MoS Pilot Projects for the Black Sea and Caspian Sea Ministry of Economy and Sustainable Development of Georgia Transport Policy Department 20.05.2011.

Slides:



Advertisements
Similar presentations
1 Jacek Cukrowski Economic Development and Poverty Reduction Advisor, UNDP, Europe and the CIS Bratislava Regional Centre Aid for Trade (AfT) Needs Assessment.
Advertisements

Ministry of Enterprise, Energy and Communications Sweden European Union Strategy for the Baltic Sea Region- Action Plan 11. To improve internal and external.
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Polish Forwarding Company
INTERMODADRIA Supporting intermodal transport solutions in the Adriatic area Kick-Off Meeting 7-8 February 2013 MARCHE REGION ROAD SYSTEM AND STATE PROPERTY.
TEN-T R EVIEW AND “C ONNECTING E UROPE F ACILITY ” CPMR PROPOSALS LISBON 6 March 2012.
Logistics Processes and Motorways of the Sea II ENPI 2011/ This project is funded by the European Union A project implemented by Еgis International.
16 May, 2012, Ashgabat Improvement of transport infrastructure as a Key Issues of development of regional cooperation and transit Prospects of Transport.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Transport and Trade Linkages: Central Asia & Eastern Europe
NECL II in short  Budget: approx. 2,7 M€  Duration:  Partnership: 22 partners from Sweden, Norway and Finland - Leadpartner: County Administrative.
Alexio Picco, WiderMos Technical Manager
 «South Caucasus Railway» CJSC The perspectives of Armenia’s and South Caucasus Railway Integration into the Eurasian Transport System.
Logistics Processes and Motorways of the Sea II ENPI 2011/ This project is funded by the European Union A project implemented by Еgis International.
RAILWAYS IN TURKEY HACER UYARLAR Board Member of UTIKAD.
1 Transport sustainability and green corridors TransBaltic Project 1-2 February 2010, Gdańsk Prepared by: Urszula Kowalczyk, Marcin Burchacz Maritime Institute.
BALTIC COUNTRIES OVERVIEW
Use with Export Practice & Management Fifth Edition by Alan Branch ISBN 1–84480–081–4 © 2006 Alan Branch Chapter 3 Characteristics of international transport.
Integrating the Transsiberian Mainline into the European and global transport systems Gennady Bessonov Coordinating Council on Transsiberian Transportation.
TRACECA PROJECT EVALUATION
TRACECA PROJECT REPAIR AND REHABILITATION OF FERRY COMPLEX VARNA.
Short Sea Shipping 2012 The Role of Ports in Short Sea Shipping INTERNATIONAL CONFERENCE APRIL 2-3, 2012 ESTORIL-PORTUGAL.
Central Baltic Area in the EU Baltic Sea Strategy
1 Europe and CIS Jacek Cukrowski AfT Team Leader, UNDP, Europe and the CIS Bratislava Regional Centre AID FOR TRADE FOR CENTRAL ASIA, SOUTH CAUCASUS AND.
© International Road Transport Union (IRU) 2012 IRU Model Highway Initiative (MHI) TRACECA Investment Forum Brussels, 28 February 2012 TRACECA Investment.
ORGANIZATION OF THE BLACK SEA ECONOMIC COOPERATION 7 th IRU Euro-Asian Road Transport Conference, Ministerial Meeting and Co-ordination Meeting of International.
WP5.5. Railway solutions for the North-South and East-West flows Project Part-financed by the European Union Leszek Andrzejewski ILIM contribution WP5.5.
What is Smart Move?  Who are IRU?  Founded in Geneva in 1948  4 Regional Offices  170 Member Associations – 74 countries 
Trade Facilitation and Institutional Support A. Zwicky The European Union’s Tacis TRACECA program for Armenia, Azerbaijan, Bulgaria, Georgia, Kazakhstan,
TRACECA PROJECT «Development of the multi-modal complex in SE “SCPI” using the 3 rd basin of the Sukhoy estuary»
"State-Business Cooperation in the RK. Infrastructure Construction"
- Progress to date Transport Division, UNECE UNECE - UNESCAP 1 4 th EGM on Developing Euro-Asian Transport Links Thessaloniki November 2006.
Euro-Asian Transport Linkages Project Michalis P. Adamantiadis, Regional Adviser Transport Division, UNECE UNECE - UNESCAP.
THE NEW TRANS-EUROPEAN TRANSPORT NETWORK A CORE NETWORK: BLUEPRINT FOR 2030.
