1 Jim Thomas - LBL Latest News on Cooling the SSD Jim Thomas Lawrence Berkeley National Laboratory 1/21/2011.

Slides:



Advertisements
Similar presentations
ADX 150 – Engine Repair ADX 170 – Climate Controls
Advertisements

HEAT PUMPS.
Performance measurement
Basic Refrigeration Cycle
Log Rules. Tree versus Log Volumes Trees contain sections that resemble different geometric solids. Trying to fit one rule to approximate the entire tree.
Emitter Selection.
Air Flow Bench Presented By: Saket Karajgikar & Nikhil Lakhkar Advisor: Prof. Dereje Agonafer.
L 25 Electricity and Magnetism [3] Electric circuits what conducts electricity what doesn’t conduct electricity Current, voltage and resistance –Ohm’s.
Electricity Chapter 34.
Chapter 1 VAPOR AND COMBINED POWER CYCLES
Trevor Thompson Senior Project II Vermont Technical College Spring 2011.
 A 'heat exchanger' may be defined as an equipment which transfers the energy from a hot fluid to a cold fluid. Here, the process of heating or cooling.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
1 Syafruddin Hasan. 2 Systems Concepts Automated systems that control flow rates or volume employ the following components: Automated systems that control.
Flow Sensors.
Basic Hydraulics Irrigation.
Objective of Lecture Describe the mathematical relationships between power and energy. Chapter 4.1 Relate power to voltage and current. Chapter 4.2 Explain.
© 2012 Pearson Education. Upper Saddle River, NJ, All rights reserved. Electronic Devices, 9th edition Thomas L. Floyd Electronic Devices Ninth.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
L 26 Electricity and Magnetism [3] Electric circuits Electric circuits what conducts electricity what conducts electricity what doesn’t conduct electricity.
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Chapter 22 Current Electricity.
HVAC523 Basic Subsystems.
Chemical Engineering 3P04
TEC 4607 Wind and Hydro Power Technologies Fall 2011.
TEC 4607 Wind and Hydro Power Technologies Fall 2011.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
SIZING PNEUMATIC SYSTEMS. Introduction Pneumatic systems are sized to meet output power requirements. The air distribution system is sized to carry the.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
Engineering Division 1 SSD Mechanics E Anderssen, H Matis, J Thomas LBNL S Bouvier, G Gouilloux Subatech.
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1 HBD Air Cooling System TK Hemmick for the HBD group 8/25/06.
SSD Ritter Review June 20, 2012 Conventional Systems: Cooling, Power Supplies, Cables, and all some of that stuff Jim Thomas Lawrence Berkeley National.
Power and Power Measurement ENGR 10 – Intro to Engineering College of Engineering San Jose State University (Ping Hsu and Ken Youssefi) 1 Introduction.
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Valves In Industry (Part 3)
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
One-Dimensional Steady-State Conduction
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Electricity & Magnetism Static, Currents, Circuits Magnetic Fields & Electro Magnets Motors & Generators.
1 Jim Thomas - LBL A New Proposal for Cooling the SSD Jim Thomas Lawrence Berkeley National Laboratory 10/27/2008.
Manual Density Business Today
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Building System efficiency not just a unit rating – Equipment Ratings EER and COP.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
Chapter 10: Flows, Pumps, and Piping Design
Basic Electronics for Computer Engineering 1 Chapter 3 Ohm’s Law.
Sensors and Detectors - 1
UNICO INVERTER DC. UNICO INVERTER DC UNICO INVERTER DC The first INVERTER technology based heat pump without external unit on the market The new product.
Electronic Devices Ninth Edition Floyd Chapter 17.
cooling for BGV modules
Basic principles of hydraulic symbols
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
By: JAGDEEP SANGWAN Refrigeration Basics 101.
L 26 Electricity and Magnetism [3]
Presentation transcript:

