1 Joanna Simpson, University of Cambridge David Green, University of Cambridge Mate Lorincz, University of Keele Estates & Operations Approaches to influencing.

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

Financing Renewable Energy: an introduction to FITs and RHI Andrej Miller Renewable Financial Incentives Office of Renewable Energy Deployment
THE GREEN DEAL Alan Lupton. THE STORY SO FAR 1996 Introduction of the Home Energy Conservation Act (HECA) – local authorities to report annually on the.
Sustainable Design within BSF: A Case Study of the City of Leicester College Liam Murray (Hulley & Kirkwood)
Promoting Energy Efficiency in Buildings: the CEB’s Experience León Herrera Director of European Affairs Brussels - 19 June 2009.
Dr Zoe Robinson, Keele University, Greening Business: An online teaching resource.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Developing the sustainability organisation at Cambridge Catrin Darsley Environmental Coordinator, University of Cambridge.
Summary of Heat Loss Calculations Assessing overall heating requirements for building (E) Component U-ValueAreaHeat Loss Rate (W o C -1 ) Walls U walls.
Page 1 AVC Group Delivering Heating Solutions for Social Housing AVC ALTERNATIVE ENERGY Saving energy Cutting Utility Costs Reducing Carbon Emissions.
Developing an Energy Management Plan for the Whole School United Learning – 18 th February 2015 Malcolm Hanna, Technical Director Improving the use of.
How ICT can Create a Leaner and More Sustainable Estate
Taking Action on Climate Change John Sugden Head of UK Facilities Management Thinking About Tomorrow Today.
Reducing Energy Consumption The DWP approach Case Study 3.
Waste Management & Recycling Estates Management Mark Lindsay, Senior Contracts Surveyor Andy Baillie, Cleaning Services Manager Alan Gray, Procurement.
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
Even Better than the Best Building Ever? The ZICER and Elizabeth Fry Low Energy Buildings Keith Tovey M.A., PhD, CEng, MICE Energy Science Director: Low.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Low Carbon Action Group results. The nature of our business means a large amount of energy needs to be used, but we are looking to compensate that with.
Staff Induction-Environmental Awareness
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Renewable Energies and Climate Protection Policy in Freiburg Dr. Dieter Wörner Director, Environmental Protection Agency City of Freiburg - Germany.
1 Kevin Cope Imperial College London Head of Building Operations Carbon Management Plans - achievements, maintenance and the future.
Creating Energy-Efficient Data Centers
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Energy Issues & Initiatives Presented by Helen Westwood Tuesday 2 June 2009.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
2013 Head of Estates and Sustainable Development Andrew Smith.
Sussex Energy Group SPRU - Science and Technology Policy Research IFEG Energy, behaviour and micro-generation Mari Martiskainen Sussex Energy Group Presentation.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
Information Technology Division Executive Office for Administration and Finance Springfield Data Center Program Energy Strategy Meeting 9/29/2009.
Green Building Demonstration Project Adam Saling City of San Diego.
100 Homes Project Baseline CO2 emissions – what’s our starting point? Updated Jan 2011.
National Trust energy approaches. –
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
How to unlock the secrets of decarbonised buildings - what's holding you up? Annual EAUC Conference, March 2010.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Schools and the Carbon Reduction Commitment Energy Efficiency Scheme Karen Walter Carbon Reduction Officer, HCC School Clerks Network.
Prof. S. Neti, Director Drs. A. Oztekin, C. Romero, and H. Bilirgren.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Borders Energy Agency. BACKGROUND Scrutiny Review of Renewables Support the establishment of a Borders Renewable Energy Agency Project guided by the Scottish.
UK experience of and plans for reducing emissions of greenhouse gases
Benefits Of A Green Home Main Menu. Navigation/Menu Quit.
1 Business Resource Efficiency Improvement Grant (BREIG) Steve Goodare YFM Business Development Regional Manager Manufacturing Advisory Service, Y&H BREIG.
Energy Conservation in Computer Intensive Learning Environments.
VIRTUAL NET METERING AND LOCAL NETWORK CHARGES IN AUSTRALIA: AN UPDATE Smart Future Cities Conference 2015, Newcastle, NSW, October 1 st 2015.
Michael O’Doherty Assistant Director of Housing, MCC Retrofitting for the future..
Optimaze.net A Next Generation Computer Aided Facilities Management (CAFM) Solution for Corporate Tenants.
Our Key Objectives A free service to Members Help members reduce their running costs through buying together Help members reduce their Energy Consumption.
EAUC November LYIT Letterkenny Campus – 97 acres Killybegs Campus – 5 acres 3,200 Full Time Students 30,000 sq m Buildings.
Photovoltaic Systems: Market Drivers, economics and opportunities Lyndon Frearson General Manager CAT Projects.
Chelmsford Cathedral case study Cathedrals and Climate Change 2 nd November 2009 Daniel Kenning CEng CEnv Principal Environmental Consultant Harrison Group.
Sustainability Its our choice Presenters of this discussion topic Jon Howard Director of Estates (Sponsor) Shane O Donnell Maintenance Officer (Lead)
Global construction consultants SPENDING WISELY Laurence Brett Partner Davis Langdon LLP.
PECO Smart Ideas for Your Business Greater Philadelphia Association of Energy Engineers Mike O’Leary, PECO April 20, 2016.
ISA Toronto Enbridge Gas Distribution Program Incentives & Case Studies January, 2011.
Greening the Supply Chain at Imperial College London using ICT John Whitlow – Head of Purchasing.
Driving down the Cost of Motoring Robert Wiseman Energy Saving Trust Fenland Supply Chain Network: Transport and Responsible Purchasing 15 th October 2010.
Low Carbon Chilterns Cooperative Ltd Samantha Free 2 December 2015 COMMUNITY BULDINGS & ENERGY EFFICIENCY.
ENV-5022B/ENVK5023B Low Carbon Energy
Andrew Bryers MSc MEI: Chartered Energy Manager
EU’s CO2 Emissions Trading Scheme – Benchmarks for Free Allocation from 2013 Onwards 9 September 2010 Hans Bergman DG Climate Action European Commission.
bre Innovation Park Visitor Centre:
Sustainability Its our choice
ENV-5022B/ENVK5023B Low Carbon Energy
Karen Corkery Sustainability Officer, HCC
Presentation transcript:

1 Joanna Simpson, University of Cambridge David Green, University of Cambridge Mate Lorincz, University of Keele Estates & Operations Approaches to influencing energy saving without capital investments

2 Agenda Introduction Electricity Incentivisation Scheme (EIS) at the University of Cambridge How has the EIS influenced behaviour? A case study from the Department of Engineering at the University of Cambridge The relationship between personal values and energy efficiency. A case study from the University of Keele Q&A and discussion

3 Energy and Carbon Reduction Project Supports implementation of the Carbon Management Plan Five pilot departments Learning to be rolled out across the estate £2M per annum budget Energy dashboard Engagement activities Gurdon Institute Library Engineering Chemistry Plant Sciences

4 What is the Electricity Incentivisation Scheme? Financial incentives to use electricity more efficiently Annual allowances at departmental level Financial reward if use less than allowance Financial penalty if exceed allowance Implemented 1 August 2008

5 How does it work? Value of any saving or cost made using the University’s average electricity price Quarterly reports sent to departments Financial transactions made once a year by the Finance Division Cost neutral to the central chest Scheme originally approved by Resource Management Committee (RMC) Annual targets approved by and results reported to RMC

6 How does it work? Annual allowances (August – July) are based on historic data 2008/09 allowances were equal to 2007/06 plus 3% 2009/10 and 2011/12 allowances were based on the average of the target and the actual consumption for the previous year, plus an uplift of 2% Post 2011/12 allowances now capped at 2009/10 usage. Newly occupied buildings - “settling down” period (3 years) before setting the baseline target

7 Measures of success Prior to 2008, electricity consumption was increasing at around 4% per annum In 2010/11 electricity usage was 4.4% below target, saving: £0.51 million 4,950 MWh 2,678 tonnes CO 2 Raised profile of electricity consumption and carbon is now in annual University planning round

8 University wide results

9

10 Departmental examples William Gates Building Electricity consumption – 12 month moving average Reduced consumption by 26% since the start of EIS