European Commission Directorate-General for Energy and Transport Unit G3 – Motorways of the Sea & Intermodality EURO-MEDITERRANEAN TRANSPORT FORUM MARITIME.
MULTI MODALISM CHAPTER 11. INTRODUCTION Multi-modalism / Combined Transport Operation: Process of operating a door-to-door/ warehouse-to-warehouse service.
Directorate-general for Energy and Transport European Commission June rd Expert Group Meeting Transport Euro-Asian Linkages Sanna Kuukka.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Intermodal transport between Europe and Asia: opportunities and challenges of Latvia.
Project # 1 Rikoti-Zestaponi Highway May, Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.
Building the Wider Black Sea Area Railway land bridge Providing frameworks for a seamless transport from Far East to Central and Eastern Europe Railway.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
Transit infrastructure development: EATL, TEM and TER Projects Artur Bouten Legal officer UNECE TIR secretariat.
“Challenges in Transport Corridors Infrastructure (Rail and Road) for the Southern African Region” Johny M. Smith CEO – WBCG November 2011.
Ministry of Transport, Maritime Affairs and Communications of the Republic of Turkey Intermodality leads to Sustainability A workshop for the Working Party.
DEVELOPMENT OF THE INTERMODAL TRANSPORT IN BSEC REGION CONNECTING THE BLACK, BALTIC AND CASPIAN SEAS.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
Conference organized by: Union for the Mediterranean High Level Conference on the financing of the future Trans-Mediterranean Transport Network (TMN-T)
Common Legal Basis for Transit Transportation The European Union ’ s Tacis TRACECA programme for Armenia, Azerbaijan, Bulgaria, Georgia, Kazakhstan, Kyrgyzstan,
1 Jacek Cukrowski Economic Development and Poverty Reduction Advisor, UNDP, Europe and the CIS Bratislava Regional Centre Aid for Trade (AfT) Needs Assessment.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
Key factors in the transport policy to encourage better integration Sixty-Third Session of UNECE, Geneva, 30th March 2009 "Economic Integration in the.
C4Freight. Freight Transport Corridors  Objective Demonstrate on key pan-European corridors innovative transport technologies, systems and strategies.
European Commission, Directorate General for Mobility and Transport (DG MOVE) Jose Anselmo – TEN-T Policy Officer Unit B2 – Coordination of TEN-T Priority.
Main Macroeconomic Data of Georgia GDP In 2014 GDP growth rate was 4.6% (Nominal GDP USD 16.5 bln.). GDP Structure: 17.5% - Trade, 16.9% - Industry, 10.4%
EuropeAid European Commission Joint meeting of the SSS and MoS focal points and Shortsea Promotion Centres Brussels – 19 March 2010 Extension of Motorways.
Advocacy Activity of the Eastern Partnership Territorial Cooperation Support Programme November 5, 2014 Tbilisi, Georgia Lyubov Palyvoda, Advocacy Expert.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Inter-Regional Trade and Transport Facilitation between Europe, Central Asia, South Asia and East Asia Graham Smith The World Bank, Beijing Office.
Portoroz, 26 September LOGISTICS - “Challenges of offer and demand in logistics” INTRODUCTION ECSA LOGISTICS AND MARITIME SERVICES IMPROVING THE.
1 MARITIME TRANSPORT WORKING GROUP Maritime Policy, Ports and Short-Sea Shipping MEDA Motorways of the Sea Sub-Group 4 th Meeting Brussels, 19 December.
Maria Magdalena GRIGORE TRACECA National Secretary –ROMANIA
Guidelines for transport in Europe and neighbouring regions
PORT BULGARIA WEST.
Studies for the Development of the RIS Operability along the Northern Italy Waterway System Studies for the Development of the RIS Operability along the.
Feasibility study on infrastructural interventions in Port of Split
Port Infrastructure Development for Ensuring Sustainability
Projects is financed By South Baltic Cross-border
European Commission High Level Group
Euro-Asian Transport Linkages Project
Presentation transcript:

