Installation, Inspection, & Maintenance of Post Construction BMPs Or… Save the Swales Or… So You Wanna Treat Stormwater, Huh? Darren Greenwood City of.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

1 Effluent Guidelines for Construction Greg Davis USEPA
CITY OF HOUSTON FLOODING & DRAINAGE COMMITTEE PUBLIC WORKS AND ENGINEERING May 18, 2010.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Making Bioretention Work Sustainability for all the places between the buildings.
Cascade Charter Township
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Env 247 Overview of Stormwater Management March 1, 2011.
Stormwater Management
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Design of Open Channels and Culverts
Managing the Environmental & Project Development Process StormwaterManagement.
Stormwater Master Plan University of North Carolina Peter A. Reinhardt Sharon Myers, L.G. Department of Environment, Health and Safety.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Sanitary Engineering Lecture 16
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Storm Water Pollution Prevention Training
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Background and Overview Stormwater NPDES Compliance For New Developments.
Dan Cloak, P.E. 18 September 2007 to achieve water quality benefits in Contra Costa County Implementing Low Impact Development.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Erosion & Sediment Control. Wind Erosion Water Erosion.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Low Impact Development (LID)
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
From the Beginning Design Standards and Other Post-Construction Program Elements.
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Basic Hydraulics: Storm Water Management concepts
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Steven Peene, PhD Director of Water Resources Applied Technology and Management, Inc. Overview of FDOT’s Statewide Stormwater Management Plan (SSWMP)
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
City of Clarksville Storm Water Management Manual Revisions 2014.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Drainage and Grading Creating stable ground surfaces
WORKSHOP I: Green Infrastructure Overview and Maintenance
Sacramento County Stormwater Quality Program
MIDS calculator Quantifies reductions in runoff volume for a given BMP or group of BMPs Quantifies reductions in phosphorus (P) and TSS runoff for a given.
Kickoff example Create a new file
Intro MIDS Calculator Use
MIDS Calculator Use - Intermediate
MS4 OVERVIEW 2015.
Sacramento County Stormwater Quality Program
Presentation transcript:

Installation, Inspection, & Maintenance of Post Construction BMPs Or… Save the Swales Or… So You Wanna Treat Stormwater, Huh? Darren Greenwood City of Livermore

Why Require Post-Construction Stormwater BMPs? Phase I Programs – Permits Require Treatment to Reduce Pollutants AND Now Controls to Minimize Runoff Volume Also. SUSMP – Standard Urban Stormwater Mitigation Plans Defined as “MEP” Phase II Programs – Permits Will Require Treatment in the Future if Not Already Like it or Not, it’s Coming to a Permit Near You…So Why Not Do it Right!

Post Construction BMP Selection – What Works? Manufactured Controls Filter Inserts – Very Limited Applications, Very Questionable Effectiveness, “Token” Controls Separator Systems – “Swirl” Separators, Combination Separators. Better, But Still Limited, High Cost, High Maintenance Vegetated Controls Bioswales, Filter Strips – More Effective, Lower Maintenance, Not “Out of Sight Out of Mind” Retention/Detention Basins Effective, But Require Large Land Area

Examples of Post Construction Stormwater BMPs Bioswale in Parking Lot Swirl Separator in Parking Lot

Examples of Post Construction Stormwater BMPs Detention Basin Adjacent to Residential Development

Implementing BMPs for New Development Projects Two Possible Approaches: Overhaul Entire Development Approval Process to Adopt “Bulletproof” Legal Authority Change Zoning Ordinance, Development Standards, Standard Details, Specifications Rely on Authority Contained in Stormwater Management Ordinance and NPDES Permit In Other Words “Wing It” and Bluff Your Way Through…No One Will Challenge You Anyway

Implementing BMPs for New Development (continued) Livermore Staff Have Required Swales Routinely for 4 Years Without Challenge Adequate Authority Exists in Stormwater Ordinance & NPDES Permit Developers Mostly Just Want to Know What They Need to Install to Get Their Projects Approved Anyway

Legal Authority for Post Construction BMPs Stormwater Ordinance Requirements: Where best management practice guidelines or requirements have been adopted by any federal, state of California, regional and/or city agency for any activity… every person undertaking such activity or operation, or owning or operating such facility shall comply with such guidelines or requirements … NPDES Permit Provisions – Specifically Require Treatment Controls for New Development Projects

Legal Authority for Post Construction BMPs (cont.) Specific and Detailed Ordinance Requirements and Specification are Always Best, BUT Don’t Get Bogged Down Waiting for them, AND Stop Using That as an Excuse to Continue Doing Nothing! Avoid “PLANNER PARALYSIS” and Just Do It!