11 Departmental examples 2011/12 Two departments received approximately £27,000 One department was charged almost £70,000

12 Challenges and lessons learnt Agreeing annual allowances Dealing with new academic activity Senior level support Keep it simple – reduced administration burden by using existing electricity metering infrastructure and floor space allocation data Communication – at all levels

13 Case Study – Department of Engineering Background Accounts for around 10% of university. Activities based in 7 buildings. Around 600 members of staff – academic, research, administrative and technical roles. Four year MEng course – around 1,200 students. Postgraduate students numbers: 2011 (792) 2012 (830)

14 Engineering Year 1 ( ) Pre EIS levels indicated year on year increase, typically around 8%. Energy review arrangements - ad hoc and typically linked to plant replacement. Engineering’s bill for was £35k. High consumption buildings. Energy intensive activities.

15 Review of Energy Usage Historical and current Building maintenance staff. Consultant based surveys. Summer student appointments included: IES-VE modelling of buildings PV Survey Façade Optimisation

16 Committees & Communications Energy and Environmental Committees established. Regular agenda item at existing committees – Council, Staff, Safety etc. Promote energy performance and sustainability at all levels. Embrace interest shown from students and staff. Student and staff involvement: MEng projects, research, undergraduate teaching modules established.

17 Teaching and Research Teaching 4th year MEng projects include: fabric optimisation, PV modelling. 3rd year renewable module – PV inverter technologies, string and micro. MPhil Energy Technology – PV and Dashboard. Many 4th Year MEng projects are environmental based and popular. Research Doubly fed generator. PV micro inverter technology. Cleaning of emissions from combustion processes. Fuel efficiency in IC engines and compressors. Sustainable Development Group. Student Organisations & University Projects GreenBRIDGE Living Laboratory for Sustainability.

18 Visibility of Building Performance Introduction of Energy Dashboard. Visibility of actual building performance. Digital signage. Encourage individuals to ‘own’ and take responsibility. ‘Buy-in’ now apparent in some equipment purchases. Data being used in undergraduate teaching exercises.

19 DEC / EPC Improvements Completed Schemes include: Centralisation of compressed air plant (38t C02 pa). Update of heating boilers (115t C02 pa). Centralisation and efficiency of Data Centres (£75k, 200t C02 pa). Planned Schemes include: Air conditioning and AHU control. Heating distribution. Centralisation of chilled water plant.

20 Energy and Carbon Reduction Project (ECRP) Lead pilot department. Current projects include: Energy Roof Upgrade of chilled water supply Measurement of plug loads and dashboard Control of air conditioners Strong links with research activities e.g. building physics, power electronics. Sharing of information with Estate Management, other departments and colleges. Presentation at higher education and industry based seminars. Departmental engagement key.

21 Energy Roof Analysis IES-VE modelling of building fabric performance. Review and optimisation of PV panels and inverter types. Direct DC power usage. Installation Insulation savings 46%. 61,188 kWh maximum yield from PV. Data will be used to support undergraduate teaching.

22 Façade Optimisation PhD Student - Glass & Façade Group Analysis Current performance and assessment of strategies. Building energy optimisation algorithms. Based on defined parameters: user comfort, carbon and payback. Results Payback in £, carbon, comfort? Wall window ratios 20-70%.

23 Building Performance [1] Based on combined gas and electricity consumptions for the period Aug 2011 to July 2012 [2] Includes kWh associated with biomass boiler (based on delivered volumes of wood pellets). BuildingNett Usable Space 2011/12 Energy Consumption kWh [1] [1] kWh/m 2 Baker9351 m 2 2,838, Inglis9198 m 2 2,791, Electrical Engineering3286 m 2 2,944, Alan Reece3154 m 2 1,237, [2] [2] Nanoscience Centre1140 m 2 2,198,9741,929 Whittle Laboratory1695 m 2 1,394, Schofield Centre1082 m 2 286,721265

24 Current Energy Performance

25 Next steps? Implementation of ECRP schemes in new buildings. Low voltage distribution circuits and lighting. Further fabric performance modelling. Review and update of control algorithms for plant including Data Centres. Transfer of some environmental control to end users.

26 If you don’t do anything else… Your ‘aha’ moment Data collection and visibility Financial rewards/penalties