TOP 10 AUSTRALIAN GOLD PRODUCER AUSTRALIA’S LARGEST TIN PRODUCER DEVELOPMENT & GROWTH PROJECTS STRONG FISCAL POSITION ASX: MLX OTCQX: MTXXY GR: FG5 AN.

Slides:



Advertisements
Similar presentations
Heemskirk Tin Project - Tasmania Tim Callaghan Geology and Resources September ASX: SRZ.
Advertisements

2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
Cleveland Mining Company Limited Management, Strategy & Projects August 2013 David Mendelawitz Managing Director ASX CodeCDG.
An Emerging Western Australian Gold Company What’s down the track forum presentation JON PRICE October 2013.
HERALD RESOURCES PROMISING FUTURE IN BASE METALS.
CFA® Level I - Financial Reporting and Analysis Financial Statement Analysis: Applications 1.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
The Rapu Rapu Project Lafayette Mining Limited. Overview People Project - Location - Description - Social and Political - Statistics Prospects - Schedule.
Results & Outlook BVN LISTED NYSE Compañía de Minas Buenaventura S.A.A. September, 2004.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
Arafura Resources Limited (ASX: ARU) Arafura Resources Limited 2 nd Annual Technology Metals Summit April 2013, Toronto.
Kentor Gold March 2012 Investor Presentation. Focus 2 1.Andash Gold Copper Project – Kyrgyzstan 2.Jervois Copper Gold Project – Australia 3.Murchison.
1 Dr Kris Butera CEO BSc (Hons), PhD, MAIG AML, CGSG Mr Suresh Tripathi Director BA MA MSc, MGM Grad Dipl (Mining), MAusIMM, MCIM, MSPE, MIAMG Corporate.
NEVADO RESOURCES CORPORATION (TSX-V:VDO) Strategic Metals in Northern Quebec August 2013.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
Recommendation: BUY Sandstorm Gold (SNDXF). Industry Overview 2 Gold mining is capital intensive Capital is very expensive for small exploration and production.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
Coal Exploration Projects Queensland Exploration Council Investor Forum - March 2014.
RESOURCES AND RESERVES JANUARY Investor Presentation | April 2013 | 2 A.1RESOURCE ESTIMATES Resources are inclusive of reserves. All resources and.
Important Information NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, INTO OR WITHIN THE UNITED STATES OR TO.
Investor Presentation | April 2013 | 1 BATHURST RESOURCES ASX SPOTLIGHT CONFERENCE May 2014.
This presentation has been prepared by Dongfang Modern Agriculture Holding Group Limited for professional investors.
FOX RESOURCES LIMITED Investor Presentation Bruno Seneque, Managing Director July 2009 ASX Code: FXR FOX RESOURCES LIMITED Pilbara Based Minerals Developer.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
Freeport McMoRan Copper & Gold Inc.: Financial Analysis
TSX-V: OCO Frankfurt: OR6
Corriente Resources Inc. Copper Growth Story Corriente Resources Inc. Copper Growth Story November 2006.
Africa Down Under in Singapore November 7, 2013 Allan Mulligan.
Apollo Minerals Limited Iron ore and base metals in Australia and Africa Apollo Minerals (ASX: AON) is a minerals exploration company focused on identification,
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Grattan Institute / MEI Energy Futures Event Dr Fiona Wild Vice President, Environment and Climate Change 5 March 2015 Newman, Iron Ore.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
Investor Presentation. 2 Cautionary Statement This presentation contains “forward-looking information” which may include, but is not limited to, statements.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
The Public/Private Two-Step EnerVest Management Partners/EVEP EV Energy Partners, L.P. John B. Walker, Chairman & CEO January 18, 2007.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
Ramping-up to Full Capacity Investor Presentation February 2009.
SAFE HARBOR Certain statements contained in this presentation regarding Rick's Cabaret future operating results or performance or business plans or prospects.
Bullabulling Gold Limited the merger of Auzex Resources Limited and GGG Resources plc March 2012.
Wowo Gap Nickel Laterite Project PNG Niugini Nickel Limited 100% Subsidiary of Resource Mining Corporation 1.
BROKER PRESENTATION December Disclaimer & Confidentiality Notice  The information contained in this Presentation or subsequently provided to the.
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear. Right to acquire.
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 2 Accounting and its Relationship to Shareholder Value and.
SYDNEY MINING CLUB CLUB 5 DECEMBER Outline of Presentation  the answer  the question  the explanation:  How we got here  Coal cash flow leverage.
SAFE HARBOR Certain statements contained in this presentation regarding Rick's Cabaret future operating results or performance or business plans or prospects.
St Barbara Mines Limited Tokyo Presentation Eduard Eshuys Managing Director & CEO 26 September 2004.
March Slide 1 Opportunities Exist The Region Is Vast, Under Explored And Undeveloped –Remote –Historical Lack Of Funds For Exploration Exploration.
MINERALS CORPORATION The Beginning of Chapter 2… June 2009.
Investor Presentation November Forward Looking Statements This presentation may contain forward-looking statements which are subject to a number.
Mine 2011 The game has changed Jason Burkitt Mine Africa 26 September
11 ASX: RXL Successful Base Metals Exploration Diggers & Dealers Presentation 5 August 2015.
2009 Coal Seam Gas Safety Forum Paul Zealand, Executive General Manager Upstream Oil & Gas Friday 14 August 2009.
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
Max Maczurad September 2011 Level 3 Hyatt Centre 123 Adelaide Terrace East Perth WA 6004 Tel: WINGELLINA NICKEL AND COBALT.
1 UK/Europe September 2003 The Tampakan Project. 2 INDOPHIL-THE COMPANY Market Listed ASX (IRN) Share price $ Aug 2003 Capitalization $47 M Capital.
JUMBUCK May 2016 GOLD PROJECT Gawler Craton - South Australia.
Page 2 Disclaimer This presentation has been prepared by Inca Minerals Limited (ICG). The information contained in this presentation is a professional.
NT LITHIUM ASX code: CXO PROJECTS. | LITHIUM potential | July 2016 | Core Exploration Ltd 2 DISCLAIMER.
COMPANY SNAPSHOT Listed Dec 2003 ASX: MML, MMLO Strategy
Developing a Canadian Gold Deposit
An overview of the CRIRSCO International Reporting Template
EV Battery Metals Nickel Copper Cobalt Lithium
AGM Presentation November 2018
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
Jervois Mining and M2 Cobalt Corp to Merge January 2019
Nordic Mining Investment Conference, April
PicIORUL ZIMBRULUI & MAGURA NEGRA
Blueberry.
Manaila Polymetallic Mine
Presentation transcript:

