All Regions Workshop #2, 5-7 Oct.. 2009, Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania

Slides:



Advertisements
Similar presentations
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
Advertisements

A.Margiotta, SNOW 2006, Stockholm, 6 May 2006 Status Report of the NEMO Project (NEutrino Mediterranean Observatory) Towards a km 3 Neutrino Telescope.
ESONET LIDO - Demo Mission: the East Sicily node The Laboratori Nazionali del Sud–INFN (Italian Institute for Nuclear Physics) has set up two cabled deep.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
Status of the KM3NeT Project  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards Implementation 3rd Workshop.
ITU-UNESCO IOC-WMO Workshop Submarine Cables for Ocean/Climate Monitoring and Disaster Warning-Roma European Multidisciplinary Seafloor Observatory.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
4 th International Workshop on Very Large Volume Neutrino Telescopes for the Mediterranean Sea October 2009, Athens, Greece NEMO-SN1 observatory.
Listening to the Deep-Ocean Environment ESONET (European Sea-Floor Observatories Network) 5-7 Oct. 2009All Regions Workshop #2.
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
INFN Bari, Bologna, Catania, Genova, LNF, LNS, Napoli, Pisa, Roma Università Bari, Bologna, Catania, Genova, Napoli, Pisa, Roma “La Sapienza” CNR Istituto.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
 NEMO The NEMO Status Report M.Taiuti on behalf of the NEMO Collaboration Merida, Yucatan, Mexico 30th International Cosmic Ray Conference.
Isabella Amore Laboratori Nazionali del Sud - INFN, Catania International School of Cosmic Ray Astrophysics 15th Course: "Astrophysics at Ultra-high Energies"
Salvatore Viola, INFN-LNS VLVνT 2011, Erlangen - October 12-14, 2011 Salvatore Viola 5th International Workshop on Very Large Volume Neutrino Telescopes.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
Underwater Neutrino Detection in the Mediterranean Sea: From Presence to Future  Scientific Case: Some highlights  Current Projects: ANTARES, NEMO, NESTOR.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
KM 3 Neutrino Telescope European deep-sea research infrastructure DANS – symposium Maarten de Jong.
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
G. Riccobene, INFN-LNS Nikhef, May 24-25, 2012 Giorgio Riccobene INFN-Laboratori Nazionali del Sud Abyssal undular vortices in the Eastern Mediterranean.
EGI Technical Forum 18 September Authors: P. Favali (INGV), G. Riccobene (INFN), L. Badiali (INGV), D. Cesini (INFN), G. Giovanetti, (INGV), E.
KM3NeT deployment aspects Transportation – Deployment – Connection - Calibration Spyridon Koutsoukos.
Angelo Orlando for the NEMO collaboration VLV T08, Toulon, France April International Workshop on a Very Large Volume Neutrino Telescope for.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
EGI Community Forum 27 March Giuditta Marinaro 1.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
LIDO Demonstration Mission (LIDO-DM) “LIstening to the Deep Ocean” The DM objectives are: geo-hazard and bio-acoustics LIDO-DM will operate a first nucleus.
Status of the LIDO East Sicily Station F.Bruni.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
WPH goals: prepare the specifications for the main components of the deep-sea infrastructure: - Main electro-optical cable (MEOC); - Power transmission.
The Neutrino Telescope of the KM3NeT Deep-Sea Research Infrastructure Robert Lahmann for the KM3NeT Consortium Erlangen Centre for Astroparticle Physics.
Earth-Sea Science Junction Boxes
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Marseille 30 Dec ’13 KM3NET Marine Operations Catania - Status Klaus Leismüller.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
Deep sea infrastructure: ROV M. Musumeci KM3NET meeting Paris October 2008.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
Some developing ideas on Seafloor cabling and copper/fibreoptic split points where this talks builds and borrows from the work of VENUS, MARS, NEPTUNE.
Status Optical System KM3NeT
Deep-sea neutrino telescopes
MARIGOLD the MEUST deep sea network
Giorgio Riccobene, INFN-LNS
KM3NeT multi-km3 neutrino telescope: perspectives
Istituto Nazionale di Geofisica e Vulcanologia, Italy
Marine and Environmental Agencies
Interdisciplinary Activity ANTARES
M.Taiuti on behalf of the NEMO Collaboration
LNS in numbers INFN Laboratori Nazionali del Sud are located in the Catania University campus area Total area: m2 Total volume: m3 Staff members:
Els de Wolf 20 February 2012, Catania
(NEutrino Mediterranean Observatory): Toward a km3 Neutrino Telescope
Junction Boxes for KM3NeT
VLVnT08 Summary Talk E. Migneco.
THE ANTARES SITE SECONDARY JUNCTION BOX
Presentation transcript:

