Mercury Storage Project in Asia and the Pacific Desiree Montecillo Narvaez Programme Officer, Mercury and other Metals Programme United Nations Environment.

Slides:



Advertisements
Similar presentations
1 1 David Piper, UNEP DTIE Chemicals Branch 2nd Global Forum on ASGM Lima, Peru 3 to 5 September 2013 ASGM IN THE MINAMATA CONVENTION ON MERCURY …to protect.
Advertisements

1 1 Second Global Forum on Artisanal and Small Scale Gold Mining (ASGM) Lima, Peru, 3 to 5 September 2013 AN INTRODUCTION TO NATIONAL ACTION PLAN DEVELOPMENT.
Glossary of terms relevant to discussion of mercury storage and disposal Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa,
Best Available Techniques (BAT)
Armand Racine Consultant Chemicals Branch
Managing Hazardous Waste India-EU Environment Forum Waste Management in the 21 st Century 12 November 2005 Sarah Paul Senior Policy Adviser Hazardous Waste.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Concepts for the environmentally sound management of surplus mercury Sven Hagemann GRS.
PBT – P2 Preventing Pollution: A Tool to Reduce and Eliminate Persistent Toxic Substances in the Great Lakes Basin.
Programming directions for GEF-6 Climate Change Mitigation
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
Export of mercury and mercury waste Sven Hagemann GRS.
High Level Sub-regional Consultation on Advancing Action on Short Lived Climate Pollutants (SLCP) in Southeast and Northeast Asia 19 August 2014, Bangkok,
The UNEP Global Mercury Programme and Fate and Transport Research
GEF and the Conventions The Global Environment Facility: Is the financial mechanism for the Stockholm Convention on Persistent Organic Pollutants Is the.
Facilitating MEA Implementation with Cleaner Production: Stockholm Convention on Persistent Organic Pollutants (POPs)
Mercury supply, demand and trade in South East and East Asia Sven Hagemann GRS Asia Pacific (AP) Regional Mercury Storage Project Executive Committee (Execom)
Mercury Uses and Releases Presented by Michael Bender Mercury Policy Project/ Zero Mercury Working Group UNEP Mercury Products Meeting.
Addressing Global Mercury Issues Presentation to C-MERC Workshop, Portsmouth NH Gail Lacy EPA Office of Air Quality Planning and Standards September 8,
Mercury: global policy, immediate action Mercury Two country -Mexico and Panama- Storage and Disposal Project Results Workshop 3-4 July 2013 Mexico City,
Storage and disposal of mercury and mercury waste in Asia - Conclusions Sven Hagemann GRS.
Storage and Disposal Project in Argentina and Uruguay – Findings and Lessons Learned.
PROJECT BACKGROUND & PROGRESS NIGERIA POLYCHLORINATED BIPHENYLS (PCB S ) MANAGEMENT PROJECT (P )
NATIONAL STRATEGIC PLAN
US EPA’s Chemical Management Wendy Cleland-Hamnett, Acting Director Office of Pollution Prevention and Toxics.
1 United Nations Environment Programme Summary of UNEP support for action on harmful substances of global concern including heavy metals and POPs 27th.
Central Asia Regional Health Security Workshop Co-organized with the Command Surgeon, US Central Command and the George C. Marshall European Center for.
UNEP POPs Negotiations Background Mandate Status Report Relevance to Great Lakes.
Sven Hagemann GRS Asia Pacific (AP) Regional Mercury Storage Project
1 A REGIONAL PERSPECTIVE ON COP ISSUES – SESSION 4: DEVELOPMENT AND TRANSFER OF TECHNOLOGY By Angela Katongo Kabuswe.
Decision making process / basic options assessment Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa, Consultan t Montevideo,
TRP Chapter Chapter 3.1 Regulatory approaches.
Options Analysis and Feasibility Study for the Safe Storage of Mercury in Latin America and the Caribbean Desiree Montecillo Narvaez Programme Officer,
1 Mercury Storage Project Desiree M. Narvaez Mercury and other metals programme Chemicals Branch DTIE United Nations Environment Programme.
TRP Chapter Chapter 5.4 Facility development.
Regional Resources Centre For Asia and the Pacific 1 PROGRESS OF ACID DEPOSITION MONITORING NETWORK IN EAST ASIA (EANET) Ms. Adelaida B. Roman Coordinator,
1 Management of Mercury containing Wastes from Oil and Gas Operation in Indonesia Rasio Ridho Sani Director of Bureau for Planning and International Cooperation.
Mercury Pollution Prevention in Healthcare Initiative Erie County Department of Environment & Planning Western New York Healthcare Association Buffalo.
© Product Stewardship Institute, Inc. October 8, 2009 Meeting sponsored by:
1 EUROPEAN COMMISSION CLIMATE CHANGE UNIT European Climate Change Programme: legislative action fluorinated gases Phil Callaghan European Commission DG.
U.S. work on surplus mercury Presentation by Lynn Vendinello National Program Chemicals Division, U.S. EPA April, 2009.
Michael Bender Mercury Policy Project/Zero Mercury Working Group Montevideo, Uruguay April 2009.
Can the U.S. act alone on mercury? Some initial hypotheses from the analysis of commodity flows Edward Weiler, Economist (202)
Facility Inventory for mercury storage and disposal Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa, Consultant Montevideo,
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
GEF and the Conventions The Global Environment Facility: Is the financial mechanism for the Stockholm Convention on Persistent Organic Pollutants the.
Mercury Waste: Synergies with the Basel Convention Ibrahim Shafii Secretariat of the Basel Convention.
EU INITIATIVES ON MINING WASTE. Why an initiative on Mining Waste ? Key environmental issues: l Potential environmental risks during disposal m Safety.
Methodologies and Tools for Technology Needs Assessment: an Overview Zou Ji Dept. of environmental Economics and Management, Renmin University of China.
Excess Mercury in Latin America and the Caribbean, * Latin America and Caribbean Mercury Storage Inception Workshop Organised by UNEP Chemicals,
Reduction of Mercury in Products Action Plans. 2 Action Plan  describes the activities to be carried out and the related implementation strategies for.
5 th ITU Green Standards Week Nassau, The Bahamas December 2015 Standards, Guidelines and Best Practices Applicable to the Environmentally Sound.
1 VOLUNTARY MERCURY CELL PHASE OUT PROGRAMME OF INDIA Dr.Y.R.SINGH Executive Director ALKALI MANUFACTURERS’ ASSOCIATION OF INDIA MERCURY TECHNICAL BRIEFING.
1 UNEP Global Mercury Partnership April UN General Assembly Resolution 60/215 defines partnerships as… “voluntary and collaborative relationships.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
1 Mercury Partnerships May 2007 Presentation to the Asian Mercury Products Workshop.
THE BASEL, ROTTERDAM AND STOCKHOLM CONVENTIONS Barbados, March 2009.
1 UNEP Global Mercury Partnership October Overview.
Management of Chemicals and Wastes in Brazil Contribution of global agreements relevant for chemicals and waste management to national implementation of.
ASSESSING POSSIBLE INCENTIVES TO ENCOURAGE THE PRIVATE SECTOR TO INVEST IN ENVIRONMENTALLY SOUND MANAGEMENT Dr. Leila Devia, BCRC Argentina Ross Bartley,
World Summit on the Information Society Forum 2016 Promoting sustainable ewaste management systems in developing countries Klaus Tyrkko Unit Chief UNIDO.
The Barbados Case Study Results. The Current Situation 2 incinerators, one small, one large Not BAT or BEP What is necessary to implement BAT and BEP.
Multilateral Environmental Agreements Branch UNIDO1 Fifth Meeting of the Regional Ozone Network in Europe and Central Asia Workshop on ODS disposal &destruction.
Michael Bender, Director Mercury Policy Project
Mercury and Other Metals Programme Chemicals Branch, DTIE
Experiences of the projects on used oils
Multidisciplinary nature of environmental studies Lecture #1
Making the Business Case for Conversion
Overview of the Minamata Convention On Mercury
Presentation transcript:

Mercury Storage Project in Asia and the Pacific Desiree Montecillo Narvaez Programme Officer, Mercury and other Metals Programme United Nations Environment Programme (UNEP)

Demand and Supply Equilibrium demand supply Demand- Supply Balance CEE: 2011 LAC: 2015 Asia: 2027

Sources of Mercury Supply 2005 Sources of mercury supply (2005) Mercury supply (metric tonnes) Primary mercury mining By-product mercury Recycled mercury from chlor-alkali wastes a) Recycled mercury - other b) Mercury from chlor-alkali cells (decommissioning) c) Stocks d) Total Source: Maxson, Peter

Mercury Demand/Consumption 2007 ApplicationMetric Tonnes Small-scale/artisanal gold mining650-1,350 Vinyl chloride monomer (VCM) production800-1,000 Chlor-alkali production Batteries Dental use Measuring devices Lighting Switches and relays Other (PU elastomers, paints, testing and laboratory, pharmaceutical, cultural uses) Total3,000-4,700 Source: Maxson, Peter

Estimated Surplus Mercury by Region for 40 years 5 Surplus mercury [t]

National/ regional mercury supply What is Surplus Mercury? 6 Need to manage surplus mercury  storage  disposal National / regional demand for products & proceses National/ regional surplus Elemental Hg & Hg compounds like calomel

Important Sources of Surplus mercury 7 Export Non –ferrous metal production (zinc, gold) Decommis- sioning of mercury cells (chlor alkali) End of life products Contaminated sites Oil & gas industry Elemental mercury Mercury compounds Mercury contaminated material Mercury added products Primary waste type

8 How Much Surplus Mercury Will Have to be Managed in South/ South East and East Asia? (Concorde 2009) Main assumptions: VCM production: decrease of consumption after 2015 Zinc smelting: strong increase of Hg recovery between now an 2030 Alternative scenario: 7,500 t (reduced supply for ASM) Regional surplus 5,500 t ( ) Possibly national surpluses ? ?  Management options for surplus mercury?  AIT/RRCAP study (2010)

