1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.

Slides:



Advertisements
Similar presentations
June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
Advertisements

System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
EMS User’s Group 2008 Presented By Curtis Crews of ERCOT and Margaret Goodrich of Project Consultants, LLC Presented to EMS User’s Group Atlanta, GA September.
Jay Britton
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 Single-Entry Model Milestone Status Report May 1, 2008.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Texas Nodal Timeline Options, TPTF Jul 11, Timeline Options Trip Doggett TPTF
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
Lead from the front Texas Nodal 1 Texas Nodal CRR Requirements Overview of Requirements for TPTF Shawna Jirasek and Beth Garza September.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
March 11, 2008 Texas Nodal Market Redesign Program Commercial Operations Subcommittee.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
CRR Model Building Process Bradley Bell CRR Engineer.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Network Model Management System (NMMS)
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
2009 Project Prioritization Troy Anderson ERCOT Program Management Office February 20, 2008.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
Conclusions Nodel Modeling Forum. Proposal 1 ERCOT builds the NMMS tool to be able to include the planning data; but not propose changes to the planning.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Stability Limit Management Chad Thompson Manager, Operations Support Planning Working Group Meeting ERCOT Public January 20, 2016.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Integration Update October 24, 2006 Daryl Shing, Enterprise.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
March 4, 2008 TPTF Texas Nodal Market Implementation EMS CIM Importer update David Hackett, EMS PM.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
Texas Nodal Electrical Buses and Outage Scheduling.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Nodal Planning Go Live Austin, TX February 3, 2011
NMMS Nodal Network Mgmt and Monitoring System Update
Data Exchange.
The Network Model Management System
Time-Based Management of Large Scale Network Models
Presentation transcript:

1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT

2Texas Nodal Current Information As detailed in the Nodal Protocols, the cases for the CRR Annual Auction will be constructed up to 18 months before the period in which the CRR is valid Modeling network topology information 18 months in advance has been historically limited to information provided by the TSP planning departments TSP Planning departments traditionally have used bus-branch models to conduct their studies As a comparison, TSP Operations departments traditionally have used a node (breaker) model to monitor the electric grid You might be asking: Why is this important?

3Texas Nodal Example: Modeling Differences of the same station Operations Model Representation “breaker” Model Planning Model Representation “bus-branch Model”

4Texas Nodal NMMS conversion to PSS/E: CIM to PSS/E Transformation

5Texas Nodal Addressing Issues Issue 1: –IEC CIM 11 CPSM standard which is what NMMS is using as its baseline is used to model the Operations Breaker Model. No account for Planning Models –Planned changes to the bus-branch model more than likely do NOT exist in the operations format 18 months out. –Due to construction uncertainty (details of breaker configuration), many TSP Operations dept can not convert the bus-branch planning model to a Operations Breaker Model until <6months from installation date. Issue 2: –There currently is no CIM standards for the a bus-branch Planning Model –Planning CIM working group starting in 4Q2006 and planned to complete by end of 2007 Issue 3: – CRR Auction Engine tool uses a planning (bus-branch) Model

6Texas Nodal Visual Timeline Annual CasesMonthly Cases

7Texas Nodal Current Interpretation CRR Requirements The CRR Network Model input into the CRR System shall be a CIM compliant file converted to PSS/E RAWD format file following the requirements noted below. The same CIM compliant file will be posted as the CRR Network Model. Although not required, the expectation is to also post PSS/E RAWD format file. –CRR requirement can be satisfied for CRR Monthly auctions but can not be satisfied with the annual auctions. –Need to determine TPTF position on annual CRR auction topology posting Optional Plan ERCOT will post only PSSE formatted RAWD files for the CRR annual Auction until Planning CIM becomes available. After which, when planning CIM becomes available, both formats will be posted for the CRR annual Auction.

8Texas Nodal CRR Model Discussion Questions?

9Texas Nodal Network Model Format (PSS/E vs. CIM) Why PSS/E? –Format is de-facto industry standard –Bus/branch model –CRR Requires a bus/branch model –CRR COTS imports PSS/E natively (out-of-box) –Network Model size using PSS/E format is significantly smaller than the same model in CIM XML CIM Characteristics –Well accepted Industry standard –CIM model extensions may be required to cover CRR needs –From the network model perspective, CIM describes bus/breaker model that is much more detailed –NMMS is CIM compliant – can export in both CIM and PSS/E –CIM -> PSS/E possible (out-of-box feature of the NMMS tool); PSS/E -> CIM not possible –For CRR CIM bus/breaker must be translated to bus/branch by either: Sender/Provider (NMMS – Low Cost, Low Risk, No Schedule Impact) Receiver/Consumer (CRR - High Cost, High Risk, High Schedule Impact) Integration Layer (High Cost, High Risk, High Schedule Impact) The proposed approach –NMMS publishes CIM and PSS/E –CRR uses PSS/E –Minimize cost and risk Leverages the best of both Worlds –CIM compliant at the network model source (NMMS) –Leverages PSS/E as de-facto standard native to the CRR off- the-shelve product –Consistent with Nodal Program approach to support applications’ native interfaces and have integration layer or data provider being responsible for data transformations.