1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: 0.55+0.17 MHz/cm 2 (Front Tracker)

Slides:



Advertisements
Similar presentations
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
GEM chambers for SoLID Nilanga Liyanage University of Virginia
1 Tracking system based on GEM chambers Evaristo Cisbani Italian National Institute of Health and INFN Rome – Sanità Group PAVI – 09 / September.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Large area detectors Aida WP 9.2 RD51 WG6
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
TPC PAD Optimization Yukihiro Kato (Kinki Univ.) 1.Motivation 2.Simple Monte Carlo simulation 3.PAD response 4.PAD response for two tracks 5.Summary &
JLab 22/Jan/2010 SBS - Review E. Cisbani / SBS Trackers 1 Concepts and Status of the GEM trackers Evaristo Cisbani / INFN-Rome Sanità Group SBS - Review.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Goddard February 2003 R.Bellazzini - INFN Pisa A new X-Ray Polarimeter based on the photoelectric effect for Black Holes and Neutron Stars Astrophysics.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
INSTR L.Shekhtman 1 Triple-GEM detectors for KEDR tagging system V.M.Aulchenko, A.V.Bobrov,A.E.Bondar, L.I.Shekhtman, E.V.Usov, V.N.Zhilich,
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Trigger & Tracking detector for CMS
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Numerical simulations on single mask conical GEMs
Design and Status of the SBS Front tracker
Concepts and Status of the GEM trackers
SALTRO16 activities in Lund
A DLC μRWELL with 2-D Readout
Presentation transcript:

1 SBS Spectrometer / GEP5 Conf.

2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker) NOMHz/mm 2 High Resolution: <100  m (Front Tracker) Achievable 50  m30  m Large Area: 100 x 200 cm 2 (Polarimeter Tracker) YESDoable Very Expensive MPGD = Micro Pattern Gas Detector (GEM, Micromegas …) … and modular: reuse in different geometrical configuration

3 GEM for SBS Gain ~ 20^3 = 8000 Proposed Layout for SBS: Several chamber modules of 40x50 cm 2 each Standard 3 GEM foils 2D Readout plane, 0.4 mm pitch Last GEM HV layer segmented and read-out (0.5 mm pitch) Approx channels 2D Readout perpendicular (x,y) and/or +/- 30 degree (u,v) ? Second is certainly more demanding for the extraction of the strips

4 SBS Front Tracker Project BA: Gas system + Electronics (FE chips) CA: Mechanics + Test + MC + Slow Control GE: Electronics ISS/ROME: Prototyping, Test, Digitization + Reconstruction, Evaluate Si, Coordination few months delay

5 Prototyping 3 10x10 cm 2 chambers (one under test) Working on 40x50 cm 2 module, with minimum dead area in the frame (minimum frame thickness); main practical issues: –Each GEM foil has two HVs (one on each GEM side). Each GEM side must be segmented in order to suppress discharge spreading; each segment is connected to the HV power supply by a protection resistor –Gas in/out-lets in tiny frames (2-3 mm thickness) –Thousands readout strip extraction –Front-End electronics position and anchor

6 GEM HV sectors and resistors GEM requires 10x10 cm 2 sectors for HV distribution Use surface mounted HV resistors Distribute HV from two sides Gluing GEM foil on the frame may be a problem practical test in preparation! Red and Green are the 2 HV levels serving one GEM foils Resistors will be placed on the two sides

7 Electronics Front-End at 90° Electronics will be placed at 90° respect to the readout plane on 2 side of the frame. Some holes (bottom-left) will permit the passage (and protection) of the flat on the readout side. The width of the frame shall be as small as possible (working on 5 mm). Flex close to 90° bending, protected by the frame 2x2 chamber configuration Connector type is a constraint in possible 90° configurations +/-30° strips extraction an unsolved problem!

8 Clean Room Tools and Facilities HV single foil testing station Visual inspection back-light board Assembling the GEM chambers parts require a careful quality controlled procedure: inspecting  cleaning  testing(0)  stretching  gluing  heating  testing(1) Facilities available in clean room: Visual Inspection HV test Foil Cleaning Stretching, gluing and heating

9 Real Prototype 0 First 10x10 prototype under cosmic test Using 70/30 Ar/CO2 gas mixture 7 Independent HV levels up to about 4200 V Using temporary “Genova” electronics (PESA + ALTRO) from ALICE Bought about 620 APV25 analog chips for the final electronics (about channels)

10 HV Slow Control Use 7 HV independent levels to study the chamber performance HV management is not trivial! Keep noise at adequate level: use low pass filters on HV lines

11 “fake” prototype Testing solutions and alternatives on a fake 40x50 cm 2 GEM chamber with asymmetric frame (5 mm one 2 L sides, 5 cm on the opposite L sides). Gain experience on kapton gluing Test mechanics Optimize position of the resistors, gas pipes, readout fanout

12 Mechanical Analysis in progress Assumptions: –50 kV/cm felectrostatic field –GEM foil made of Kapton: Young module: 5.38*109 N/m 2 Poisson module 0.32 Shear module 0.35*109 N/m 2 Density1.4 g/cm3 –Fram in STESALITE Young module 244*109 N/m 2 Poisson module 0.29 Shear module (evaluated by the softwarE)

13 FEM of single GEM foil STESALITE frame of 40x50 cm 2, 5 mm width, 2 mm thick Deformation well below tolerance (5% of 2 mm) Limiting frame widths seems to be the HV paths, resistors and readout

14 Planned activities for the next few months Finalize the cosmic tests to characterize the prototyped telescope Finalize the design of the 40x50 GEM foil and readout, then order them Development of the electronics (Genova), based on COMPASS First July we have to apply for the 2010 INFN funding. It is fundamental to have a “reasonable” view of the future of the SBS project