1 Jim Thomas - LBL Latest News on Cooling the SSD Jim Thomas Lawrence Berkeley National Laboratory 1/21/2011

2 Jim Thomas - LBL The SSD is air cooled – (tables show 2002 test results) Air In Air Out 1 cm Orifice P Side Electronics Cooling Off – vs 19 o CSIDE PSIDE N ADC Board42.8 o C46.5 o C Control Board FPGA34.8 o C36.5 o C Control Board Conn45.2 o C45.4 o C Cooling On – vs 19 o CSIDE PSIDE N ADC Board33.1 o C33.2 o C Control Board FPGA33.7 o C30.7 o C Control Board Conn27.6 o C24.5 o C The performance of the old electronics was excellent when the cooling system was in perfect condition.

3 Jim Thomas - LBL Air Path in an SSD Ladder Air at the midline of the detector travels through a tunnel, 75 mm x 4 mm (or ~ 3 cm 2 ) Length of this air tunnel is ~ 68 cm (not including ladder board sections on ends) An air flow of 1 liter/sec through the tunnel corresponds to an air speed of 3.3 m/sec Air enters the ladder board region through an ~ 1 cm orifice The entire ladder is wrapped in mylar to trap the air flow inside the triangular structure of the ladder The air flow is blocked by a ‘wall’ to force the air over the Si detectors

4 Jim Thomas - LBL Heat Load – old electronics on ladder #0 FEE POWERNumber of elements Predicted Power Measured Power Alice per Module 44 mW Costar 2 per Module 44 mW Detection Module16 per 1adder616 mW TOTAL FEE 9.8 W10 W Electronics Boards Number of elements Predicted PowerMeasured Power ADC Board2 per Ladder1.0 W per card C2D2 Board2 per Ladder2.0 W per card Total Electronic Boards/Ladder6 W Total Consumption: 16 Watts per Ladder

5 Jim Thomas - LBL Expectations based on design of old electronics 16 W per ladder, with 20 ladders (and 4 RDO boxes) Cross sectional area of each ladder (near Si wafers) is ~ 20 cm 2 Thus a flow rate of 1 liter / sec requires an air speed of 0.5 m/sec near the ladder boards, and 3.3 m/sec over the Si detectors 16 Joules into 1 liter of air suggests a  T of ~ 13 degrees  K –Heat capacity of lab air is J / cm 3 /  K 1 liter/sec of air was extensively tested on the bench, and was shown to work, without vibration or other difficulties

6 Jim Thomas - LBL Performance of Cooling System on Ladder #0 Measurements confirm that the majority of heat from the ladder is transferred to the cooling air stream. The system is efficient. Temperature (  C) Time (hours)  T  11  C

7 Jim Thomas - LBL The Previous Solution – a Vortec Transvector The previous solution was compact, convenient and clever The left panel (above) shows the vacuum distribution manifold that transfers air from the small diameter tubes to the Transvector. The right panel shows the Transvector airflow amplifier and its principles of operation. It worked. The Transvector drew air over the ladder by starting with air from the IFC (~1 bar). The system had a measured pressure drop of -12 mbar at the far end of the ladder and -43 mbar after 4.5 m of 8 mm (ID) plastic hose.

8 Jim Thomas - LBL Vacuum Curve for the Vortec System The operating point for the SSD is shown in red –Red diamond is for one Transvector = (5 ladders + 1 RDO) –The Transvector Vortec air flow amplifier is perfectly matched to the SSD operating conditions However, the curve is very flat and so there is not really any excess capacity in case of a kinked hose and no ability to increase the airflow if we continue to use 8 mm (ID) tubes. Vortec Model 903 performance curve (4 Vortec’s used to handle 20 ladders) Flow required by 5 ladders at the end of 8mm ID tubes