TOP 10 AUSTRALIAN GOLD PRODUCER AUSTRALIA’S LARGEST TIN PRODUCER DEVELOPMENT & GROWTH PROJECTS STRONG FISCAL POSITION ASX: MLX OTCQX: MTXXY GR: FG5 AN EMERGING DIVERSIFIED MINER

2 MarketASX Share Code: ASX OTCQX GR MLX MTXXY FG5 Share Price$0.26 Shares on Issue1,655M Market Capitalisation$430M Net Cash (and WC)$80M Enterprise Value~$350M Liquidity~ 3M per day CORPORATE STRUCTURE Major Shareholders APAC Resources24.1% Jinchuan Group10.7% Board & Management8.5% Blackrock Investments6.3% 6-month Mining & Metals index 6-month Aust Gold Index

AN EMERGING DIVERSIFIED MINER 3 GOLD 16.2 MOZ* TIN KT NICKEL 2 M TONNES COPPER 122 KT COBALT 165 KT SILVER 4.2 MOZ Production, revenue & growth diversified across multiple commodities. * Includes 3.5Moz at MKO Project (to be completed)

4 Gold Projects + Current Acquisition 1.Higginsville Gold Operations – in production (ex. Alacer Gold). 2.South Kalgoorlie Operations – in production (ex. Alacer Gold). 3.Central Murchison Gold Project – completed DFS. 4.Rover 1 Gold Project – pre-feasibility stage. 5.Meekatharra Gold Operations – currently completing the acquisition. 1.Exciting exploration prospects. 4 GOLD PRECIOUS METALS

Higginsville Gold Operations (HGO) - mainly underground operation (Trident & Chalice), 1.3Mtpa CIP Plant, 1.5Moz Resource, producing at circa 150,000ozpa. 5 Gold Produced (oz)42,443 oz Total Cost of Sales ($A/oz)$903 HIGGINSVILLE GOLD OPERATIONS PRECIOUS METALS Mar 2014 QtrDec 2013 Qtr Gold Produced45,141 oz42,442 oz Total Cost of SalesA$979/ozA$903/oz

South Kalgoorlie Operations (SKO) open pit & potential underground operation. 1.2Mtpa Plant – toll processing and owner processing. 5.7Moz resource base in multiple known ore sources. 6 SOUTH KALGOORLIE OPERATIONS PRECIOUS METALS Mar 2014 QtrDec 2013 Qtr Gold Produced3,208 oz8,844 oz Total Cost of SalesA$702/ozA$818/oz

