Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us.

Slides:



Advertisements
Similar presentations
Site Safety Plans PFN ME 35B.
Advertisements

Emergency Preparedness and Response
Disaster Planning What Supervisors Need to Know. Session Objectives You will be able to: Recognize the types of workplace disasters you may face Understand.
There are three types of emergencies:  Internal  External  Natural disasters.
JL Office Tower Emergency Action Plan Presentation.
Emergency Action Plans
MU Building Emergency Coordinator Training
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
OSHA Respiratory Protection Standard – 29 CFR Prepared by Daniel Gearhart, Division Chief, Retired.
MIDWEST WATER ANALYSTS ASSOCIATION JANUARY 30, 2015 EMERGENCY ACTION PLANS 1.
Emergency Evacuation.
Course Material Overview of Process Safety Compliance with Standards
ONLINE SELF-STUDY Emergency Coordinator Annual Update.
FLOOR WARDEN TRAINING Presented by State Risk Management 2011.
3700 Centerpoint Emergency Action Plan Tenant Training.
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
SOS Representative (SR) Training UC Irvine’s Injury and Illness Prevention Program
Spill Prevention and Control Regulatory Requirements Hazardous Waste Operations and Emergency Response (HAZWOPER) –29 CFR –Covers spill response.
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Developing a Chemical Risk Management Program
Confined Spaces in Construction: Applicable Standards Stan Liang, CIH, CSP, CET KTA-Tator, Inc.
What Is It And How Will We Measure It?
Chapter 15 1 CHAPTER 15 – EMERGENCY RESPONSE PLAN CEE 698 – Construction Health and Safety.
Emergency Action Plans/Fire Prevention Plans
HAZWOPER Overview.
You need to have them in place, You hope you don’t need to use them.
Emergency Response José A. Carpena, PE Area Director Puerto Rico Area Office Occupational Safety and Health Administration 2005 SWRI Annual Meeting.
Personnel Accountability Purpose: Identify a system of firefighter accountability on site of an incident and account for all firefighters, at any given.
1 Safety & Occupational Health LCDR Kenneth “KP” Pounds IH w/ Gulf Strike Team D-8 Response Div Federal On-Scene Coordinator Representative Training.
Employee Emergency Action Plans and Exit Routes Training Program.
Hazardous Waste and Emergency Response
The World Leader in High-Performance Signal Processing Solutions Emergency Response Teams Ron Scholtz- CHMM, REA Analog Devices, Inc. October 7, 2003.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
EMERGENCY RESPONSE PLANNING 2005 ARIPPA Technical Symposium David B. Binder Tanner Industries, Inc
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Copyright  Business & Legal Reports, Inc. BLR’s Safety Training Presentations Spill Prevention and Control.
Copyright ©2000 Business & Legal Reports, Inc. SPCC Safety Training Presentations Spill Prevention and Control.
Emergency Action Plan and Response Training
Florida Operational Level Hazardous Materials Training Program Florida Operational Level Hazardous Materials Training Module 3 Unit 1 Determining Operational.
Emergency Planning in your business St. Louis City LEPC General Meeting September 4, 2013.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Linn & Benton Counties Mid-Valley. Mid-Valley LEPC  Today's Presentation: Mid-Valley LEPC – who we are! Grants – Why apply? Emergency Plans – What are.
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
Florida Operations Level Hazardous Materials Training Unit 1 Program Introduction and Response Plans.
Critical Incident Procedures Two new procedures developed by committee 1.Managing a Non-Fatal Critical Incident PR Non-Fatal Critical Incident.
Emergency Action Plans
Hazardous Materials Business Plan Training Topic 2
RAPID INTERVENTION TEAMS This presentation is a work in progress and has not yet been adopted as policy. It is meant as a training guide to better.
Disaster Preparedness Are you prepared?. Effective Disaster Plans  Your plan should outline the basic preparedness steps needed to handle the anticipated.
Safety and Health Program Don Ebert- Risk Manager (509)
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Emergency and Disaster Response to Chemical Releases Introduction to Technician Level Training Module 1.
Emergency Response For the Hazardous Waste Worker.
Emergency Preparedness Emergency Action Plan – EAP Emergency Operating Procedure - EOP Do you have a written plan? Yes – Retained in Human Resources.
LA Basin Petroleum Pipeline Release TTX Goal Raising awareness of local and regional capabilities Building relationships and enhancing coordination Identifying.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Emergency Action Plan What to do in the event of an emergency.
Evacuation Plans For use in conjunction with 5-Minute Safety Talk.
Emergency Preparedness & Response
CO Chemical Safety Workshops for Regulated Facilities
Coordinating with Station Emergency Response Agencies
4.00 Explain the organization and structure of a hospitality business.
Because Technology Never Stops
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
Introduction A variety of situations may create the need to evacuate a University building including fires, natural disasters, and alarm activations.
HAZWOPER On-scene Commander
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
Building Emergency Evacuation Plan (BEEP) Training for Building Emergency Coordinators and Alternates.
Introduction A variety of situations may create the need to evacuate a University building including fires, natural disasters, and alarm activations.
Presentation transcript:

Presented to: RETA National Conference – Atlanta November 5, 2014 If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at: Emergency Action Planning It’s not just 9-1-1

Regulations:  Process Safety Management (PSM)  OSHA: Code of Federal Regulations, Title 29, Section (n). [29CFR § (n), 29CFR § (a), 29CFR § (a), (p), and (q)]  Risk Management Program (RMP)  EPA: Code of Federal Regulations, Title 40, Part (40CFR § 68.95) Is your facility going to response to an ammonia release or not? What are your responsibilities other than calling and waiting for the fire department to arrive? Regulatory Criteria - Emergency Planning & Response