9 Jim Thomas - LBL New Electronics – New Expectations FEE POWERNumber of elements Predicted Power Measured Power Detection Module w/ parallel readout 16 per 1adder720 mW per module TOTAL FEE11.5 W New Electronics Boards Number of elements Predicted PowerMeasured Power Ladder Boards2 per Ladder6.7 W per card Total Electronic Boards/Ladder13.4 W Total Consumption: 25 Watts per Ladder 24 watts typical / 26 watts max 25 Joules into 1 liter of air suggests a  T of ~ 21 degrees  K at the old flow rate of 1 liter/sec (ambient air is 24  so total is 45 , which is in the danger zone). –Heat capacity of lab air is J / cm 3 /  K So to achieve the same  T as before, we need 1.6 liters/second of air flow with a velocity of 0.8 m/sec near the ladder boards and 5.4 m/sec over the Si detectors We need more air; but we must be careful that the ladders and/or mylar do not vibrate due to the increased flow rate

10 Jim Thomas - LBL More Air The wood products industry needs high volume vacuum sources to clear wood chips from around saws and lathes. Thus, there is a commercial line of vacuum sources that provide vacuum with more flow and pressure than we need. These vacuum sources can be purchased, off the shelf, and are designed for continuous operation. They run on 3 phase 240 VAC.

11 Jim Thomas - LBL Dust Collector Vacuum Sources A wide variety of options are available. Shown above are the vacuum curves for a 1.2 kW and a 2.6 kW system from a company in Southern California. Cost is about $4K for the smaller system. Note that the 1.2 kW cooling solution will not work on the new electronics if we continue to use the 8 mm (ID) tubes Vortec Model 903 Flow required by 20 ladders at the end of 8mm tubes (old electronics) 1.2 kW 2.6 kW The airflow can be increased ~2x by using a bigger pump and larger tubes Flow required by 20 ladders at the end of large tubes (new electronics) Flow required by 20 ladders at the end of 8 mm tubes (new electronics) ‘Large tubes’ means 4 long tubes with 2.5 cm (ID) each, then distributed locally to 20 ladders without additional pressure drop

12 Jim Thomas - LBL Losses are a function of distance and diameter The vacuum source will be mounted on the North Platform –Dirty power available here We will need approximately 30 meters (100 feet) of tubing to run between the source and the manifold on the face of the TPC. –Using the old manifold is reasonable and desirable The vacuum source is manufactured with 2 inch input ports –The pressure lost in a perfectly smooth 2 inch tube that is 100 feet long is approximately 4 inches of water. –However, the pressure lost in a 3 inch tube is only 0.5 inches of H 2 O A caveat on running a long plastic tube: it is a good idea to provide a conductor inside the tube to dissipate static charge The pressure lost in an 8 mm (ID) tube that is 4.5 m (15 foot) long is 17 inches of water (43 mbar) –In good agreement with measurements –Note that 1 cm (ID) tubes loose 13 mbar … very sensitive to ID –We are still limited by the 1 cm orifice on the ladders but we can tolerate this (and other small diameter hardware) by keeping the overall length of these sections very short. Bigger is better. We should use large tubes to conduct the vacuum.

13 Jim Thomas - LBL Various options to increase cooling for the SSD Eliminate the 8mm tubes –Use larger diameter tubes, this will increase the air flow over ladders … even with the old system it would have helped –4 x 3 cm is much better than 20 x 8 mm Decrease heat generated by the ladder boards –Air that passes over the ladder boards also passes over the Si detectors –Consider reducing voltage on regulators to decrease heat generated –Put regulators on outside of board so heat goes elsewhere (not into cooling air that passes over the Si)?