Total Mineral Resource 2.52g/t 4.96Moz Initial Ore Reserve 2.36g/t 1.2Moz 7 DFS Results (2012): NPV 8 A$142M. Average Life of Mine cash operating costs of A$980 per ounce. Core focus on high-grade underground mines as major long term ore feed. A pre-production Capital Cost estimate (including process plant, contingency & EPCM) of A$117M – for New Plant Option. Acquisition of Meekatharra Gold Operations ($7.7M) dramatically changes the development scenario: new plant no longer needed, massive capital cost reduction. CENTRAL MURCHISON GOLD PROJECT PRECIOUS METALS DEVELOPMENT READY 100,000 OZ PA PROJECT

Total Mineral Resource 1.75g/t 3.55Moz Initial Ore Reserve 2.1g/t 752Koz 8 Agreement has been reached (subject to FIRB and creditor approval) to acquire MKO from the administrators of GMK Exploration Pty Ltd. $7.7M purchase price, $7.1M cash, $600K Reed Resources Shares. $2 per Resource Ounce with plant and infrastructure in place. Fully refurbished Bluebird CIP plant (2.5 Mtpa capacity). Fully refurbished 200 person camp. Extensive infrastructure, service vehicles, equipment and inventory. Changes the game when combined with the CMGP, a low capital cost for the in place infrastructure needed to jump start production. MEEKATHARRA GOLD OPERATIONS PRECIOUS METALS NEW ACQUISITION – SYNERGIES WITH THE CMGP

9 Total Mineral Resource 1.2Moz Gold Eq.: 5.6 g/t Au. Eq. (1.73 g/t Au, 2.07 g/t Ag, 1.21% Cu, 0.14% Bi, 0.05% Co) ROVER 1 – IOCG (TENNANT CREEK) PRECIOUS METALS Bonanza Gold intercepts 29.4g/t Au High Grade Copper 6.9% Cu, 0.9g/t Au Virgin Discovery at Feasibility Stage – Prolific Goldfield. Strong Polymetallic IOCG system (Cu-Au-Bi-Co-Fe). Approx oz gold equiv. per vertical metre so good underground mining metrics. Target Annual Production Rate – 60,000oz pa (Au equiv.). Target Total Costs – sub- A$800/oz after co-product credits.

10 350,000 oz per annum BUILDING A SIGNIFICANT GOLD PRODUCER PRECIOUS METALS + CMGP + ROVER 1 HGO SKO

11 One of the very few, if not the only western-world publicly listed tin producer AUSTRALIA’S ONLY SIGNIFICANT TIN PRODUCER BASE METALS - TIN

Renison Project (100%) Production from 1968: 1.4% Sn (225Kt recovered). Reserves 1.38% Sn (75.8Kt). Resources 1.65% Sn (190Kt). 2014: 7 - 7,500tpa A$17,000 est. C2 MLX Share (50%) EBITDA ~ $30Mpa at A$25,000/t Sn, ~ $50Mpa at A$30,000/t Sn. Sustaining capital ~$10M. Mt Bischoff Project (70km Nth of Renison) Pit & Underground potential. 0.54% (9Kt) Sn in Resource. 12 TASMANIAN TIN PROJECT (50% MLX) BASE METALS - TIN

13 TASMANIAN TIN PROJECT (MLX 50%) BASE METALS - TIN Currently in production – no lead time. Capital is sunk (> $300M head-start). Margins are exponential at higher Sn prices. Tin Production Growth with other projects.

Renison Mine Infrastructure A tailings re-treatment project applying new and proven technology – DFS completed. Total JORC Resource: M 0.45%Sn 0.21%Cu. Production of 5,000tpa Sn and 2,000tpa Cu for 10 years. Project EBITDA $60Mpa at A$25,000/t. – Cash Costs: $13,000 /tonne Sn (after Cu Credits); – Capital Cost ~$180M. Working with JV Partner to advance & alternatives. Adds to long term regional strategy and future. 14 Proposed New Fumer Plant RENISON EXPANSION PROJECT (RENTAILS) BASE METALS - TIN Existing Renison Mine Infrastructure

A major land holding across the NT/WA/SA borders highly prospective for oxide & sulphide nickel, copper and platenoids. A mining agreement covering 18,000km 2 for project development & infrastructure. The world class Wingellina Nickel Project – one of the largest undeveloped nickeliferous ‘pure oxide’ limonite accumulations in the world. Wingellina has ore characteristics perfectly suited to high pressure acid leaching, high iron grades (~47%) and low magnesium (1.6%). CENTRAL MUSGRAVE PROJECT BASE METALS – NICKEL, COBALT, IRON

