No: 1 CEMSIS wp6_beg010_v0_1_fisa slides.ppt CEMSIS FIKS-CT-2000-00109 Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk Pavey,

Slides:



Advertisements
Similar presentations
BIOMASS FUTURES: Biomass role in achieving the Climate Change & Renewables EU policy targets. Demand and Supply dynamics under the perspective of stakeholders.
Advertisements

Object-Oriented Application Frameworks Much of the cost and effort stems from the continuous re- discovery and re-invention of core concepts and components.
Theory-Based Evaluation:
Business Resource Efficiency and Waste (BREW) Programme Mark Atherton Head of Sustainable Development Northwest Regional Development Agency Nick Storer.
Roadmap for Sourcing Decision Review Board (DRB)
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Define & Compare Flowcharts of Each Method Tom Delong.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
KEY CLIMATE CHANGE POLICIES AND POLICY APPROACHES REPORTED BY ANNEX I PARTIES IN THE THIRD NATIONAL COMMUNICATIONS Katia Simeonova Programme Officer UNFCCC.
Rational Unified Process
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
BIOMASS FUTURES: Biomass role in achieving the Climate Change & Renewables EU policy targets. Demand and Supply dynamics under the perspective of stakeholders.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
Codex Guidelines for the Application of HACCP
WHO FOOD COURSE SAFE FOOD PRODUCTION: HACCP HACCP and food regulators.
Information Technology Audit
File: 1 The OECD Halden Reactor Project The OECD Halden Reactor Project (HRP) is an International Research Project between 19 countries in Europe, America.
Office of Nuclear Energy U.S. Department of Energy
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
No: 1 CEMSIS 1 WP3 - Use of pre-developed products Key issues N. Thuy EDF R&D.
1 REQUIREMENT ENGINEERING Chapter 7. 2 REQUIREMENT ENGINEERING Definition Establishing what the customer requires from a software system. OR It helps.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
Structure of the HFA2 Input Paper. Outline Introduction and Rationale Process of consultation in the Asia Pacific region Synthesis of the AP experience.
ESA/ESTEC, TEC-QQS August 8, 2005 SAS_05_ESA SW PA R&D_Winzer,Prades Slide 1 Software Product Assurance (PA) R&D Road mapping Activities ESA/ESTEC TEC-QQS.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
No: 1 CEMSIS wp6_beg037_v0_2_fisa 2003 slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk.
CONFIDENTIAL ©2014 PAREXEL INTERNATIONAL CORP. ALL RIGHTS RESERVED. REGULATORY INTELLIGENCE: INDUSTRY’S BEST PRACTICE OMICS 5 th International Pharmaceutical.
Chemistry making a world of difference Responsible Care ® - Thrusts in Europe Dr Richard Robson Cefic Director APRCC, Manila, Philippines 17 th November.
1 Introduction to Software Engineering Lecture 1.
The EU’s Better Regulation Package Implementation of Impact Assessment Manuel Santiago European Commission DG Enterprise & Industry.
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
Core Banking Transformation: A Roadmap to a Successful Core Banking Product Implementation - PMI Virtual Library | | © 2008 Kannan S. Ramakrishnan.
Waste Management - The Importance All wastes have the potential to cause environmental damage if not correctly managed The concept of “producer responsibility”
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
27/3/2008 1/16 A FRAMEWORK FOR REQUIREMENTS ENGINEERING PROCESS DEVELOPMENT (FRERE) Dr. Li Jiang School of Computer Science The.
Food Security Response Analysis: Definitions, Tools and Potentials Overview FSNWG workshop Nairobi 29 April – May
Tom Vereijken | Chairman, Eucetsa TOWARDS A EUROPEAN ETV SYSTEM Tom Vereijken EUCETSA.
DOE ASSET MANAGEMENT PLAN
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
No: 1 CEMSIS wp6_beg022_v0_4_intro slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Evaluating Engagement Judging the outcome above the noise of squeaky wheels Heather Shaw, Department of Sustainability & Environment Jessica Dart, Clear.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
Testing Integral part of the software development process.
CMMI Certification - By Global Certification Consultancy.
Trigo White Ltd Practical project risk assessment VIII Conferencia Internacional Hotel Tivoli Oriente, Lisbon 28 th November 2014 Simon White Consultant,
Session 3 General RIA Training 6–8 July 2009 EuropeAid/125317/D/SER/TR
Purchasing supplies at CERN
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Standards for success in city IT and construction projects
Draft OECD Best Practices for Performance Budgeting
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
Engineering Processes
CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, wp6_beg037_v0_2_fisa 2003 slides.ppt.
ESS.VIP Validation Item 5.1
Presentation transcript:

no: 1 CEMSIS wp6_beg010_v0_1_fisa slides.ppt CEMSIS FIKS-CT Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, Deryk Pavey,

no: 2 CEMSIS wp6_beg010_v0_1_fisa slides.ppt CEMSIS Objectives u Programmable Instrumentation and Control (I&C) l safety systems (e.g. protection) l safety-related systems (e.g. control, data presentation) u Common approach to development and safety justification l maximise safety l minimise cost u Modernisation/Refurbishment l analogue/discrete logic replacement with computer-based systems

no: 3 CEMSIS wp6_beg010_v0_1_fisa slides.ppt ‘Stakeholders’ in CEMSIS u Nuclear Plant Operator l British Energy (co-ord.)UKelectricity generation l Electricite  de FranceFelectricity generation l British Nuclear FuelsUKnuclear fuel processing u Suppliers & System Integrators l Framatome ANPDEC&I supplier l Sycon InternationalSEsystem developer u Safety Authorities & Assessors l AV NuclearBinspection and licensing l AdelardUKsafety consultancy u Software Reliability Specialist l TU LundSEresearch & education

no: 4 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Key Issues u Harmonisation & Structuring of Safety Justification approaches u Definition of Requirements for Systems Important to Safety u Use of Pre-Existing Software in Systems Important to Safety l potentially including class A systems u Use of Graphical Languages in Systems Important to Safety

no: 5 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Work Package Tasks Safety Justification Survey and Framework Safety Justification Framework WP1 Requirements Capture Survey and Lifecycle Requirements Capture Guidelines WP2 Pre-Existing S/W Strategy & Techniques Pre-Existing S/W Guidelines WP3 Graphical Languages Review and Evaluate Graphical Languages Report WP4 WP0,6 Management and Dissemination Case Studies: UK: fuel reprocessing F: PWR I&C replacement SE: safety monitoring WP5

no: 6 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Safety Justification Framework u Take account of current EU experience l EC NRWG Task Force on Safety Critical Software (ARMONIA) l Survey of practices in CEMSIS Member States u Synthesis of survey responses l Main trends and consensus l Problem areas to address in CEMSIS work packages — methods for structuring software safety cases — clarification of concepts such as ‘COTS’ — safety justification should take account of plant level risk analysis — how to make best use of diversity — how to evaluate software reliability (CMF the major factor)

no: 7 CEMSIS wp6_beg010_v0_1_fisa slides.ppt u Survey of requirements techniques, research and experience. u Requirements Lifecycle l Discovery l Analysis l Negotiation l Definition and Validation Requirements Capture u Taxonomy criticality, complexity, reuse, novelty, cost, timescales etc. Refurbishment levels (existing system, new needs, regulations, standards) (stakeholders: sponsors, users, designers, regulators etc.) (specification + rationale)

no: 8 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Pre-existing Software u Including “COTS” (Commercial Off The Shelf) u Strategy: Two phases l “Pre-qualification” - reduce uncertainty and delay — provide evidence in advance for all applications l Application Qualification - some always needed — provide evidence specific to one application u Types of assessment l Functional - ensure features of product are adequate for safe use l Dependability - evidence that the product is sufficiently reliable — taking account of its safety class

no: 9 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Pre-existing Software (2) u Taxonomy & Strategies for Dependability Assessments White box without Experience White box with Experience Grey box without Experience Grey box with Experience Black box with Experience Black box without Experience A - Complex A - Medium A - Simple B - Complex B - Medium B - Simple AW AW / AB BG BG / BB AB BB u AW: white-box assessment of class A products u AB: black-box assessment of class A products u BG: grey-box assessment of class B products u BB: black-box assessment of class B products

no: 10 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Graphical Specification Languages u Functional Requirements - safety risk of: l error in formulation l omission l misunderstanding etc. u Integrity - safety risk of: l underlying inconsistency or ambiguity l invalid verification results or reasoning l incorrect transformation into code u Reports: l evaluation of available languages l advice on safety justification TempPress & Trip

no: 11 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Application and Evaluation u Three Case Studies: l UK Nuclear fuel reprocessing plant controlBNFL l I&C replacement on a French PWREDF l Safety monitoring system on a Swedish NPPSycon u Identify safety and cost-relevant aspects l safety requirements l implementation options l example arguments for safety justification u Evaluate and refine guidance documents

no: 12 CEMSIS wp6_beg010_v0_1_fisa slides.ppt Conclusion u On target to provide practical guidance illustrated with realistic examples. u Key audience: l Senior I&C engineers and managers of refurbishment projects l Development engineers and managers in the supply industry l SMEs and service companies in the refurbishment market l Regulators and policy makers u Impact on strategy: l Accelerate inter working in member states — between utilities, suppliers and regulators l Help to focus national R&D efforts