MoS Pilot Projects for the Black Sea and Caspian Sea Ministry of Economy and Sustainable Development of Georgia Transport Policy Department Georgia, Tbilisi

 A Motorway of the Sea (MoS) is a door-to-door intermodal freight transport chain using a maritime segment with sea-land (rail, road and possibly inland waterway) connections and interfaces.  The aim of this project is to increase modal shift or cohesion by means of traffic concentration on sea-based routes in improving existing maritime links or establishing new viable, regular and frequent maritime links. Project history  The Project was launched in January 2009 with the objective to facilitate trade and transport along the corridor Europe – Black Sea Region – Caucasus – Central Asia (TRACECA).  More specifically, the Project is to promote the "Motorways of the Sea" concept. General Information MOS Pilot Projects of the Black Sea and the Caspian Sea 2

Four main outputs will have to be achieved within the project duration: 1. Extensive review and analysis of transport systems in beneficiary countries (“pre-MoS” conditions in beneficiary countries and in other Black Sea/ Regional countries) 2. Awareness rising to promote economic potential of intermodal logistics chain (case demonstrations, exchange of best practices, training) and related recommendations. 3. Short and Medium term Road Map: Pilot projects to be identified and selected with beneficiary countries : according to MoS standards and conditions based on transport policies and market requirements 4. Pre-feasibility or feasibility studies for selected projects: impact assessment (socio-economic, environmental, market benefits, obstacles, solutions, national and regional dimension) coordination with international financing institutions promotion/ communication Outputs of TRACECA MoS I Project/Extract from ToR MOS Pilot Projects of the Black Sea and the Caspian Sea 3

The main results expected in the framework of the project are the following: 1.Implementation of activities focusing on the maritime dimension of the Motorways of the Seas pilot projects selected under the previous contract Motorways of the Sea I; 2.Implementation of activities focusing on the hinterland dimension of the Motorways of the Seas pilot projects selected under the previous contract Motorways of the Sea; 3.Identification, selection and, if possible, implementation of the pilot projects that are not yet mature under the previous contract Motorways of the Seas I and of new pilot projects (not yet identified during the previous contract) 4.Attracting funding for the implementation of Motorways of the Sea Projects; The ToR of new TRACECA MoS II project MOS Pilot Projects of the Black Sea and the Caspian Sea 4

In the scope of the Motorways of the Sea for the Black Sea and the Caspian Sea the following Feasibility studies of Pilot projects were developed:  POTI – BAKU Container Block Train  VARNA – ILYICHEVSK – POTI  ILYICHEVSK-SAMSUN-POTI MoS Pilot Projects MOS Pilot Projects of the Black Sea and the Caspian Sea 5

Pilot-project key objective:  Interconnecting Black Sea and Caspian Sea with Block train service. In general, block trains are preferred to containerized conventional freight trains because of:  attractive tariffs  prompt delivery of goods from the original station to the destination station  safety  easy border crossing and customs procedures  environment–friendly transportation  high level communication system. Pilot Project POTI – BAKU Container Block Train MOS Pilot Projects of the Black Sea and the Caspian Sea 6

7

The relevant trades might be:  Any container potentially moving in transit along the Rail corridor via both ports of Poti and Baku  Loaded and empty containers carried between:  Eastern TRACECA: Azerbaijan, Kazakhstan, Turkmenistan, Uzbekistan, Tajikistan, Kyrgyzstan and beyond in the East  Western TRACECA: Georgia, Turkey; Ukraine, Moldova, Bulgaria, Romania, plus other European Countries (non TRACECA and CIS). The Poti-Baku block train project- linking the Black and Caspian Sea for container trade flows. MOS Pilot Projects of the Black Sea and the Caspian Sea 8

CountriesPartner CountriesEast boundWest bound GeorgiaKazakhstan19,415112,604 Traceca South East1,9785,233 AzerbaijanTraceca/ CIS811,41516,956 Traceca West33,2881,328 Turkey1,052,86339,592 Europe (non Traceca & Cis)335,51324,903 Traceca/CisKazakhstan1,007,4961,649,092 Traceca South East597,057113,366 Traceca WestKazakhstan18,79532,151 Traceca South East34,44121,984 Kazakhstan334,3381,416,343 Traceca South East609,708229,058 (non Traceca & Cis)Kazakhstan1,110,4222,550,681 Traceca South East635,567486,653 Total 6,602,2976,699,943 The Poti-Baku block train Pilot Project (Tons) MOS Pilot Projects of the Black Sea and the Caspian Sea 9

Georgia  Development of Poti as Deep Sea Container Port in the Black Sea  Improvement of railway services / modal shift from road to rail. Azerbaijan  Improvement of railway services.  Development of Baku International Sea Port (BISP) (also consistent with planned construction of / role assigned to new BISP at Alyat as Caspian Regional Hub).  Modal shift from road to rail. Consistency with national transport policies MOS Pilot Projects of the Black Sea and the Caspian Sea 10

