Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.

Slides:



Advertisements
Similar presentations
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Advertisements

Fast-Ion-D-Alpha and Solid-State NPA Diagnostics for NSTX-U NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U Team Meeting Stefan Gerhardt Contributions from B. Stratton, R. Kaita, A. Diallo, and J. Hosea and the NSTX Research Team August 2014 Team Meeting.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
NSTX-U FY2014 Q3 progress report: Upgrade Construction Progress Ron Strykowsky, Erik Perry, Tim Stevenson, Larry Dudek, Jim Chrzanowski, Steve Langish,
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Project Overview Ron Strykowsky Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 February 4th, 2014 NSTX-U Supported.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
XP1518: RWM PID control optimization based on theory and experiment S. A. Sabbagh, J.W. Berkery, J.M Bialek Y.S. Park, (et al…) Department of Applied Physics,
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle NSTX Run Usage 27 February – 5 May, 2006 NSTX Mid-Run Assessment PPPL, Princeton,
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTXU Project Update Jim Chrzanowski, Larry Dudek, Erik Perry, Tim Stevenson, Ron Strykowsky and the Project Team October 4th, 2013 NSTX-U Supported by.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
Research Operations Update S. P. Gerhardt J. Hosea, R. Ellis, R. Kaita, L. Roquemore and the NSTX Research Team NSTX-U Team Meeting B318 5/7/2013 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
Wave Heating and Current Drive TSG: XMP/XPs for the 2015 NSXT-U Campaign RF-TSG R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli Univ. Rep: P.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Automatic Rampdowns S. Gerhardt, et al. and the NSTX Research Team Meeting name Location Date NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
J-W. Ahn 1 K.F. Gan 2, F. Scotti 3, R. Maingi 1, J.M. Canik 1, T.K. Gray 1, J.D. Lore 1, A.G. McLean 4, A.L. Roquemore 3, V.A. Soukhanovskii 4 and the.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTXU Construction Progress – April 25th, NSTXU Construction – PUMPDOWN November 1998 NSTX turned over to operations February 1999

NSTX-U NSTXU Construction Progress – April 25th, Good progress continues on NB and Machine Installations Pumpdown December 2014

NSTX-U NSTXU Construction Progress – April 25th, Recent Accomplishments & work underway Neutral Beam DI piping contract completed and tested. HVE water line installation has been completed in NTC. Flexible hoses for the HVE lines can now be measured and fabricated. Pipe connections to the DI water pumps continued in the Pump Room. Neutral Beam cabling contract completed. NB duct installation completed Neutral Beam Armor installed VV feet installation complete. PF 4/5 support installation complete. Torquing of the upper outer TF support weldments to their final torque levels has been completed The installation of the MPTS vacuum interfaces has been completed and they have passed leak check Center stack casing stud installation complete and ready for PF 1B installation (PFC’s to follow) CS pedestal prefit completed RF antennas removed. Center compliant conductor posts delivery in April. Installation in MAY.  Diagnostics incl racks and cabling re-installation underway  Bus bar fabrication continues... trial fit-ups under the vessel continue  2 PCHERS passive plates being fabricated by Major Tool with delivery expected May.  PFC installation started in the vacuum vessel.  DCPS stage I testing continued using the Autotester (AT) and waveform input files  Startup planning underway with PPPL Activity Certification Committee (ACC) and Operational Readiness Assessment

NSTX-U NSTXU Construction Progress – April 25th, Neutral beam component installation nearing completion Neutral Beam & TIV valve Neutral Beam connecting duct assembly (bellows(2),VPS duct) being lowered into position Entire assembly leak tested prior to installation Neutral Beam connecting duct assembly (bellows(2),VPS duct) being lowered into position Entire assembly leak tested prior to installation Vacuum Vessel Bay J/K port Source installation planned for June

NSTX-U NSTXU Construction Progress – April 25th, NB component installation (cont) Overhead view of duct assembly Neutral Beam Armor Installed

NSTX-U NSTXU Construction Progress – April 25th, OH Coil Winding Going Well Started winding 4 th and final layer Good progress on the centerstack

NSTX-U NSTXU Construction Progress – April 25th, Major milestones to completion Completion of OH winding should occur by May 5th VPI completed by May 31 Complete OH/TF activities: May thru July –Removing Aquapour –Final OH testing –Silver plate electrical contact surfaces, Fit-up and installation of laminate crowns –Finalization of TF fittings and bulkheads, Installation of Belleville washer assembly –Assembly and install of PF1A& C coils, Apply ground plane and diagnostics to OH surface –Install “Micro therm” insulation Install CHERS PP June Install HHFW compliant center post May-June Last Access to Vacuum Vessel June 14th Transport CS to NSTX Test Cell August 12th Install centerstack August 25th NB Ion source installation Late June NB VPS system test July Start NB He system and begin NB #1 & #2 pumpdown Mid July Readiness review September Pump down December CD-4 December Rollover schedule at;

NSTX-U NSTXU Construction Progress – April 25th, Summary The project continues to make good technical progress and is on track for a December 2014 completion.