Ore Reserves167.5M 1% Ni, 0.08% Co Annual Metal Production40,000 tonnes Ni, 3,000 tonnes Co Mine Life40+ Years Metal Price AssumptionsNi US$20,000/t, Co US$45,000/t Exchange Rate AssumptionAUD 0.85 Production CostUS$3.34/lb (after Co credits) Est. Average Annual EBITDAUS$483 Million NPV (8%) BTA$3.4 Billion Capital Cost EstimateA$2.5 Billion 16 MOU signed with Samsung C&T, Metals X 30% free carried to production. Currently completing long lead time approvals and studies prior to final engineering and financing. WINGELLINA NICKEL PROJECT DFS BASE METALS – NICKEL, COBALT, IRON

17 MARKET PEER COMPARISONS Company Share price A$/sh Market cap A$M EV A$MResource MozReserve Moz EV/EBITDA FY14/CY13 EV/Rsc A$/oz Regis Resources Ltd2.281,1391, x111 Evolution Ltd x120 Northern Star Ltd x274 Ramelius Resources Ltd x8 Resolute Ltd x52 Saracen Ltd x67 St Barbara Ltd x24 Silver Lakes Resources Ltd x49 Troy Resources Ltd x312 Metals X Limited Total x25 Metals X Limited Gold Only x16 Simple average4.4x113 Weighted average4.3x63.66 Source: Bell Potter Research Note, Regis Resources Ltd, 7 March 2014.

Diversified – exposure shared across precious and base metals. Precious Metals - Gold: 2 Operations Producing Gold. 2 Growth Assets – Ready for Development. Base Metals: Tin Production and Growth (Unique). Development Ready Wingellina Nickel-Cobalt-Iron Project (Huge). Strong Financial Position: Cash $80M+ (No Debt). Strong Cash Flow (CY14 +$300M Rev, +$100M EBITDA). Market Capitalisation ~ A$430M, EV A$350M. Expansive portfolio of production and growth assets with significant upside. CASH + CASH FLOW + DIVERSIFIED + GROWTH + HUGE UPSIDE 18 METALS X LIMITED - SCORECARD

General Disclaimer This presentation has been prepared by Metals X Limited (“Metals X” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This presentation contains forecasts and forward looking statements. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments may differ materially from those expressed or implied. Metals X has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by applicable laws, Metals X makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information, statement or opinion contained in this presentation. This overview of Metals X does not purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any investment decision. JORC Compliance Statement Competent Persons Statements – Rover 1 The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Jake Russell B.Sc. (Hons), who is a Member of the Australian Institute of Geoscientists. Mr Russell is a full-time employee of the company. Mr Russell has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Russell consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Gold Equivalence The Gold Equivalence calculation represents total metal value for each metal assuming 100% recovery, summed and expressed in equivalent gold grade or ounces. The prices used in the calculation being US$1100/oz Au, US$7000/t Cu, US$21.0/lb Co, US$7.5/lb Bi and US$15.0/oz Ag and approximate metal prices as at 18 Feb The Gold Equivalent formula is: AuEq = Au *Ag *Bi *Co *Cu. Exploration and Production Target Statements The information in this report that relates to exploration targets refers to targets that are conceptual in nature, where there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. Production targets and mine designs are currently conceptual in nature and relate to the Scoping Study completed in October Advanced feasibility studies are currently underway to advance the economic evaluations at Rover 1. Competent Persons Statements – CMGP The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Jake Russell B.Sc. (Hons), who is a Member of the Australian Institute of Geoscientists. Mr Russell is a full-time employee of the company. Mr Russell has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Russell consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this report that relates to Ore Reserves is based on information compiled under the direction of Mr. Paul Hucker B. Eng (Hons), who is a Member of the AusIMM. Mr Hucker is a full-time employee of the company. Mr Hucker has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Hucker consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this Resource report that relates to Exploration Results is compiled by Metals X technical employees under the supervision of Mr. Peter Cook BSc (Appl. Geol) MSc (Min. Econ.) M.AusIMM. Mr Cook is an advisor to, and the Non-Executive Chairman of Metals X. Mr Cook has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Cook consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Competent Persons Statement –Tin, Nickel & Gold Division The information in this Resource report that relates to Exploration Results is compiled by Metals X technical employees under the supervision of Mr. Peter Cook BSc (Appl. Geol) MSc (Min. Econ.) M.AusIMM. Mr Cook is an advisor to, and the Non-Executive Chairman of Metals X. Mr Cook has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which they are undertaking to qualify as a Competent Person as defined in the 2004 & 2012 Editions of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Cook consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. The information in this Mining Reserve estimate report is compiled by Metals X technical employees under the supervision of Mr Michael Poepjes BEng (Mining Engineering), MSc (Min. Econ) M.AusIMM. Mr Poepjes is a full-time employee of the company. Mr Poepjes has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Poepjes consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. 19 DISCLAIMER

ASX: MLX OTCQX: MTXXY GR: FG5 AN EMERGING DIVERSIFIED MINER Thank you!!