Department of Revenue BCP Development Path: Tips and Hints.

Slides:



Advertisements
Similar presentations
Chapter 5 Development and Evolution of User Interface
Advertisements

Developing an Outcomes Assessment Plan. Part One: Asking a Meaningful Question OA is not hard science as we are doing it. Data that you collect is only.
Consultation/Collaboration Model As used in Cecil County Public Schools Based on work by Dr. Mary Landrum.
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
Response to Intervention (RTI) Initial Implementation Top 10 Potential Perils and Pitfalls Mary Barringer, Ph.D. The SBS Group.
Statewide Expectations Presenter: Christine Spear Alabama Department of Education.
Planning a Ketso Workshop plus hints and tips. Basic structure of a Ketso workshop A trunk – the core focus, which is written on the centrepiece. What.
Team Decision Making and Self- Evaluation: Getting the Most Out of Your Database Anne K. Abramson & William C. Dawson Center for Social Services Research.
CS 501: Software Engineering
Fundamentals of Information Systems, Second Edition
Chapter 11 - Project Management ME101 Dr. Nhut Tan Ho 1.
Design, Implementation and Maintenance
Systems and Models in Curriculum Development. In this lesson, we will focus on the systems approach to curriculum development. By the end of this lesson,
Business Continuation Plan / Program Overview State CIO Council Meeting June 24, 2008.
  Rights holders   Who are they?   What are their claims?   Duty bearers   Who are they?   What are their duties?   Rights holders   Who.
Page 1 ISMT E-120 Desktop Applications for Managers Introduction to Microsoft Access.
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
Striving for Quality Using continuous improvement strategies to increase program quality, implementation fidelity and durability Steve Goodman Director.
THE PROTOTYPING MODEL The prototyping model begins with requirements gathering. Developer and customer meet and define the overall objectives for the software.
Information Systems Analysis and Design
Dorcas Nabukwasi H Uganda Bureau of Statistics 29 th April, 2013 Dakar.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
CS CS 5150 Software Engineering Lecture 3 Software Processes 2.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Course Summary IS-701.A – February 2010 Visual 6.1 Unit 6: Course Summary.
Developing Formative Assessment Plans Carmella Fair NC FALCON COORDINATOR, Learning Systems Division North Carolina Department of Public Instruction June.
CountrySTAT Regional Basic Administrator Training for ECO Member States Friday, October 23, 2015 EVENT Foundations of CountrySTAT E-learning.
DEFINITION Quality assurance is the process of verifying or determining whether the products or services meet or exceed the customers expectations. Quality.
1 The COG “Cookbook” Course Lesson 4 - Run Large Rollouts Planning Considerations for State and Regional DMIS Adoption.
Visual Basic Programming
Systems Analysis and Design in a Changing World, Fourth Edition
DRUCKER HOT TOPICS: RESUME REVIEW Presented by Drucker Office of Career Services.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
BEHAVIOR DRIVEN TEST DEVELOPMENT Specification by Example.
Making Improvements Improve Kaizen Facilitation. Objectives Identify characteristics of a Pilot Test / Run Describe 5 phases for a Pilot Test / Run 
Fidelity of Implementation A tool designed to provide descriptions of facets of a coherent whole school literacy initiative. A tool designed to provide.
Legal Scientific Laboratory Notebook
1 The Software Development Process ► Systems analysis ► Systems design ► Implementation ► Testing ► Documentation ► Evaluation ► Maintenance.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Presented by Environmental, Health and Safety Services Zack Adams, PE, CSP, CIH.
Corrective Action Programs. 2 HSEEP Homeland Security Exercise and Evaluation Program Provides a common exercise policy and program guidance that constitutes.
1 Kevin O’Connor Airworthiness Surveyor Civil and Military Design, Production & Continuing Airworthiness Root Cause Analysis Project…
AUDITING BUSINESS CONTINUITY PROGRAMS AND PLANS What to Look For Presented by: Tommye White, CBCP, DRP Chuck Walts, CBCP, CRP.
Problem Management for ITSD “Getting to the root of it” Thatcher Deane Feb 28, 2013.
Verification vs. Validation Verification: "Are we building the product right?" The software should conform to its specification.The software should conform.
COP 3503: Programming Fundamentals for CIS Majors 2 Basics.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
Nuts and Bolts: Functional Variations of Assessment and Evaluation Barbara Hornum, PhD Director, Drexel Center for Academic Excellence Associate Professor,
Programming Language Basics. What is a Programming Language? “A computer, human-created language used to write instructions for a computer.” “An artificial.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Continuous Improvement Projects
Conduction of a simulation considering cascading effects
What is a Service Desk?.
Quality Certification
DSQR Training Control Plans
Conduction of a simulation considering cascading effects
Comp 20 - Training & Instructional Design
Programming Language Basics
BUSINESS CONTINUITY PLAN
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Time Scheduling and Project management
BUSINESS CONTINUITY PROGRAM
Take home exercise.
BUSINESS CONTINUITY PLAN
Presentation transcript:

Department of Revenue BCP Development Path: Tips and Hints

Methodologies used in Creating Revenue’s BCP ISD Instructional Design Project Management Fundamentals 7 Habits by Steven Covey Revenue’s Combined approach

Quick Review A sequential project management planning approach 1.Define the objectives 2.Define the parameters 3.Develop the data collection “tool” 4.Collect the data 5.Compile the data 6.Verify the data

Quick Review Training course ware development 1.Begin with the “Test” 2.Design the BC plan in reverse direction 3.Write the BC plan in the forward direction

Quick Review Steven Covey’s 7 Habits for Highly Successful People: Which became “Bill’s short list” 1.Begin with the end in mind (2) 2.Put first things first (3) 3.Seek first to understand (5) 4.Collaborative problem solving, effective team work, shared ownership (6)

Establish a Format Criteria Fits into existing emergency and evacuation plans Critical business functions

Establish a Format Criteria: –Needs to be easily understood –Needs to “read like a script” –Check lists or instructions to be followed

Establish a Format See supplemental packet, page # Criteria: –Needs to be easily understood (pages 1-4) –Needs to “read like a script” (pages 5-6) –Check lists or instructions to be followed (pages 7-13) –Forms, special documents should be included (pages 14-17) –Definitions, assumptions, additional support information (pages 18-29)

Establish a Format Fits into existing emergency and evacuation plans –BCP isn’t always the “first and primary course of action” –Establish decision making body and incident command center (EOC)

BCP Timeline if implemented

Sequential Phases: An emergency or incident is declared

Sequential Phases: Once decision is made to implement BCP

Sequential Phases: BCP is now functional

Establish a Format See supplemental packet, page # Critical Business Functions (CBF’s) –CBF (phase III) implementation information (pages 1-7) –Description or why (page 8-9) –Who is involved and when (page 10) –What to do and when (page 11-12) –Where this will be done (page 13) –With what hardware/software/forms, or other means (page 14-15) In this case, the CBF is divided into a 1-3 day RTO and a 5-30 day RTO The sequence is repeated for each CBF

Testing vs Exercises Expectations: Testing From a Technical Review to Table Top Testing result should be to find the missing elements, mistakes, or errors. “Testing is designed to fail” Exercises From small scale to a full scale exercises, results should be positive and successful. “Exercises are designed to be successful” See page Testing_Elements_1.doc for model