Feedback of Scrap Convergence Plans

Slides:



Advertisements
Similar presentations
V4 + CROATIA & SLOVENIA EXPERT LEVEL CONFERENCE THE CLOSING EVENT OF THE HUNGARIAN V4 PRESIDENCY.
Advertisements

Quality Improvement Level Up Program December 17, 2008.
Enterprise Resource Planning, 1st Edition by Mary Sumner
January 6. January 7 January 8 January 9 January 10.
AICQ Seminar 15_05_2008 IRIS - International Railway Industry Standard The global Quality Standard for the Railway Industry Florence – 15 May 2008.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Brite Group An evolution in plastics BRIGHT BROTHERS LIMITED.
The 22 nd meeting of the INTOSAI Working Group on IT Audit (WGITA) KPI Project Final Report — Key Performance Indicators Methodology for Auditing IT Programs.
California LifeLine Program Update
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Template For Building Project Schedule Jazz Presentation.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
TSI Plastics, Inc.. o TSI Plastics has been servicing the Aerospace & Defense Industries since 1959 as a contract manufacturer of custom fabricated parts.
Scrap Convergence Plan Wuhan lens line #1 Update Feb 5 th Frédéric MORET Feb 5, 2007.
Sharing Best Practices PMMAI – 25 th July 2014 Ahmedabad.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
TOOL MANAGEMENT INTRODUCTION
Presentation of HanKing
Advancing Public Safety Through Technology Integration Advancing Public Safety Through Technology Integration National Model Scanning Tour May 7, 2003.
Change to Project Title
Software Quality Assurance Activities
Crispin Burridge.
Keshala De Silva. Administrator Contacts Dr Vivienne Curtis – IAT Programme Coordinator Dr Stephani Hatch – Research Methods Course Director Sarah-Jane.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth 1 Monitoring Investment Flows Calibrating Investment.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
New Hanover County 2017 Revaluation Update Roger Kelley Tax Administrator Tax Administration September 14, 2015.
STRAIGHTLINE Snowboards, Wakeboards, Kneeboards and Tow Lines n Fearon Brown n Monte Christensen n Fred Holubik MBA 518.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
MANUFACTURING VOCATS 7.O5. MANUFACTURING is A system or group of systems used in the manufacturing process to make products for an end user.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
1 North American Automotive Sector Public/Private Partnership The Commission for Environmental Cooperation has made a commitment to expand partnerships.
MONTHLY REPORT June 2009 IT DIVISION Tien Dang. 2 System Development Develop BCS (Business Core System). Develop B2E (Business to Employee). Develop B2C.
Workforce Development SEA Managed Process Job Skills & Cross Training Process Presented July, Phone: 1(203)
Ganda ERP Project | CFC ERP Project bi-weekly meeting (30/05/2014)
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
1 Total Productive Maintenance and Maintenance Management
PR50121_07 Retail Business Processes (RBP) Project Update Retail Market Subcommittee November 8, 2006 Adam D. Martinez Mgr, Market Operations DPO.
MANUFACTURING A system or group of systems used in the manufacturing process to make products for an end user ( STL pg. 239)
Giving Children a Smart Start NETWORK FOR SUSTAINED ELIMINATION OF IODINE DEFICIENCY 180 Elgin Street, Suite 1000, Ottawa, ON Canada K2P 2K3 T 1 (613)
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Available Review Cycles Tokyo to Vienna Assumptions: ExC Review limited to 5 days Specification submitted for QR by 11/2 Editing/Integration limited to.
SunSatFriThursWedTuesMon January
Policy and Procedures Ian S Burnett Student Research Culture Session – 29 April 2009.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
Progress on Implementation of the Comprehensive HIV and AIDS Plan February 2004.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Feb 06, 2009.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 22 nd of April, th Steering Committee.
Submitted by Name: Libin
GRG Polydynamics Pvt. Ltd.
Hub Management: Twelve Months of BEST
Scope & Milestone - Category/Supplier/Schedule -
Payment and Settlement System in Maldives
Total Productive Maintenance and Maintenance Management
TOTAL Productive MAINTENANCE
Presentation to Board of Trustees
XXX – Diagnostic – 1 (Abstract)
Submitted by Name: Libin
Energy Systems and Infrastructure Division
Setup Reduction -- Creating More Production Time Dr. Richard A
Engineering for Professional training
Xoserve IX Refresh Customer Update 03/01/2019.
L&V Manpower Development Prepared by: HR department Mar, 2013
Quick Response Quality Control QRQC
Six Sigma Green Belt.
Jaeliza Morales CUR/516 Dr. Mary Poe
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
CEOS Work Plan Progress Report
Presentation transcript:

Feedback of Scrap Convergence Plans Wuhan lens lines Frédéric MORET Qiang ZHOU Mar 30, 2007