Loaded TruckTons equiv.(*) Border Georgia-Azerbaijan Red Bridge46,240878,560 Lago dekhi5,297100,643 Total51,537979,203 Direct Bilateral trade Export1,27424,206 Import1,93936,841 Transit From/To Azerbaijan43,534827,146 Transit through and (to central Asia)4,79091,010 Total Transit48,324918,156 Road Truck Flow Georgia / Azerbaijan MOS Pilot Projects of the Black Sea and the Caspian Sea 11

Rail Container Flow Georgia / Azerbaijan Container (TEU)Tons equiv. (*) Transit From/To Poti to Azerbaijan4,09240,920 to Central Asia562.05,620 Transit From/To Batumi to Azerbaijan1, ,180 to Central Asia56560 Transit From/To Azerbaijan5,21052,100 Transit From/To Central Asia6186,180 Total Transit5,82858,280 MOS Pilot Projects of the Black Sea and the Caspian Sea 12

 Lack of fitting platforms for container transportation  100 fitting platform (with capacity of three TEU) for three block train is needed for the successful implementation of Container train project. The Cost of the one fitting: USD  Lack of LPG Tank container  100 of each or by combination for Georgian R/W, due to planned construction of LPG (LNG) terminals in Aktau port, Constansa and Batumi ports.  Today Georgia have capacity of 3000 MT storage in Batumi port (Terminal 1) The Cost of one 20 t LPG tank container is about USD Investment Needs MOS Pilot Projects of the Black Sea and the Caspian Sea 13

 Improvement and acceleration of awareness to develop trade with an interests of public and private participants of the project.  To increase the shipping quality and to reduce the delays of interconnected pilot projects of MOS and between the members of the central railway corridor of TRACECA. The Cost to purchase and develop the staff education and to provide program introduction is euro. The Exact budget will be determined according to the number of the equipment. ( The number of staff which will handle and keep equipment) MOS Pilot Projects of the Black Sea and the Caspian Sea Investment Needs 14

 Shifting Trucks from Road between Europe, Turkey and Caucasus;  Propose alternative short routes and replace auto transport on the roads between Europe/ west party of TRACECA, Turkey, Caucasus middle east;  Connect Black and Mediterranean Sea (Mersin & Iskenderun – Samsun rail & road connection);  (Odesa) - Ilychevsk – Samsun – Poti maritime Link ILYICHEVSK-SAMSUN-POTI General Objectives MOS Pilot Projects of the Black Sea and the Caspian Sea 15

MOS Pilot Projects of the Black Sea and the Caspian Sea 16

 Direct mutual shipping - Turkey, Ukraine, Georgia;  Direct regional shipping - TRACECA ( west part);  Transit shipping - in scopes of sea motorway routes Transport Service market / Technical aspects: Bulk cargo; Rail Ferries; Ro-Ro, Ro-pax; Containers; Viking Train. Target market and facilities MOS Pilot Projects of the Black Sea and the Caspian Sea 17

Volume in Tons East - North West AxePartner Countries WestboundEastbound Ukraine/Belarus/Moldova with: 1,649,0921,007,496 Traceca South East113,366597, ,6271,493,875 Total East - North West 1,886,0853,098,428 East - South West Axe Partner CountriesWestboundEastbound Turkey with: 1,416,343334,338 Traceca South East229,058609, ,1191,889,426 Total East -South West 1,989,5202,833,472 North - South Axe Partner CountriesSouthboundNorthbound Turkey with: Ukraine / Moldova / Belarus6,247,9061,404,889 Aggregated trade potential of Ilyichevsk – Samsun - Poti Pilot Project (Tons) MOS Pilot Projects of the Black Sea and the Caspian Sea 18

Key stakeholders and target groups: Institutions  Ministries of transport and relevant State organizations,  Port and Maritime Administrations,  Customs and Border Authorities Operators  Ports and terminals  Shipping companies / agents  Forwarding companies  Transport associations  Business communities (users) Stakeholders MOS Pilot Projects of the Black Sea and the Caspian Sea 19

Investments needed for:  Development of Infrastructure to be more competitive;  Satisfy Operators and Customers and ensure that the characteristics are appropriate of the MoS project; Types of needed Investments:  Rehabilitation of relevant Ports infrastructures and intermodal terminals;  Development or renewal of transport units and equipments;  Land Buildings: dry ports, container warehouse, related with logistic centers;  Information systems and decision - technical and program insurance;  Assistance in organization of appropriate studies. Investment Needs MOS Pilot Projects of the Black Sea and the Caspian Sea 20