Governments agreed to:  NEGOTIATIONS - Elaborate a legally binding instrument on mercury, which could include both binding and voluntary approaches in parallel with  INTERIM ACTIVITIES - Accelerated voluntary action on mercury with the Global Mercury Partnership as one of the key delivery vehicles UNEP GC decision 25/5 Para 25

(a)Objectives; (b)(b) Reduction of supply and enhance capacity for sound storage; (c) Reduction of demand; (d) Reduction of international trade; (e) Reduction of atmospheric emissions; (f) Waste and remediation of contaminated sites; (g) Increasing knowledge; (h) Capacity-building and technical and financial assistance; (i) Compliance. Para 27 – Instrument to include provisions on:

Para 34 – Existing work UNEP to continue and enhance, as part of international action on mercury, existing work in the following areas: ( a)Enhancing capacity for mercury storage; (b)Reducing supply of mercury from, f.ex. primary mercury mining; (c)Conducting awareness ‑ raising and pilot projects in key countries to reduce mercury use in artisanal and small ‑ scale gold mining; (d)Reducing mercury use in products and processes and raising awareness of mercury ‑ free alternatives; (e)Providing information on BAT and BEP and on conversion of mercury-based processes to non-mercury based processes; (f)Enhancing development of national inventories on mercury; (g)Raising public awareness and supporting risk communication; (h)Providing information on sound management of mercury.

INC 2, Chiba, Japan, Jan Affirmed the importance and noted that the issue of mercury storage is inherently related to issues of supply and demand Delegates said that interim storage projects should be undertaken in the short term While long term plans and policies are being developed

Asia Mercury Storage Project Objective: prevent reentry of mercury as a commodity to the global market and find environmentally sound storage solutions for excess elemental mercury Activities and Output: Inception workshop: March 2009, Bangkok Assessment Report of Excess Mercury Supply in Asia Options for the safe long term storage- above ground, below ground, export to foreign country Creation of the project executive committee (India, Japan, Nepal, PNG,,ZMWG (Ban Toxics) Pakistan, Indonesia, Phil)

14 AIT/RRCAP Options Study for Asia and the Pacific: Findings Considered OptionRecommendation Aboveground warehouse storage of elemental mercury Preferred option – in desert area Underground storage of elemental mercury Not considered implementable due to lack of salt deposits and high costs Export to another regionPreferred option

Findings of the Asia Pacific study Legal framework required to regulate storage obligation, site selection, licensing, operation and liability Need for bi- and multilateral agreements to arrange relationships between countries that export and countries that store mercury. In Addition: ‘Interim’ storage facilities to be located at the place of still operating Industrial plants 15

AIT – Study: Points for Discussion –Specification of Terms “Storage” sensu strictu = temporary measure “Disposal” = ultimate decision to dispose of and eliminate waste from the biosphere permanently –Geological and Climatic Aspects Availability of geological formations Exclusive prerequisite of dry atmospheric conditions Overall concept of underground disposal –Cost Aspects Rough estimation (several tens of millions US-$) vs. designation of single $ 16

AIT – Study: Points for Discussion (contd.) –Export Not an exhaustive concept Temporary or otherwise limited measure applicable under certain conditions –Glossary Definitions for terms which do not play a major role Essential terms are partly missing, e.g. –“storage”, –“long-term”, –“disposal” 17

The UNEP mercury storage projects: gaps and needs Other waste disposal issues: Management of Hg containing tailings not addressed Little information on other mercury containing waste types (quantity, types, treatment, disposal) Up-to-date description of stabilization, permanent, temporary storage options in Basel Guidelines Support development of appropriate legislation on Hg waste management (e.g. regulatory toolkit) Guidance for management of stockpiles of Hg commodities and products Terminology 18

Mercury waste: disposal Separate collection of mercury waste Cambodia: thermometers in hospitals Indonesia: lamps Safely stored in temporary storage facilities, but how long is temporary?  urgent need for treatment/ disposal facilities

Revised Options Analysis of mercury storage in Asia and the Pacific 20

Areas Where the Asia Options Study Could be Improved 21 1.Outline of Technical concepts 2.Presence of Geological formations potentially suitable for storage facilities 3.Geo-environmental hazards 4.Country-specific and regional agreements on import/export 5.Information on the economics of hazardous waste management/ cost estimates for underground disposal 6.Potential benefits of stabilization 7.Evaluate feasibility of options based on new findings

Goal of Revised Study –Identify and fill in the information gaps –Collect additional information –Identify technical options –Provide recommendations for further work towards the long term storage of elemental mercury 22

23 Asia Storage Project Execom Terms of Reference To catalyze regional action in order to address excess mercury in Asia To explore options and other related issues in addressing excess mercury supply in Asia taking into consideration costs and benefits, social and political acceptability, technical and environmental factors, public health, infrastructure, regulatory requirements and site selection To communicate project issues and concerns to governments and stakeholders in the Asian region, and to convene meetings as needed to facilitate progress toward an Asian storage solution To recommend appropriate legislation/policies consistent with the establishment of a terminal storage facility

Terimah Kasih UNEP Chemicals Desiree Montecillo Narvaez Programme Officer Mercury and other Metals Programme Webpage: 24