LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
Past tenses Last year we began a study of airbags on our four wheel drive vehicles. First we analysed the results of the tests that we had carried out.
SUNY Canton Facilities Project Update Miscellaneous.
1 Light 1 C 70” Project Layout AFF. AFF is the abbreviation for 2 1.After first fire 2.Above finished floor 3.Above flat floor 4.At first floor 5.Average.
Example of a successful lining Description: Tuff Stuff is sprayed as a protective lining onto a boat hull. The lining with TS provides a high level of.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
FTTP Last Update Copyright Kenneth M. Chipps Ph.D. 1.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
University of Toronto Mississauga Campus Capital Projects University of Toronto Mississauga Campus: Capital Projects Erindale College Council | March 9,
The Evolution of the TERRA Crystal Galleries Mineral Showroom.
LBT Q Engineering Review MCSC Mount Control System.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
1 Direct burial cable, up to 24 individual fibers, reinforced.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Home Energy Saving Tips Save Money While You Help The Environment.
NA YETS: schedule week by week S. Evrard.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Save Money While You Help the Environment.  Lighting accounts for more than 10 percent of electric bill  Change to compact florescent lights (CFLs)
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Electrical Installation AMI- 17.0
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
NA62 CV activities Piero Valente 5 th September
LBT Q Engineering/Software Review ROTRotators.
Installing a Backflow Cage. Verify the Backflow and Area.
1 LBT Q Eng/SW Review PWR: Site electrical power.
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
Wired Transmission 24 Wired Transmission 24. Wired Transmission 24 This is about the method used to actually transmit or send data That means actual wires.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Filter Rehabilitation and Seismic Upgrades – Construction Update
Francois and Lau EATM 17 July 2012
CE Status: Activities executed until 03/08 and ongoing
Tagger Microscope Mounting, Shielding & Cooling
Pump House wall before installation.
CONTROL AND SERVICE TECHNOLOGY LTD
Detailed Contents Estimation Purpose of Estimating
Detailed Contents Estimation Purpose of Estimating
Organics Waste Processing Facility Construction Progress Update July 8, 2011
Minuteman Vocational Technical Regional High School Progress
Kalamazoo Yo Soy (I Am) Missionary Church.
Linac4 Connection Broken Line 07/08/19
19th July 2019 Finish the MU96 re-installation
Presentation transcript:

LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

2 Highlights (Q2/2007) Install 47 deg coolant to PEPSI bridge location Install 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge location Install clean dry air to PEPSI bridge location Schedule PEPSI team, Frank and Emil visit first of July 2007 Schedule PEPSI team, Frank and Emil visit first of July 2007

3 Open Issues Technical Technical Definition of power at connection point Definition of power at connection point Schedule Schedule Part scheduled Part scheduled Financial Financial Cost of paint and materials Cost of paint and materials Resource Resource Identify paint and paint contractor Identify paint and paint contractor

4 Progress (Q2/2007) Install 47 deg coolant to PEPSI bridge location Install 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge location Install clean dry air to PEPSI bridge location

5 Planning (Q3/2007) Terminate fibers Terminate fibers Define and install the connection point box Define and install the connection point box Install more services Install more services Move J box in pier up to 4 M, Q Move J box in pier up to 4 M, Q Move florescence lights in pier up to 4 M, Q Move florescence lights in pier up to 4 M, Q Installing energy chain/ cable chain Installing energy chain/ cable chain Installing AZ hole support structure Installing AZ hole support structure Installing gallery brackets Installing gallery brackets

6 Planning (before 2008) Install services Install services install E-net, install E-net, install E-stop install E-stop install telephone install telephone install power and conduit install power and conduit Insulate all pipe carrying liquids Insulate all pipe carrying liquids Epoxy paint entire floor Epoxy paint entire floor Paint walls with epoxy paint Paint walls with epoxy paint