Support by national stakeholders  Samsun Port administration;  UkrFerry;  Bulgar Sea Fleet. Approximately cost: Euro MOS Pilot Projects of the Black Sea and the Caspian Sea Investment Needs 21

 Improving rail / Ro-Ro / container intermodal transport on existing maritime services by:  Up-grading existing transport means and facilities;  Changing other existing technical conditions of transport, reducing vessel’s handling operations and increasing volumes; VARNA – ILYICHEVSK – POTI General objectives MOS Pilot Projects of the Black Sea and the Caspian Sea 22

MOS Pilot Projects of the Black Sea and the Caspian Sea 23

The Varna-Ilyichevsk-(Kerch)-Poti-Batumi pilot-project relates to goods carried:  in rail wagons,  in trucks/trailers,  in containers: lines and merchants (incl. last-voyage),  in break-bulk: packed or unpacked, including heavy lifts and rolling cargoes, new or secondhand cars and trucks.  It therefore encompasses a large range of trades and the wide geographical scope.  The customer base includes all the private and public export / import trading and industrial companies, as well as transport operators (rail, shipping) Existing Transport Service MOS Pilot Projects of the Black Sea and the Caspian Sea 24

CountriesPartner Countries Westbound/ SouthboundEastbound/ Northbound Bulgaria TRACECA/Cis North West (Ukraine, Belarus, Moldova)1,257,343111,810 Caucasus 28,84954,570 Kazakhstan 125,841 TRACECA South East12,8648,327 TRACECA/CIS North West Georgia / Armenia106,671682,460 Azerbaijan 16,956811,415 Kazakhstan 1,649,0921,007,496 TRACECA South East 113,366597,057 Europe (non-TRACECA/ CIS)Georgia / Armenia 282,808425,497 Azerbaijan 24,903335,513 Kazakhstan 2,550,6811,110,422 TRACECA South East 486,653635,567 Total 6,530,1985,785,975 Trade potential Varna – Ilyichevsk – Kerch - Poti Pilot Project (Tons) MOS Pilot Projects of the Black Sea and the Caspian Sea 25

 Ministries in charge of transport, customs;  Professional associations. Especially: Associations of Freight Forwarders in West TRACECA and Caucasus countries;  Port authorities / Terminal operators;  National state railway companies; Partners:  Ukr Ferry (Railferry private Ukrainian Shipping Company with status of National Carrier).  BMF (Railferry private Bulgarian Shipping Company). Stakeholders and Partners MOS Pilot Projects of the Black Sea and the Caspian Sea 26

The Varna-Ilyichevsk-(Kerch)-Poti-Batumi pilot project implies:  five (5) (container handling) toploaders (1 per vessel) are purchased and placed all at once on board of the vessels  In this respect it is suggested to consider “Mobicon Flexible Container Handling System”.  about rail wagons of 918 type owned by Georgian railways and/or Ukrzalisnytsia are modernized and put in operation at the rate of 10 units per month, Indicative cost of the project euro Investment Needs MOS Pilot Projects of the Black Sea and the Caspian Sea 27

 The possibility of creating a circular shipping container line on the Black Sea is in process, using the Lo-Lo vessel which may offer cheaper port disbursement costs than railferry and cheaper transportation costs as a result;  It is suggested to establish a Lo-Lo/pax circular container line on the following route:  Constanta-Ilyichevsk/Odessa-Poti/Batumi-Istanbul/Derinje; Possible framework of new TRACECA MoS II project MOS Pilot Projects of the Black Sea and the Caspian Sea 28

 The World Bank 2010 “Doing Business Report” upgraded the Country rank 45 to rank 11.  The Georgian Maritime Administration cooperates with a number of international organizations (IMO, BS MoU, NATO PBOS, BSPA, Istanbul Commission, IACS etc.)  Port Public Private partnerships were concluded in 2007 – 2008;  Legal instruments regulate trade transport. Legal Environment in Georgia MOS Pilot Projects of the Black Sea and the Caspian Sea 29

 The Presentation demonstrates the key features of the TRACECA MoS project makes clear for evaluators the basic information about the need of such new alternative routes and the chances to make real this project;  The project will support the efficient interoperability and further development of logistic processes between EU Countries, Caucasus and middle Asia countries;  The project will improve the trade relationships and multimodal transport system.  The Service in TRACECA corridor will be more competitive in which will have direct effects to trade and transport development in Black Sea and Caspian sea Region. Conclusion MOS Pilot Projects of the Black Sea and the Caspian Sea 30

Thank You for Attention MOS Pilot Projects of the Black Sea and the Caspian Sea31