14 Jim Thomas - LBL More options Build 2 (or more) air paths inside the ladder. One to go over the Si detectors and one to go through the upper area of the ladder triangle in order to pass the ladder board air. –This would need an air guide to force cool air over the Si detectors and hot air through a hole in the wall that separates the sections. –This idea has the undesirable and risky feature that it requires modifying the ladders. –Also, not guaranteed to work. Overall, it would be difficult to control the air flow over the Si detectors. It would depend, in part, on how well the mylar is wrapped around each ladder to prevent leaks. What is status of the existing carbon fiber ‘cross’ –Are these already installed? Yes. Divides air passing close to the ladder boards. –How do they work? Most likely by providing laminar flow and/or increasing the air velocity near the boards

15 Jim Thomas - LBL Recommendations Use a more powerful vacuum source –This implies higher flow velocities inside the ladders. Use larger diameters pipes and tubes –1.25 inch (OD) plastic tube from TPC endcap to SSD (up to 15 ft) Minimum of 4 required, but 10 would allow easy distribution at the SSD 4 x 1.25” hoses or 10 x 1.00” are OK but 20 x 0.75” is not good (0.5” ID). –1 cm (ID) tube from ladder to ladder on SSD (< 4 inches per ladder) –3 inch diameter plastic pipe from the vacuum source to the TPC endcap (up to 100 ft in length) Reduce heat output from the ladder boards by changing to low power components on the boards, if possible. –Reduce heat going into the air stream over the Si detectors by putting ladder board components on the outside of the boards? Add a 2 nd air path - undesirable but possible: –Add a second air path through the upper part of the ladder to pass air from the ‘far’ ladder boards so that air does not pass over the Si detectors. –This would require cutting a hole in the wall that separates the ends of the ladders from the mid-section. Also not completely clear it would work. I believe this is too risky to be done on an assembled ladder.

16 Jim Thomas - LBL Summary Satisfactory cooling can be achieved by using a vacuum source to pull air from the IFC across the ladders of the SSD –Extensive measurements show that it works when everything is working perfectly In order to achieve excess capacity to compensate for non-ideal conditions, we should go to a new source of vacuum –230 V / 3 Phase Siemens turbine. The motors are brushless and rated for continuous operation, 25 year lifetime, 65 dBA. We should use larger diameter hoses at each stage of the design –Internal hoses should be made stiff so they won’t kink Consider redesigning the ladder boards to decrease the amount of generated heat

17 Jim Thomas - LBL Conversion units and scaling rules 1 inch of water = 2.49 mbar 1 psi = 68.9 mbar 1 CFM = 0.47 liters / second Pressure Drop as a function of diameter for constant flow rates of 1, 2, 4, 8 and 16 liters / second through a 4.5 meter long tube. Pressure drop is logarithmic vs radius, linear vs length and approximately quadratic vs flow rate.

18 Jim Thomas - LBL To Do Make list of recommendations for final design –Make a list of various pipe size combinations depending on how many allowed to run from TPC end cap to SSD. List the options. Assume 2 liters / second through each ladder, try for pressure drop of no more than 12 mBar in the ladder, 12 mBar in pipe from SSD to TPC end cap, and then 12 mBar from TPC endcap to vacuum source. 10 pipes is easy to distribute to SSD ladders with one T and two elbows, but fewer pipes would mean fewer penetrations through the cones. –Need calibrated air leak with an air filter on it. This is just a carefully managed hole in the pipe near the vacuum source with a circular canister type air filter. Decreases flow to ladders and as a consequence it decreases the pressure drop on the ladders. Monitor flow and pressure near the vacuum source. Pressure increase is the only way we will know if ladders have kinked off or air filter is plugged up. This measurement needs to be done upstream of air leak, but perhaps downstream too just for reference. Need to find high quality instrumentation for these diagnostics. –Can we measure flow, or pressure drop, on each ladder? –Design how to distribute air near SSD ladders. Tricky and needs to be large diameter parts. –What happens if some of the hoses are kinked? Do we collapse the other ladders? How do we prevent this from happening? Mylar will probably rip before other damage happens. Can we use this idea to create a safety release mechanism for each ladder? (tear away hole, inverse of a pressure release valve) Can we limit the flow with smaller diameter tubes over the long haul?