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania WG discussion on Mediterranean Sites All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN

East-Sicily: KM3NeT and ESONET/EMSO Three sites of common interest for the KM3NeT and ESONET / EMSO Consortia

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Catania and Capo Passero Infrastructures realised by INFN within the NEMO Project aiming at the construction of a deep sea underwater neutrino telescope. Fundings also by EU, Regione Sicilia, MIUR Catania Test Site: 25 km East offshore the port of Catania, 2000 m depth Capo Passero Site: 85 km South East offshore Capo Passero, 3500 m depth Infrastructures realised by INFN within the NEMO Project aiming at the construction of a deep sea underwater neutrino telescope. Fundings also by EU, Regione Sicilia, MIUR Catania Test Site: 25 km East offshore the port of Catania, 2000 m depth Capo Passero Site: 85 km South East offshore Capo Passero, 3500 m depth

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Catania Test Site infrastructure LNS Test Site Laboratory at the port of Catania LNS-INFN Catania Internet Radio Link NEMO JB Test Site South 5 km Installation at 2000 m depth 20 km INGV Test Site North 5 km

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Catania TS shore facilities The Catania Test Site shore laboratory has: Large structures construction hall Data acquisition hall Power suppliers (under UPS) Electronics workshops Conference room 20’’ pressure test chamber (400 bar) 32 Mbps radio link to LNS-INFN. The port of Catania is the logistic base of Elettra- Tlc, member of MECMA and owner of the Teliri and Certamen C/L vessels. LNS is one of the four laboratories of INFN. LNS is connected (now at 1 Gbps) to the Italian Internet Infrastructure for Scientific Research (GARR) LNS hosts the main Storage Units and Servers (e.g. For LIDO-DM) and it is a node of the European GRID The Catania Test Site shore laboratory has: Large structures construction hall Data acquisition hall Power suppliers (under UPS) Electronics workshops Conference room 20’’ pressure test chamber (400 bar) 32 Mbps radio link to LNS-INFN. The port of Catania is the logistic base of Elettra- Tlc, member of MECMA and owner of the Teliri and Certamen C/L vessels. LNS is one of the four laboratories of INFN. LNS is connected (now at 1 Gbps) to the Italian Internet Infrastructure for Scientific Research (GARR) LNS hosts the main Storage Units and Servers (e.g. For LIDO-DM) and it is a node of the European GRID

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: TS cable and terminations

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Catania TS North SN-1 ( ) Sensors 3-component seismometer; Hydrophone (geophysics); Gravity meter; Scalar magnetometer; 3-axes current meter; CTD SN-1 ( ) Sensors 3-component seismometer; Hydrophone (geophysics); Gravity meter; Scalar magnetometer; 3-axes current meter; CTD 2005TSN Frame and SN-1 Installation 2008SN-1 recovery for refurbishment 2010LIDO East Sicily Installation (TSN) SN-1 connection SN1- recovery Frame deployment

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Catania TS South 2005TSS Frame and O DE installation 2006Junction Box and NEMO Phase 1 deployment 2007Junction Box recovery for maintenance 2008JB re-deployment. O DE recovery for refurbishment 2010LIDO East Sicily Installation (TSS) 2005TSS Frame and O DE installation 2006Junction Box and NEMO Phase 1 deployment 2007Junction Box recovery for maintenance 2008JB re-deployment. O DE recovery for refurbishment 2010LIDO East Sicily Installation (TSS) ExperimentsSensors O DE 4 hydrophones (bioacoustics, environmental monitoring) NEMO Phase 116 optical modules, CTD, ADCP (neutrino telescope demonstrator) ExperimentsSensors O DE 4 hydrophones (bioacoustics, environmental monitoring) NEMO Phase 116 optical modules, CTD, ADCP (neutrino telescope demonstrator) Frame with O DE Junction Box NEMO Phase-1 tower

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Catania TS South

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: the JB at Catania TS South 700 VAC (3-phase) 10 kVA power supply is installed on-shore Two output e.o. ROV mateable connectors available Power load per outup connector: 1.5 kVA VAC (3-phase) Optical fibre link: DWDM (optional CWDM) Two output e.o. ROV mateable connectors available Power load per outup connector: 1.5 kVA VAC (3-phase) Optical fibre link: DWDM (optional CWDM)

