Facilities Modernization Program Funded by Measure B Project Report October 20, 2014.

Slides:



Advertisements
Similar presentations
Facilities Modernization Program Funded by Measure B Project Report December 17, 2012.
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Cathedral of the Immaculate Conception Project Information Session.
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Bond Program Planning Imperatives Study Session October 12, 2004.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Update on FCPS Construction/Renovation Projects August 2009.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
State of Wyoming Capitol Upgrades and Renovation projects Photos of the skylight and lighting project will be shown in chronological order, followed by.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
HVACR116 – Trade Skills Mechanical Drawings.
Facilities Modernization Program Funded by Measure B Project Report September 16, 2013.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Facilities Modernization Program Funded by Measure B Project Report September 16, 2014.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
BERRY OFFICE REMODERNIZATION & SECURITY GATES UPDATE FEBRUARY 11, 2013.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
BRVFD & RS Training Facility Proposal 05/07/2009.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
FACILITY IMPROVEMENT PROGRAM SUMMER 2004 NEW CONSTRUCTION –Molecular and Computational Biology Building –Cognitive Imaging Center REMODELED LABORATORIES.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Facilities Focus Group
White Pigeon Community Schools
Capital Projects Requests
Forsyth County 2016 Bond Referendum
Bond and Override Report
Facilities Modernization Program
Facilities Report to the Buffalo State College Senate May 6, 2016
MIRACOSTA COMMUNITY COLLEGE DISTRICT
The summer of 2018 and all the work that has taken place
Facilities Modernization Program
College Council Meeting September 7, 2018
Facilities Projects Update
Carleton College Facilities Management
Capital Outlay Workshop
Recent Bond Accomplishments
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Facilities Modernization Program Funded by Measure B Project Report October 20, 2014

PROJECT PROGRESS REPORT Library Remodel Project Team: Architect: Noll & Tam Construction Manager: Parsons Brinckerhoff Contractor: WA Thomas Construction, Inc. Project Update: Construction Started August 4, Skylight in progress; Framing, Drywall, Mechanical, Data and Electrical Rough-in progress. Occupancy: Winter 2015 LAS POSITAS COLLEGE October 20, 2014

PROJECT PROGRESS REPORT Renovations – 100, 900, 1000, 1310/1320, 1700 Project Team: Architect: Charles Ham and Associates Construction Manager: Parsons Brinckerhoff Contractor: WA Thomas Construction, Inc. Project Update:.B1700 Framing & Drywall completed, Data, Electrical and Mechanical in Progress–Print Shop, Mail Room and Large Group Meeting Room B1310/20 Drywall, Data, Electrical, Mechanical, and Security in Progress, - Veterans Program B900 – temporary classroom- renovate – Deferred. B700– Swing space for Library during B2000 renovation completed May 14, B1000 will be demolished once vacant- Winter 2015 Occupancy: Winter 2014 LAS POSITAS COLLEGE October 20, 2014

Project Team: Architect: Carducci and Associates Construction Manager: Parsons Brinckerhoff Contractor: Integra Construction Project Update:.Concrete surfacing to replace existing grass and irrigation system. Construction Started October 6, 2014, Removal of grass in progress. Occupancy: Winter 2015 PROJECT PROGRESS REPORT Amphitheater Resurfacing Project LAS POSITAS COLLEGE October 20, 2014

PROJECT PROGRESS REPORT New B100 Academic Bldg Project LAS POSITAS COLLEGE October 20, 2014 Project Team: Architect: Lionakis- Bridging Architect Construction Manager: Parsons Brinckerhoff Contractor: Design/Builder Project Update:.Planning sessions underway General Site Plan Developed Bldg 200-Relocate to Temp Classroom, Bldg 300- Relocate to Bldg 700 Occupancy: FY 2018/2019

PROJECT PROGRESS REPORT New B100 Academic Schedule LAS POSITAS COLLEGE October 20, 2014

PROJECT PROGRESS REPORT Small Projects List LAS POSITAS COLLEGE October 20, 2014 Project No. Type of RequestLocationProjects/Description Point of ContactDivisionCommentsFunding 4Reno400 Renovate 400, Basic Skills English Center - Rplace carrels with Spectrum desks with computers, removewing walls in Rm 401A ALSSPO's issued, work to be done during winter break. 23Reno810Electrical Outlets- Welding Lab STEMPSWaiting on Proposal from Contractor 30Reno1850Replace Biology lab countertops throughout 1850 with heat resistant, chemical resistant, scratch resistant black countertops similar to the recent change made in 1807 with epoxy resin solid core countertops STEMPSContract issued; materials in fabrication; installation to be completed during Winter Break 26Equip2500Replacing desks and chairs in room PE 209 and PE 212 BSBAPO issued product in fabrication, install over Winter break 31Reno2500Removal of plants & rosemary inside pool area and concrete over it. BSBAWork in Progress 33Reno4000Sound Proof-FIX-elevator noise in room 4130 ALSSMet with End Users and Consultant to review draft report and recommendatations; PB processing Estimates 8Reno4130 / 4138Rooms 4130 and Dropped ceilings and/or acoustic discs (ceiling panels/circles) installed in MCA Rooms 4130 and 4138 *Extra acoustical treatment necessary from 4138 to 4226, downstairs to upstairs. ALSSMet with End Users and Consultant to review draft report and recommendatations; PB processing Estimates 9Space4000 OutsideStorage Shed - 9'x32' Shed for storage of flats, platforms and risers. ALSSTalked with Mike R and Justin, looking into container and requested area 12Equip4000Key pad locks and security cameras in Music Practice Rooms ALSSData Install Compeleted 9/12/14. Cameras installed per SG 43Reno1800Power wash and paint interior and exterior of the 1800 building including power wash of surrounding sidewalks. Note: protect for second floor leaks (see Carol Edson). STEMPSCompleted - Punch walk 8/18/14 39Reno1812Vent ammonia storage cabinet to outside of building STEMPSCompleted 44Reno , 1854, 1855, 1858 Instructor Desk add additional electrical quad receptacles to end near hoods (see Gire for specifics) STEMPSCompleted 38Reno2300Add Fence at the Child Development Center BSBACompleted 18Equip Purchase 25 passenger Van BSBACompleted 24Equip2300Tilt Zoom Cameras for three (of the 7) Child Development Center Classrooms BSBAcameras on site, IT install 1 camera for testing

Year 1 Grant– Total $581,000 (Chabot +LPC) –Roadway and Parking Lot LED Year 2 Grant- Total $459,000 (Chabot + LPC) –Campus walkway and exterior Building LED replacement PROJECT PROGRESS REPORT Proposition 39 Energy Grants LAS POSITAS COLLEGE October 20, 2014 Year 1- Project Complete- October 2014 Year 2- In Design, Estimated Completion March 2015