONNECTOR Used to secure det cord 1 YELLOW (two meters from cap) 1 RED (one meter from cap) J HOOK CONNECTOR Used to secure det cord PACKAGING Individual coil—30ft. long 6 coils per fiber board box 10 boxes per crate Crate Total= 60 coils

M11 ISSUES Do Not Secure Det Cord and Shock Tube in the Same Holder Do Not Hold Shock Tube When Firing Use J- Hook to Secure to Det Cord Plug and Sealed End

Relay for the initiation pulse to another relay or high strength cap M12 TRANSMISSION LINE Relay for the initiation pulse to another relay or high strength cap Low Strength Cap Command Detonation “ Transmission Line Only”

M12 PACKAGING 500 FT. per spool 2 Ea spools per foil bag 4 bags per crate Crate total- 8 spools/ 4000 Ft.

Relay for the initiation pulse to another relay or high strength cap M13 TRANSMISSION LINE Relay for the initiation pulse to another relay or high strength cap Low Strength Cap Command Detonation “ Transmission Line Only”

M13 PACKAGING 1000 Ft spool 1 spool per foil bag 4 bags per crate Crate Total= 4 spools/ 4000 Ft

M14 TIME DELAY “High Strength Cap” 5 minute delay Length may be adjusted Detonates Explosives, Det Cord or Shock Tube

M14 PACKAGING Approx. 7 ½ ft. long 6 coils per fiber board box 10 boxes per crate Crate Total= 60 Coils

M15 CAP, DELAY “ Currently a specialized use item only”

M15 USES Provide a Delay in the System for Staged Demolitions Is usually used for Quarrying Operations

M15 PACKAGING 70 Ft Individual Coils 6 Coils Per Fiber Board Box 10 Boxes Per Crate Crate Total- 60 Coils/ 4200 Ft

M81 IGNITER To Ignite Time Blasting Fuse (M14) Ignite Shock Tube M81 has a stronger cap than M60, heavier case, and 2 plugs

M81 PACKAGING 5 Per Fiber Board box 60 Boxes Per Crate Crate Total - 300 Igniters

SPLICING MATERIAL PACKING: USES: 5 Ea Per Plastic Bag 1 Bag Per Spool of M12 or M13 USES: To repair a Damaged Section of Shock Tube To increase standoff

Enabling Learning Objective 1 ACTION: PRIME EXPLOSIVES USING MODERNIZED DEMOLITION INITIATORS (MDI) 051-193-1103* CONDITIONS: You are given quarter-pound blocks of TNT, a priming adapter, string, a sandbag, M2 crimpers, and a section of Mll branch line. Some iterations should be performed in MOPP 4. STANDARDS: You will prime the TNT with MDI-with and without the priming adapter so that the blasting cap remains in the cap well and is not damaged or handled in a way that could cause detonation of the explosive while priming. * Reference TC 5-150 Engineer Qualification Tables

Enabling Learning Objective 2 ACTION: CONSTRUCT A NONELECTRIC INITIATING ASSEMBLY WITH MODERNIZED DEMOLITION INITIATORS (MDI) 051-193-1055* CONDITIONS: You have been given detonating cord, an Mll branch line, an M12 transmission line, an M81 fuse igniter, an M14 time-delay fuse, an M9 holder, J-hooks, adhesive tape, a sandbag, and M2 crimpers. Some iterations should be performed in mission-oriented protective posture (MOPP) 4. STANDARDS: You will construct a nonelectric initiating assembly-using MDI correctly and in sequence. You will attach the assembly to a detonating-cord firing system so that, when initiated, it will detonate as if it were live. * Reference TC 5-150 Engineer Qualification Tables

Enabling Learning Objective 3 ACTION: CONSTRUCT A DUAL-FIRING SYSTEM WITH MODERNIZED DEMOLITION INITIATORS (MDI) 051-193-1202* CONDITIONS: You are given detonating cord, an Mll branch line, an M12 transmission line, an M14 time-delay fuse, priming adapters, M9 holders, M81 fuse igniters, quarter-pound blocks of TNT, M2 crimpers, a sandbag, and adhesive tape. Some iterations should be performed in MOPP 4. STANDARDS: You will dual prime each charge using a combination of both MDI and detonating cord. You will correctly tie the charges into a combination firing system (also consisting of MDI and detonating cord) so the charges will detonate. * Reference TC 5-150 Engineer Qualification Tables

SUMMARY MDI Components Constructing a Nonelectric Initiating Assembly Constructing a Dual-firing System Priming Explosives