NE Regional statistics and discussion guide report Summary

Slides:



Advertisements
Similar presentations
The White Paper – a policy paper to contribute to the integration process of the WBC in the ERA Dr. Erika Rost, Dr. Andreas Kahle Federal Ministry of Education.
Advertisements

U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
ROADS PAVEMENT FORUM ROODE VALLEI COUNTRY LODGE PRETORIA 13 November 2001 TECHNOLOGY TRANSFER CENTRES Kenny Kistan.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
SHRP2 Project R04 Bridge Designs for ABC
Highways for LIFE Steps in the Marketing Plan Development Process 1.Create of a very basic plan as a “straw man” 2.Send “straw man” plan to team as homework.
SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.
SUMMARY REPORT OF THE NCHRP 20-68A – US Domestic Scan Program Scan 11-02: Best Practices Regarding Performance of Accelerated Bridge Construction (ABC)
Connection Details for Prefabricated Bridge Elements and Systems
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
 Project Delivery  Design Considerations  Lessons Learned.
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
3/10/2010 March 2010 ABC Pooled Fund Study TAC Teleconference 1.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
SHRP2 Implementation | July 22, 2014 Implementation Update AASHTO RAC Meeting, July 22, 2014 Debra Elston, Director, Office of Corporate Research, Technology,
SHRP2 Implementation Update to the Standing Committee on Highways Pam Hutton, AASHTO May 29,
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
THANK YOU  John Horsley and the entire leadership of AASHTO  AGC of America and ARTBA (American Road and Transportation Builders Association)  NACE,
Certification/Qualification Program. Certification Program What is it? Who is involved? What should be considered? Where can a Certification Program work.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Mike Schagrin Program Manager, Connected Vehicle Safety & Automation ITS Joint Program Office Research and Innovative Technology Administration September.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
FHWA Update WASHTO Construction and Materials Conference Portland, Oregon April 8, 2008.
NYMTC Strategic Data Management Kuo-Ann Chiao Technical Group Director.
M aintenance Efficiency & Cost Effectiveness Initiative Robert M. Peda, P.E. Director, Bureau of Maintenance & Operations, PennDOT MQA Peer Exchange October.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Overview of the Work Zone Safety and Mobility Rule Module 1.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: State-of-the-Art Full-Depth Precast Concrete Bridge Decks Sponsored by Center.
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Community Board Orientation 6- Community Board Orientation 6-1.
LTAP/TTAP Joint Safety Program Overview Joint Safety Program Vision Further the national program vision to improve the safety of the local and rural surface.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Field-Cast UHPC Connections in Full-Depth Precast Bridge Decks Sponsored by.
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE XYZ STATE 1.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
1 Developing Fire Department Safety Programs Fire Officer 3 Program.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
Robert Pollack October 26, FHWA Safety Data Initiatives.
Project Cost Estimating Improvement Actions, Results and Trends CTC Briefing March 16, 2006.
Roadway Data Extraction Technical Assistance Program (RDETAP) Robert Pollack October 25,
Systems Accreditation Berkeley County School District Accreditation Team Chair Training October 20, 2014 Dr. Rodney Thompson Superintendent.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Ergonomics Risk Management: Strategies and Interventions at Workplace Level Back to Basics Conference June 13 th 2014 Frank Power Inspector (Projects Manager)
Washington State Work Zone Rule  Work Zone Rule Implementation  New Work Zone Policy Cathy Nicholas, FHWA - WA Division Office Frank Newboles, WSDOT.
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Slide California Bridge Construction Forum Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction.
Peer Resource Network Occupational Health & Safety Program Requirements Introduce facilitator Updated: 2017.
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
Sample Fit-Gap Kick-off
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
Sandra Larson, P.E. Iowa Department of Transportation
Continuous Improvement through Accreditation AdvancED ESA Accreditation MAISA Conference January 27, 2016.
Making Mutual Reliance and Information Sharing Happen
FHWA TSMO / SHRP2 Research
Employee engagement Delivery guide
Presentation transcript:

NE Regional statistics and discussion guide report Summary Romeo R. Garcia Minnesota Division Bridge Engineer 16 Years New Jersey Division Bridge Engineer 10 Years Various other FHWA Assignments Total 37 Years BSCE University of Minnesota Ben Beerman Romeo Garcia Kenny Tong Abe Ramirez FHWA PBES Implementation Team

7 Habits of highly successful people Habit # 3 Start with the end in mind! Steven Covey 10/24/32 – 7/16/12 In reviewing the results of the discussion guide we decided to start the review from the end of the survey and gradually work our way back up! Also, this P2P Exchange started with the review of active PBES type projects! How’s that with starting with the end in mind?

Questions

Overview Regional Characteristics Policy Safety Design/Materials related slides Research and Outreach Success Stories Recommendations for FHWA/Research Round Table Discussion Questions Next Steps

Regional Characteristics Bridge functions mostly centralized 1 to 11 Districts/Regions per State Variable Inventories (6% - 25% SD) 61% State owned Bridges (48% Nat’l) Opportunity for Organizational Change

Bridge Office Organization Question 7: With the exception of two States there is no dedicated ABC team. Contrast this with MassDOT and Vermont. How does Utah differ? Do states think this might change in the future? What might be the pro’s and con’s of a distinct ABC team? What about construction? Do states have construction personnel that specialize in structures?

