TCS Chiller Performance Review

Slides:



Advertisements
Similar presentations
ADX 150 – Engine Repair ADX 170 – Climate Controls
Advertisements

Engine Overheating.
Transportation Tuesday TRANSPORTATION TUESDAY VEHICLE CARE BE AWARE !! Reliable vehicle care = Safety and Dependability.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
 Description of PressurePro System  Identify system components  Display and Operational Modes  Sensor alerts  Checking of tire pressures  Manual.
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
© Goodheart-Willcox Co., Inc.  Cooling system diagnosis  Cooling system problems  Thermostat service  Cooling system hose service  Radiator and.
INTRODUCTION IT’S ALL ABOUT YOUR PERSPECTIVE. WATER DAMAGE IS RESPONSIBLE FOR GREATER THAN 25% OF RESIDENTIAL INSURANCE CLAIMS ANNUALLY. IN THE U.S. THAT.
Unit 205: Cold water systems
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G W LIGO II Pre-stabilized Laser System Design Requirements and Conceptual Design David Ottaway, Todd Rutherford, Rick Savage, Peter Veitch,
 Computers, like any other piece of electronic equipment, need special care and attention in order to perform properly and safely.  It is always true.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
Chapter 4 (continues) Pipe Network.
Hydraulics For The Long Term
Circuits and Symbols. The flow of electrons through a circuit Electricity A closed circuit allows electricity to flow An open circuit has a break so electricity.
MAINTAINING AND TROUBLESHOOTING COMPUTER SYSTEMS UNIT 6.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Presentation on Feed and Expansion Cistern. Central Heating At the end of this part you should be able to: Identify general system methods of feed and.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Hardware Analyser vs Software Analyser
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
POWER FLUCTUATIONS Computer Systems. Power Fluctuations Voltage is the force that moves electrons through a circuit Unsteady voltages are called power.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
3.0 Comprehensive Performance Audit Fossil Fuel Appliances Health & Safety 3.2.
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
WATER SYSTEM WORKSHOP February 27, 2012
LIGO-G W Status of the LHO PSLs Rick Savage LIGO Hanford Observatory LIGO Scientific Collaboration Meeting August 13-16, 2001.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
Industrial Resources, Inc.
IBBelle: Status & Plans
IC3 GS3 Standard COMPUTING FUNDAMENTALS Module
Leakage control in transmission pipelines
Re-circulating CO2 Test System
Which Parts Get Affected Due to a Bad Radiator
Recirculating CO2 System
Soldering & Desoldering
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Rajan Bhandari Senior Lecturer
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Improving LIGO’s stability and sensitivity: commissioning examples
Pick Light Inspection Program
Presentation transcript:

TCS Chiller Performance Review Phil Willems Nov. 17, 2004 LIGO R&D

Design Requirements Laser temperature: around room temperature, ±.5K Flow rates: Device Max power dissipated Flow requirement Source of requirement Carbon dioxide laser 80W ½ gpm Access Laser Co. Laser power supply 40W ‘cool to the touch’ AOM 30W 250 ml/min IntraAction, Inc. AOM driver TBD Noise: acoustic and EMI must be under ambient at nearest sensitive device (optical lever system) Monitoring and control from control room using EPICS Leak tight and robust LIGO R&D

Commissioning Timeline Device was installed on 2K Y arm Oct. 27-29 Device was commissioned from Oct. 29 to Nov. 8. Commissioning paused after overheating incident Nov. 6-7. Forensics from Nov. 8 to today. LIGO R&D

Installation Site chilled water delivered to chiller from over 100 feet away through uninsulated copper pipe This may account for some temperature issues and surges during control valve operation Site chilled water and TCS table water pipes interlaid and touching Insulation of TCS table supply pipe required for temperature stability Prototype control electronics not plug and play Control software implemented but not safety interlocks LIGO R&D

Commissioning Submerged thermistor failed after 2 days (Nov. 1) Thermistor was fine; problem later traced to bad solder joint outside chiller Short term solution was to glue another thermistor to pipe leaving chiller Laser power stabilized without AOM on (Nov. 3-5) Laser power unstable with AOM on (Nov. 5) Chiller noise performance verified (Nov. 6-7) http://blue.ligo-wa.caltech.edu/ilog/pub/ilog.cgi?group=detector&date_to_view=11/07/2004&anchor_to_scroll_to=2004:11:07:22:32:32-robert LIGO R&D

Overheating Incident After noise test, chiller was switched on to run overnight Apparently, one or both pumps failed to switch on System ran at very high temperature for about 1-2 days Much damage and corrosion to the chiller Thermistors on TCS table showed no overheating, no flow to table- TCS table not affected LIGO R&D

Why a Chiller Is Not a Boiler LIGO R&D

Overheating Incident Analyzed Without submerged thermistor operating, no way to monitor chiller reservoir temperature Without software interlocks programmed, system could not power down safely had the submerged thermistor worked Had system been fully operational before running unattended chiller would have safely shut itself down Why did pump fail to start? LHO reports that all Rio pumps studied failed to start 100% of the time LIGO R&D

Forensics Chiller disassembled, analyzed, and rebuilt Now it runs well even with the AOM on (for 30 minutes at least…) Rio 1100 pumps tested for reliability One pump tested by hand- 200 starts without failure One pump tested by robot- robot itself not 100% reliable, but pump starts ~15,000 times without failure Rio 2100 pump known to fail at LHO now under test Coolant corrosion tests Chloramine T not compatible with chiller components under accelerated aging test Propylene glycol and sodium hydroxide are compatible LIGO R&D

Chiller Performance After Rebuild LIGO R&D

Final Results Compared to Requirements Temperature of chiller and laser held to within .5K, as required Flow rate is 1.3GPM, as required Acoustic and electromagnetic noise is below ambient, as required Operation fully controlled and monitored from the control room, as required System is not yet robust to failure modes Design not fully implemented, software interlocks missing when needed New safeties can be added without change to conceptual design LIGO R&D

Are the Design Requirements Good Enough? The TCS laser stability is unverified even though the TCS chiller meets requirements. Laser power and coolant temperature fluctuations are frequently correlated. Is .5K temperature stability sufficient? Is 1.3GPM flow sufficient? Recommend that no more TCS chillers be installed until reconditioned prototype performance is verified. New chiller parts will replace boiled parts Software interlocks will be fully implemented Hardware interlocks under consideration Plan new commissioning effort Nov. 29-Dec. 3. LIGO R&D