BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA There is more project at the end of the money! Matt Blume, GM Catalent Pharma Solutions.

Slides:



Advertisements
Similar presentations
HIV Drug Resistance Training
Advertisements

OptiShip ® Multi-carrier Shipping System. OptiShip ® customers save on average 13.6% of parcel shipping costs… OptiShip ® is a comprehensive system that.
Clinical Trial Supply Management: A virtual company’s lessons learned Bruce H Morimoto, Ph.D. May 30, 2013.
Many Important Issues Covered Current status of ICH E5 and implementation in individual Asian countries Implementation at a regional level (EU) and practical.
Understand Merchandise Planning in Retailing. The Merchandise Plan A budgeting tool that helps retailer or buyer to meet department goals ▫Planned sales.
Beyonce Vs. Buffett: Why Conservative Energy Efficiency is More Cost-effective than “Sexier” Policy Options Sue Libenson, Libenson Consulting, ,
BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA Tufts CSDD Global Clinical Supply Chain Market Study Mary Jo Lamberti, PhD Senior Project.
“JIT Warehousing Operations” by Total Express
Supply Chain Management Managing the between all of the parties directly and indirectly involved in the procurement of a product or raw material.
Self inking rubber stamps Do you need a return address stamps? How about a bank deposit Stamp? Ready for pick up within an hour.
Supply Chain Logistics Management
| LUMIS International GmbH | Successful conduct of clinical trials to prove biosimilarity through defining a best fit outsourcing strategy Heike Schoen,
Inventory Management for Independent Demand
Tom Parke Implementing Adaptive Clinical Trials 4: Drug Supply.
Chapter What kinds of transactions are recorded in a purchases journal? A) Merchandise bought on account B) All cash payments C) Sale of merchandise.
Copyright © 2012 Pearson Education. All rights reserved Copyright © 2012 Pearson Education. All rights reserved. Chapter 10 Sampling Distributions.
E-Commerce and Supply Chain Management (SCM)
Protocol Complexity as a Factor in Vendor Management Compliance Risk
By J.Thitiri KEMRI-Wellcome Trust Research Programme Kilifi, Kenya PHARMACY AND PRODUCT ACCOUNTABILITY Version: 14-Nov-2009.
1 S ERVICE · A CCOUNTABILITY · V ALUE · E FFICIENCY.
The Purchasing Function
Test Materials Aids/Tools Available Distribution Model Additional Orders.
E-Commerce and Supply Chain Management (SCM) Chapter 4.
Public Education Partnership Seminar September 1, 2015
BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA Solving the Missing Link Between Forecasting and ERP in Clinical Supply Optimization Michelle.
Customer Service. My Account Options Click Here To See Order Details.
Chapter 16 Global Logistics and Materials Management.
BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA S&OP Execution to Dynamically & Optimally Respond to Volatility in a Global Supply Network.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
D699BC00001(FALCON) Drug Supply.
CONFIDENTIAL Presentation to Erin K. Bennett July 10, 2012 Central Laboratory Services.
E-Commerce and Supply Chain Management (SCM) Chapter 4.
On-Demand: Transforming Trial Design at the Program Level.
Z-Scores Continued Ch. 6 Day 2 AP Statistics EQ: What is the normal distribution and why do we use it?
Confidence Intervals for Proportions Chapter 8, Section 3 Statistical Methods II QM 3620.
Developed by Cool Pictures and MultiMedia Presentations Copyright © 2004 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Developed.
Copyright 2010, The World Bank Group. All Rights Reserved. Producer prices, part 1 Introduction Business Statistics and Registers 1.
Inventory Management for Independent Demand Chapter 12.
Levers enabling industrialised deployment and a effective multi-vendor eco-system We wish to assess the current position of these levers and the opportunity.
IP Accountability in Outpatient Clinical Trials
© 2012, Genentech BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA "Building the Biotech Supply Chain: Adolescence to Maturity: What Does.
Landed Cost Management Update
Inventory Management for Independent Demand Chapter 12, Part 1.
2015 Scholarship Recipients John Cutler MBA Scholarship Jonathan Wood – University of Tennessee Myron B. Smith & Dr. John Metzger Undergraduate Scholarship.
EC&O – BUSINESS Business Benefit Due to OMNI. OMNI – Complete EC&O Solution What is EC&O stands for… Real Estate Developer Developer plus contractor Core.
© 2014 SunPower Corporation | Confidential | 1 © 2014 SunPower Corporation | Confidential Reducing Reverse Logistics Costs Andrew Katcher SunPower Global.
EPowerHouse Training GLOSSARY. Terms and Definitions Activities – Activities Menu – Enter orders, customers, receipts, and vendors into the ePowerHouse.
Dynamics GP Inventory GPUG St. Louis Chapter Meeting Tuesday, September 15 th, Getting more out of your.
Just in Time Labelling in the EEA Duncan J Donald VP Quality Europe Yourway transport Biopharma Services.
The Rewards of Flat Rate Shipping
Original Bagel achieves paperless Lot Traceability by installing the ‘Vantage’ Formula Control & Traceability Solution from SG Systems LLC SG SYSTEMS -
The Advantages of Flat Rate Shipping
The Huge Benefits of Flat Rate Shipping
Inventory control and recent trends in PPC
Local Government Corporation Resource 2016 NextGen Trustee Year End.
Budget Monitoring - Forecasting Ann Sambrook Education Financial Services EFS.
Improving the accuracy and efficiency of your shipping process
Samples importation (for registration purposes)
Using Mobile Phones to Monitor and
Reducing Order Lead Times and Supply Chain Variability
Faraday Future Shipping Portal Instruction Manual
Supply Chain Services Program
CBI - Clinical Trials Budgeting and Forecasting
Chapter 10: Adjustments to the list of quoted prices
International logistics and export
Inventory control and recent trends in PPC
Best Practices Consortium
“One size does not fit all”
Utilization of Drug Pooling to Optimize Complex Drug Management
Presentation transcript:

BIOTECH SUPPLY October 8-9, 2012 Crowne Plaza, Foster City, CA There is more project at the end of the money! Matt Blume, GM Catalent Pharma Solutions

Global Phase III Clinical Trial –36 Countries –3000 Patients –200 Sites –30 Languages – Regional Booklets –Multiple Arms –Limited Drug Availability –Possible Compassionate Extension –Dose Adjustments –Country list may change –Internal Pressure for accelerated FPI Date 9/5/2015 2

STRESS! –Main focus on supply and clinic start date –Total returned goods budget through 2016? 9/5/2015 3

Objectives Presentation Goals: –Increase awareness of changing trial contract environment –Examples where early communication would have changed outcomes –Take-away list of items to consider –Save everyone at least one headache on a future trial 9/5/2015 4

Contract Environment Traditional Model: 9/5/ Sponsor Company Estimated Contract Packaging and Distribution Vendor

Contract Environment New Model: 9/5/ Sponsor Company All –Inclusive Contract Clinical Research Organization Packaging and Distribution Vendor Exact PO

Real Example Clinical Trial Shipping To Global Depots Total contract courier estimate of ~$500k for life of 3 year contract Multiple shipments to Ukraine Duties and Taxes were approximately $50k per shipment Duties and Taxes not included in original budget, drove total courier cost for study over $1M Headache for sponsor, CRO, and Distributor 9/5/2015 7

Real Example Mid-Sized phase 2 trial with 40 sites and 400pts 24 month trial duration – Storage and Distribution Only Original estimate averaged 5 pallets/month of storage for study Kit size much larger than assumption, received 45 pallets several months into study Number of shipments was also higher than estimated Drove increased storage, distribution (Controlled Ambient), freight and returns costs Total budget increased from ~$76k to ~$450k 9/5/2015 8

Items to Consider What is the purpose of the budget internally? Rough estimate based on current assumptions Precise forward calculation of total spend for the trial Let the above answer drive the amount of rigor put into the original contract Multiple versions are good! Good idea to have team meetings to build, and three- way meetings if there are multiple contract holders 9/5/2015 9

Take-Away List of Specifics Storage and Receipt: Ensure the number of items / size of those items are accurate –How many items will fit on a pallet? –If cold-chain, what is the exact size of the location the items will be stored in and how many will fit? Will there be one large shipment of supplies to vendor, or could it possibly be split into multiple shipments If finished, shippable kits are sent, are they be split up by treatment group or blended together Do a “reality-check” shortly after initial receipt. 9/5/

Take-Away List of Specifics Packaging and Labeling: Usually the most visible and defined portion of contracts. Variations to scope are easily identified Booklet Labels –Small Changes in design or ordering approach can greatly alter cost –Best approach is an actual quote from booklet vendor for best-guess design rather than a placeholder estimate Unit Dose Cards –Best to receive actual quote rather than placeholder 9/5/

Take-Away List of Specifics Distribution: What is the planned shipping strategy? Ensure that the plan matches IxR system. –Number of items sent per shipment –Size of the shipper and estimated freight –Number of planned shipments per site –Initial order size vs resupply size –Especially important with controlled temperature studies Example: –Small CRT study with large kits. One kit fit in a large (~50lb) shipper. Shipping plan was 2-3 kits per shipment, but IVR was set for 14 kit seed orders. –Changed to specialty courier to unload / take away boxes – Increased cost by ~$20k for study. 9/5/

Take-Away List of Specifics Distribution (Cont): International Studies –Bulk Shipments to Depot – Same size, or varying quantities? –Pallets vs. Large shippers –Freight estimates –Estimated taxes and duties –Specialty courier quotes better than estimates – current fuel surcharges and assumptions –Approximate duration of shipment – appropriate shippers (48hr vs 72hr) 9/5/

Questions Q & A 9/5/