Policy Closing the Gap Between Innovation & Implementation: Over half of States have policies in place. One State has a decision making tool. Remaining States have various activities and initiatives in place leading towards the ultimate establishment of policy and decision making processes. Some Challenges to overcome Some possible steps to pursue Gold Star – states interested in state polices – developing them, implementing them 7

Challenges to Overcome Other Challenges: Contractor “Buy-In” Not Implemented @ Districts Yet Question 17 PROGAMMATTIC BARRIERS Other Barriers – Seismic concerns and concern over damage during move Discussion – does cost come down after initial implementation? Is more education needed on techniques that are more cost effective? What standards are needed? How do we get local contractors the training equipment and experience necessary? How to address the quality/durability concerns?

Steps towards Normal Practice Question 19 BARRIERS TO USE ON PROJECTS ROUTINELY This is data only for the states where PBES is not part of their normal business practice Discussion topics: Who has cost data? How to get cost data into the hands of people who need it? What can be done about training, sample calcs, details, etc.? Are folks aware of OR AHP Decision Process for ABC? How to get experience from states who have formal policy and processes to states that are seeking it?

PBES Policy or Initiative Underway Question 16

ABC/PBES as Normal Practice Question 18

ABC/PBES Guidance In Manual Question 20

Project Selection Procedure Question 21

Standard Bridge Plans Question 28

Benefits attributed to ABC/PBES Safety Benefits attributed to ABC/PBES

Enhance Worker Safety Nationally: 44% of Bridge Construction Worker Injuries Involve a Vehicle Travelling Through a Work Zone (OSHA Type 1622, 1984-2010) 2/3 of the 44% are Fatal 28% of Worker Injuries Involve Construction Vehicles No Work Zone = No Accident Almost ½ of construction worker injuries (2/3 of which are fatal) could be prevented by performing work out of traffic instead of in a work zone. NATIONAL STATISTICS

Design/Materials Related Slides

Some PBES Products Used In NE MSE Walls, T-Walls NEXT Beams New England Bulb Tee (NEBT) CONSPAN & BEBO Inverset Systems Deck Panels Precast Columns and Caps Others Question 38

Allow Alternative Technical Concepts Question 46

Materials

Prefab Certification Question 52

Use of Full-Depth Deck Panels Questions 32 & 33

SIP Deck Forms Questions 48 & 49

SIP Deck Forms Types used in the region Galvanized Steel Steel Pans Corrugated Metal Concrete Panels Any other? Question 50

Research and Outreach Interest in peer review of fabrication processes and procedures Interest in participating in scanning tours Public Relations – generally proactive There is a general interest in these areas.

Region-Wide Review Interests SLIDE 42

Scan Tours Questions 55 & 56

Media Relations Question 57

Success Stories Many examples in NE Region Many project experiences described

Recommendations for FHWA/Research

Recommendations for FHWA Allow flexibility in use of proprietary products Allow use of UHPC in connections Facilitate stakeholder meeting/ABC implementation issues Provide information on costs, details, & examples from other States Develop new technologies

Recommendations for FHWA Cont. Continue Showcases & Peer Exchanges Training Support for Pilot/Demonstration Projects Cost-Delta Assistance (100% participation) Provide status report on condition of completed projects

Needed Research Performance of ABC/PBES projects Determination of deck panel size/shipping limits Synthesis on Lessons learned from ABC/PBES projects Development of refined/objective decision making matrix Emulative and non-emulative connections High early strength concrete & joint performance issues Longitudinal joint performance & connection detail c.

Needed Research Cont. Overlay materials on longitudinal joints & performance of overlay material Durable connections details- design specification for ABC/PBES projects Match up technology with appropriate State needs. Use of alternative construction materials/ bridges on low volume local roads Thin Bonded Polymer Overlay Service Life Connection Strength Decision Making Process/Policy Customer satisfaction surveys c.

Round Table Questions ABC/PBES project experience in NE Increase project cost associated with ABC Criteria other States use to select ABC projects Joint Details Ways to reduce cost of ABC/PBES construction UHPC performance based spec for rapid set conc. Contract language to enforce deadlines Lane rental specs QC/QA for prefab elements

Round Table Questions Cont. How to handle contractor self-performing work ABC/PBES difficulties tied to IBRD or HFL projects (FHWA reporting requirements etc) Performance of existing bridges with longitudinal joints including overlay materials. What to avoid! During superstructure replacement using steel girders/beams share experience on anchor bolt. Experience on any differential movement of superstructure during transportation of using SPMT with remote control.

Round Table Discussions Policy Adoption Durability Resources Cost

Next Steps Continue dialogue on items of mutual interest Establish/Maintain - Partnerships/Networks Organize and pursue a scanning tour Develop action plans Continue moving forward! Take active part of the round table discussion. Stay in touch with partnerships and networks. Minnesota, Wisconsin, and Iowa are getting together in September to draft a policy on ABC/PBES.

Vision Expect the unexpected manifestation of the expected. Expectation foreshadows experience. Expect new things. Prepare for change, and it will come----and maybe suddenly. Mettabel Okulaja, MD

Questions