Emergency Planning & Response - Compliance with PSM  OSHA – “Emergency Action Plan” Requirements:  Documented Plan  Procedures for reporting an emergency (ex: fire, NH 3 leak)  Evacuation route assignments  Account for all employees after an evacuation  Rescue & medical duties (not required to be in-house)  Names / job titles for people to contact for more information about the plan or their duties  Must include procedures for handling “small releases”  Alarm System must use a distinct signal for each purpose (ex: fire, Ammonia leak)

OSHA – “Emergency Action Plan” Requirements (cont.)  “Sufficient” number of employees to be trained to assist in a “safe and orderly” evacuation  Special attention for disabled employees including temporary disabled employees  Training / re-training must occur at the following times:  Initially when the plan is developed  Whenever the responsibilities or duties change  Whenever the action plan is changed What does this mean  PRACTICE!  Evacuation Drills at least annually  All employees on all shifts to participate  Evacuation maps posted near exits Emergency Planning & Response - Compliance with PSM

“Response” vs. “Action”  If facility chooses to utilize employees for “response” activities, further pre-planning and training is required.  Response requires a team of people trained in HAZWOPER and Incident Command System, use of proper PPE (SCBA – positive air pressure, full-face cartridge respirators).  Current interpretations include a minimum of 4 people  Buddy system with backups in full gear  Joint Response Team:  Coordinate with local responders!  Local Fire Department, Hazardous Materials Response Teams  Recommendation:  Send a written invitation (certified mail or ) to your local responder, HAZMAT, and LEPC to come on-site and become familiar with your facility.  Coordinate with private response company or neighboring facility Emergency Planning & Response - Interpretations

 From EPA Risk Management Plan Guidance, May 2000: “...it would be inappropriate, and probably unsafe, for a facility with only two full-time employees to expect that a major fire could be handled without the help of the local fire department or other emergency responder. EPA does not intend to force such facilities to develop emergency response capabilities. At the same time, you are responsible for ensuring effective emergency response to any releases at your facility. If your local public responders are not capable of providing such response, you must take steps to ensure that effective response is available (e.g., by hiring response contractors).” Emergency Planning & Response - EPA Guidance

Emergency Action Plan elements:  Site maps indicate evacuation route assignments.  Hazard Communication (NH 3 SDS available for review).  Employees trained in evacuation duties (accounting for any disabled employees).  Employees & Contractors know how to report an emergency within the Plant.  Designated On-Site Emergency Coordinator for all shifts.  Procedures to account for all employees and visitors.  Distinct signal to evacuate the workplace (PA, alarms, verbal warning, etc.).  Who to contact for more information on the plan. Emergency Planning & Response - Checklist for Implementation

Emergency Action Plan elements (con’t):  Wind sock (or other wind direction indicator) visible from assembly area(s).  Test facility PA / alarm systems / radios at least annually. Emergency Planning & Response - Checklist for Implementation

Emergency Action Plan elements (con’t):  Maintain all emergency response equipment properly  Conduct emergency evacuation drills that include all employees. Maintain records.  Emergency plan is coordinated with outside “responders” as appropriate. Emergency Planning & Response - Checklist for Implementation

DOT Isolation Zones / Coordination:  100 feet for slow leak venting to atmosphere.  300 feet for relief valve venting to atmosphere.  500 feet for major incident on the liquid side.  Sensitive Populations in the area.  Fire Department Staging Locations / Options Emergency Planning & Response - Checklist for Implementation

 Federal Reportable Quantity (Verbal only)  100 pounds or more - National Response Center ( ) requires immediate notification (within 15 minutes)  State & Local Reporting Quantities - Vary  Example: CA requires, Any “Significant Release or Threatened Release” Must be Reported  Notify Your Local LEPC and SERC  Which employee(s) are Designated to make Release Notifications Emergency Planning & Response - Emergency Reporting

What is your facility’s plan? Emergency Action vs. Emergency Response  Evacuation vs. HazMat Response Team  Capabilities of Local Responders  Maintain training records for:  Evacuation drills,  PPE (respiratory fit tests, medical evals),  HAZWOPER,  Incident Command (IC) System, etc. vs.

Summary:  You are responsible for ensuring effective emergency response to any releases at your facility.  If you rely on local emergency responders for all of the response effort, you must determine that they have the equipment and training to handle an incident.  If they don’t, you should consider one of the following: develop your own response capabilities; develop mutual aid agreements with other facilities; hire a response contractor; or provide support to local responders so they can acquire the equipment & training. Regulatory Criteria - Emergency Planning & Response

Must Ensure the following:  Facility’s Emergency Action Plan is accurate and up-to-date.  Employees and Contractors are trained in the Emergency Action Plan.  All emergency response equipment is maintained properly.  Emergency evacuation drills are performed annually and documented (for all shifts).  Coordinated with the local emergency responders.  Certified mail or invitation to come on-site for emergency pre-planning Regulatory Criteria - Emergency Planning & Response

Recent Citations:  EPA - Emergency Notification Requirements  Update Emergency Response Program to include protocols for ensuring notification will be made within 15 minutes of releasing in excess of 100 pounds of ammonia. immediately  Federal Requirement: “Facilities must immediately notify the LEPC and the SERC if there is a release into the environment of a hazardous substance that is equal to or exceeds the minimum reportable quantity set in the regulations” (100 pounds in 24 hours for ammonia).  NOTE: The reporting criteria (e.g., quantity, who to call, what to report, etc.) varies state-to-state. Regulatory Criteria - Emergency Planning & Response This information should be spelled out in your EAP / ERP.