Getting the Word Out To Developers Start as EARLY as Possible in the Planning Process to Avoid Resistance Clear Guidance Doesn’t Necessarily Mean Designing it For Them…Let the Design Engineers Earn Their Money! Sites Vary Anyway….No One-Size Fits All Solutions General Guidance, Requirements, AND Educational Resources

Design Resources Start at the Source – Design & Technical Manual Developed by BASMAA

Livermore Swale Design Guidelines Compiled From Various Studies/Resources Longitudinal Slope between 1-5% Adequate Underdrains to Prevent Ponding Over 3% Slope May Require Check-Dams No Ponding Longer than 48 Hours Side Slopes no more than 3:1 (Horizontal to Vertical) Swale Bottom Must be Graded Flat to Improve Pollutant Removal (No V-Ditch)

Livermore “Draft” Swale Guidelines (continued) Swale Bottom Should be 4-6 ft Wide, but at Least 2ft Minimum Velocity Not to Exceed 2 ft/sec, Ideally Should be 1 ft/sec. Use Manning Equation with 2 n Factors – Low Flow and High Flow Conditions, OR….. Use the Source Guidance of 1200 sq ft of Usable Swale per Acre of Impervious Surface of Drainage Area

Livermore “Draft” Swale Guidelines (continued) Residence Time Should be 10 min or Greater in Swale to Maximize Pollutant Removal Swales in Residential Parkway Strips Must be a Minimum of 12 feet wide. 15 ft or More is Recommended Use Imported Soils or Sand in Areas of Low Permeability to Reduce Ponding Starting to Require Signed Maintenance Agreement for Treatment Controls

What Does a Bioswale Look Like & How Does it Work? Rainfall on impervious surface Runs off into swale over flush or notched curb Runoff flows down swale Some water inflitrates into soil Plants absorb some dissolved pollutants as micronutrients Remaining runoff enters drain Filtering out solids and pollutants

Examples of Livermore Swales Residential Area With Swales, ft Streets to Minimize Impervious Area Parking Bays, Separated Driveways, Disconnected Roof Leaders

Examples of Livermore Swales Parking Lot Swale With Flush Curb and Wheel Stops

Swale Installation Tips Lowest-Level Laborer on Jobsite Can Cause Huge Problems – Landscapers Key Remember, it’s Not Just Landscaping, it’s a Drainage System, and MUST be Installed Carefully to Avoid Low Spots Install Turf 1-2 in BELOW Pavement or Curb to Allow Flow Into Swale Use Cobbles at Curb-Cuts as Energy Dissipaters to Reduce Scouring of Turf

Installation Problem Example Turf Installed Too High Creates “Lip” & Restricts Flow Into Swale Swale Graded to “V-Ditch” Limits Effectiveness & Channels Flow

Swale Plan Review Tips Don’t Assume Vegetation is Turf – Check Landscaping Plans Closely Ensure Swale is Wide Enough to Do Some Good – Check Grades & Side Slopes Ask for Clear Drainage Plans Showing Swale Area in Sq Ft and Contributing Drainage Area in Acres to Check 1200sqft/Acre Requirement Check Utilities (hydrants, lights, transformers, valve boxes) Often Shown on Separate Sheets

Plan Review Oversights Check Landscaping Plan…Bark & Bushes in Swale Check Grading – 10 ft Wide But Only 2- 3ft are Usable due to Grading

Planning and Installation Oversights Installed Too Flat With No Underdrain Creates Standing Water Plan Omitted Turf or Vegetation, Allowing Cattails to Invade the Swale

Inspecting BMPs - Vegetated Swales Properly designed swales need less maintenance than manufactured controls…Basically Mow & Water Inspections: look for sparse vegetation, channeling, erosion, ponding. Check inlets for debris.

Inspecting BMPs - Separators & Inlet Filters Inspect Device for Accumulated Oils, Sediment, Debris. Check Depth of Solids in Separators Pump Out Liquid & Sediments at Least Annually, if Not More Often Refer to Vendor Specifications for Cleaning Frequencies Visually Inspect Inlet Filters for Debris and/or Clogging

Maintenance of Post Construction BMPs Separators – Pump Out and Remove Solids Based on Manufacturers Specifications or More Frequently to Remove Scouring During High Flow Events Basins – Remove Accumulated Solids, Clear Vegetation if Necessary to Eliminate Standing Water, Repair Erosion of Side Slopes Swales – Reseed if Necessary, Maintain Permeability With Aeration, Remove & Replace Soils After Years If Necessary

Summary/Conclusions Don’t be Afraid to Start Requiring Treatment Controls NOW – Avoid “Planner Paralysis” Notify Developers of Requirements ASAP Give Guidelines and Education But Let Developers Design Controls Check Plans Closely for Adequate Sizing, Slopes & Vegetation Types Stress the Importance of Good Installation Techniques & Inspection (No Low Spots or Elevated Turf “Lips”)