Wuhan lens line #1 Targets From 55% to 20% from February 1st, 2007 Reduce average scrap rate: From 55% to 20% from February 1st, 2007 From 20% to 10% from April 1st, 2007 Achievement Operation by Wuhan team alone Convergence team in Wuhan (3 weeks) Convergence team in Wuhan (3 weeks) Monthly average 24% 16% Up to March 27

Wuhan lens line #1 Weekly results

Wuhan lens line #1 Scrap Convergence Plan Wuhan team + 8 people of Branch process team (spending in total 6 weeks in Wuhan) Step I: Analysis Step II: Quick savings by basic operation & maintenance improvements Organization and training of operation & maintenance teams Step III: Stabilization by design standardization of all tools (molding & coating) Organization & training of plastic engineering & process engineering teams I: Analysis II: Quick savings Scrap rate (%) III: Stabilization Before plan Achieved Target

Trainings Step II (January 2007) Step III (March 2007) Lens line jig design & manufacturing OJT Lens line jig tuning OJT Lens molding Cleanliness in lens line Jig management in lens line IRIS Inspection and logistics in lens line Step III (March 2007) Development of tools, jigs & fixtures for lens coating Lens molds: design & maintenance improvements TPM for lens coating line Injection screw & barrel cleaning OJT

Organization Branch team Wuhan team 7 people involved (8 in January) Period in Wuhan prolonged from March 23 to 30 for 2 people in order to complete some actions Wuhan team January 26th: APU manager nominated as Division Champion February 1st: New supervisor & coating process engineer nominated March 22nd: Transfer of jig & fixture development from industrial dep to APU March 22nd: Launch of Division industrial standardization committee Proposal for improvement of part development process

Part development Many issues because part design rules are not systematically applied Why? CIP part design process not systematically applied: Formal Design Reviews (DR) Completed check lists Participation of plastic engineering Expert & specialists to DR Improvement proposals Nomination of process Specialists Tooling (L. Ma), injection (C.Y. Hu), thermoset coating (Y. Yu), lens coating (Z. Jia), metallization (F. Tang), assembly (Y. Guan) Training schedule of process Specialists by Experts Semi-monthly PEN (Plastic Engineering Network) webinars Trainings by Experts in Wuhan Launch of a Division industrial standardization committee To build a database of Division industrial standards & related part design rules Formal approval of design by process Specialists during DR Formal & systematic participation of process Specialists and Expert (J. Ortiz) Systematic review of 3D drawing according to Branch & Division design rules Formal process design rule check list signed by PE + Expert

Status per product on March 30 DPCA R23: Running at 7% scrap rate on Saico line (demonstrated on last batch March 17- 19). DPCA T21: Running at 9% scrap rate on Saico line (demonstrated on last batch on March 12). Nissan X11J: Mold ready to run with a 2% scrap rate. Fine process tuning in progress on Eisenmann line. Clear action plan, signed by each person in charge, achievable by Wuhan team alone with its present resources to start production and achieve <10% scrap rate by April 20. DPCA T11 (product to localize): Ready to run on Saico line with a scrap rate < 10%. VW B6 (new product): Ready to run on Saico line with a scrap rate <15% (17% achieved during March 26 night shift), and clear action plan achievable by Wuhan team alone with its present resources to improve down to <10% scrap rate by April 30. DPCA B53 (product to localize): Clear action plan, signed by each person in charge, and achievable by Wuhan team alone with its present resources for mold improvement, in order it is ready to run on Eisenmann line with scrap rate < 10% by May 31. DPCA T53 (product to localize): Clear action plan, signed by each person in charge, achievable by Wuhan team alone with its present resources in order it is ready to run on Saico line with scrap rate <10% by May 31. DPCA T63 (product to start): Clear action plan, signed by each person in charge, achievable by Wuhan team alone with its present resources in order it is ready to meet all customer milestones on time until SOP on Eisenmann line in July, and to run with a scrap rate < 10% by July 31.

SOP of Eisenmann line Line started with Nissan X11J Molding Coating Equipement: Defect in screw detected during cleaning – Re-machined by supplier & back on April 4 Product & process: No issue in mold (is currently running with 2% scrap rate) Coating Equipment: Commissioning not totally completed, but line available for process tuning Product & process: Good lens position found, fine process tuning in progress (IR, UV & thicknesses) Target: Complete line ready for production on April 10 Support of Branch team after March 30 P. Vottero (maintenance) in Wuhan for advices regarding line commissioning and acceptance F. Kanazawa (process) in Bobigny for checking part quality (bring back by team & sent by express mail) and advices regarding process tuning Back-up plan If targets are not achieved from March 30, F. Kanazawa will come back to Wuhan