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: LIDO at the Catania Test Site LNS Test Site Laboratory at the port of Catania: shore data acquisition system; local storage unit LNS-INFN Catania: main storage unit; servers; 1 Gbps connection to internet Radio Link (32 Mbps) NEMO JB Test Site South Test Site North 5 km Installation at 2000 m depth 20 km LIDO TS North New ! CREEP of UCL LIDO TS South

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: CREEP undersea deformation lab Study of accelerations preceeding crustal failure CREEP

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN Shore Laboratory in Capo Passero Harbour East-Sicily: Capo Passero infrastructure Capo Passero is an infrastructure suitable for km 3 -scale neutrino telescope installation (KM3NeT) Shore laboratory Power supplier 10 kV - 50 kW Construction Hall Data Acquisition Room Optical fiber to LNS (requested) Submarine cable 100 km - 20 fibres, DC-sea return Submarine Infrastrcture DC/DC Converter 10 kV-375 V Neptune’s-like design ROV connectors to end users The site selected for the km 3 detector lies on a flat and wide plateau CP Site

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Capo Passero infrastructure The cable: 20 fibres, 1 conductor 100 kW (tested upto 80 kW), sea return Deployed on July 2007 by the Elettra Tlc – Certamen C/L. The cable fibres were continuoisly monitored from shore during the installation. Monitoring continues. The cable is suitable for the km 3 telescope The cable: 20 fibres, 1 conductor 100 kW (tested upto 80 kW), sea return Deployed on July 2007 by the Elettra Tlc – Certamen C/L. The cable fibres were continuoisly monitored from shore during the installation. Monitoring continues. The cable is suitable for the km 3 telescope Capo Passero village Capo Passero Site Cable route INFN has also applied to GARR, within the new GARR-X network, for an optical fibre connection (land) from the Capo Passero shore lab to the LNS.

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN Alcatel shore power supply (50 kW, 10 kV max) and line power converter installed in the Capo Passero shore Lab East-Sicily: the CP power supply system Antares Mini Line (2009) KM3NeT Tower Prototype (2010) future km 3 Towers 100 km cable Medium Voltage Converter Cable Termination Assembly 1.5 m Deployment foreseen in the end of 2009 Underwater Frame

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: the CP power supply system The Medium Voltage Converter: fully tested and ready for deployment 10 kV-DC from shore (10 kW at full work load) to 375 VDC  6 MVC required for the km 3 Max output current 25 A, Operational with no load, Output Voltage ripple 1.5 V Voltage Overshoot and Undershoot on boot/stop: 8% Safety switch off at 100 A output for t > 30 µs The Medium Voltage Converter: fully tested and ready for deployment 10 kV-DC from shore (10 kW at full work load) to 375 VDC  6 MVC required for the km 3 Max output current 25 A, Operational with no load, Output Voltage ripple 1.5 V Voltage Overshoot and Undershoot on boot/stop: 8% Safety switch off at 100 A output for t > 30 µs 48 sub converters: 200Vin - 50Vout divided in to 6 stacks each with a control unit. The 48 sub converters have: Inputs in series Outputs in series/parallel matrix Large number of Sub Converters can fail without loss of output current, (50%). Cooling system in Fluorinert. Topology by JPL NASA, designed for NEPTUNE 48 sub converters: 200Vin - 50Vout divided in to 6 stacks each with a control unit. The 48 sub converters have: Inputs in series Outputs in series/parallel matrix Large number of Sub Converters can fail without loss of output current, (50%). Cooling system in Fluorinert. Topology by JPL NASA, designed for NEPTUNE

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: the PEGASO ROV - DSS Cougar Seaeye ROV upgraded to 4000 m The ROV moves horizontally (200 m tether cable) The DSS holds ROV garage or heavy structures Cougar Seaeye ROV upgraded to 4000 m The ROV moves horizontally (200 m tether cable) The DSS holds ROV garage or heavy structures INGV 4000 m 30 Tons 200m 3500 m dive test at the end of 2009

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Summary The Catania Test Site at 2000 m depth is a ready-to-use infrastructure: electro-optical wet-mateable connections, through junction box (380 VAC – 3 kW) or directly from shore fully equipped shore lab connection to LNS-INFN The Capo Passero Site infrastructure at 3500 m depth is going to be completed this year: to be used within KM3NeT... ESONET / EMSO The PEGASO ROV – DSS will carry out deployment / connect ion / recovery operations of underwater structures, in deep sea sites, densely instrumented

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: Summary

All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN East-Sicily: MVC Alcatel