ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.

Slides:



Advertisements
Similar presentations
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Advertisements

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
Chapter 3 Project Initiation
1 Autodesk’s Manufacturing Solutions Kvalitetssikring i engineering processen Mads Storgaard.
ELM4701/02: ELM Projects I & II The mini-project has served as a practice project. It has given us the opportunity to explain our expectations and you.
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2007 Progress Reports Week 4 Day 1.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Project Management Session 7
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Systems Engineering Management
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
ENGR-11_Small_Volume_Design.pptx 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical.
CEN Fourth Lecture Introduction to Software Engineering (CEN-4010) Instructor: Masoud Sadjadi Project Organization.
Best Practices In Design Outcomes Of A Survey P. H. King, PhD, PE Joan Walker, PhD Vanderbilt University.
From Research Prototype to Production
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce.
ENGR-11_Engineering_Design_Cycle_Details.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
OVERALL ROBOT DESIGN, FTC STYLE PRESENTED BY: ANDY BAKER Sept
CREOCAD
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
Dr. Catherine Turner Assembly drawings.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
ENGR-22_Lec-23_Working_Drawings-2.ppt 1 Bruce Mayer, PE Engineering 22 – Engineering Design Graphics Bruce Mayer, PE Licensed.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
Project Title Pascack Hills High School Department of Technology Education STEM Concepts used to Design and Fabricate Inventions & Innovations Team Members:
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
Chapter 18 cont.. Sub Assemblies  Smaller assembly that is part of a larger assembly  Drawings for subassemblies are shown in their own assembly drawings.
GCSE Design and Technology: Product Design
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
ENGR-11_Small_Volume_Design.pptx 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
ENGR-11_Computer_Enclosure_DWG_Pkg.ppt 1 Bruce Mayer, PE Engineering-11: Engineering Design Bruce Mayer, PE Licensed Electrical.
Request for Proposal (RFP)
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
IFS310: Module 7 Business Requirements Statement Interpersonal Skills and Communications.
ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical.
Critical Design Review (CDR)
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
The Design Process.
ENGR-10_Lec-14_E11-Preview_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 10 – Introduction to Engineering Bruce.
Livingston High School
Personal Product Production Drawing. DESIGN ANALYSIS A "Design Analysis" is the document prepared by an engineering team that includes all of the information.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
ENGR-11_CrDR_Tank_MockUp.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical & Mechanical.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Lab Day – Controller Lab 1 Brief Follow-up from Wednesday Grading.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Objective: Develop hybrid biological semiconductors which are EMP resistant and whose electronic properties can be directly manipulated by environmental.
Introduction to New Product Development (Portfolio)
Software Requirements
Chapter 3 Managing the Information Systems Project
Monte Carlo vs. PERT Tutorial
Introduction to Software Engineering (CEN-4010)
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
Working Drawings Chapter 12.
Project Management Considerations
Team P16228: Magnetically Levitated Propeller
World’s Fastest Electric Vehicle
Assembly drawings Flóra Hajdu B406
PDT176 COMPUTER-AIDED DRAFTING CHAPTER 6 WORKING DRAWING
Presentation transcript:

ENGR-11_Tank_Agitator_Design_Project.ppt 1 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Registered Electrical & Mechanical Engineer Engineering 11 Tank Agitator Design Project

ENGR-11_Tank_Agitator_Design_Project.ppt 2 Bruce Mayer, PE Engineering 11 – Engineering Design Design Goal  Design a 24/7 “Wave-Like” Agitation System for a TidePool Culture Tank in a Marine Biology Lab

ENGR-11_Tank_Agitator_Design_Project.ppt 3 Bruce Mayer, PE Engineering 11 – Engineering Design Tide Pool As Food Source

ENGR-11_Tank_Agitator_Design_Project.ppt 4 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Must Run Unattended and Automatically 24 hrs/day, 7 days/wk 2.Power Sources Available 115 Vac, 15 Amp Electricity (1725 W) 100 psig, 5 cfm Compressed Air (1630W) 3.Gentle, Back-and- Forth Surface Agitation to Approximate Waves Breaking over an Exposed Tide Pool

ENGR-11_Tank_Agitator_Design_Project.ppt 5 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Wave Period = seconds 5.Tank Size in feet = 2W x 3L x 1D 6.Must Resist Sea Water Corrosion 7.Low Cost → $600 Budget 8.Must be Easy to Install and Uninstall (Biologists will use it) Tools Available Basic Mechanical, Plumbing, and Wiring Hand-Tools Hand Power Drill Reciprocating Saw (a.k.a. “SawzAll”)

ENGR-11_Tank_Agitator_Design_Project.ppt 6 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements FULL Set of CAD (AutoCAD or SolidWorks) Design and Fabrication Documents Fabrication Dwgs for Machined Parts –Material Callout and Finish –Full Dimensioning Assembly Drawing –Views and Basic Instructions for Assembly –Bill of Materials with Part Numbers Electrical/Pneumatic Schematics 10.Project Management Sources of Supply and Catalog No.s for purchased Parts

ENGR-11_Tank_Agitator_Design_Project.ppt 7 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Project Management cont. Projected Cost excluding Assy –Cost for Machine Parts from Chabot Machine Tool Technology Instructors A. Long & M. Absher –Purchase Parts from Supplier Catalog or Price-Quote 11.Design Analysis & Literature Research Pro’s & Cons of Alternative Designs Safe Operation – Mech. & Elect. Force Load Analysis (statics) Corrosion Resistance Possible Failure Modes (FMEA)

ENGR-11_Tank_Agitator_Design_Project.ppt 8 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements Extra Credit Milestone Schedule or PERT Chart GDT Dimensioning –Must be able to EXPLAIN it Written Assy & Test Procedures MockUp or Working-Prototype User Manual

ENGR-11_Tank_Agitator_Design_Project.ppt 9 Bruce Mayer, PE Engineering 11 – Engineering Design Design Requirements NiX “One Piece”, “Turn-Key” Systems The Design CONCEPT need not be Original, but the DETAIL Design MUST be so For Example, a student might Visit “Aquariums-R-Us” to get “Ideas” If the student were to find a “WaveMaker In a Box” (WIB), the Student Can NOT submit the WiB as the Design Solution The team can “Reverse Engineer” the WIB and produce BluePrints and a BoM needed build the WIB “Equivalent”

ENGR-11_Tank_Agitator_Design_Project.ppt 10 Bruce Mayer, PE Engineering 11 – Engineering Design NO “Out of Box” Designs

ENGR-11_Tank_Agitator_Design_Project.ppt 11 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentations  Assumes 4 Member Teams: M1 → M4  Presentations Last min Two Members Team Up for Presentation –Must Divide Presentation Approx. Equally  Formal Presentations (as would be given to Management or Customers) Done Using POWERPOINT Professional APPEARANCE (dress UP)  FollowUp → Write Action Item List WHO will do WHAT by WHEN

ENGR-11_Tank_Agitator_Design_Project.ppt 12 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentation  CDR  CONCEPTUAL Design Review (CDR) By Team Members M1 & M2 Describe Alternatives Considered –Why the Selected Alternative?  Identify Risks Concept Drawings and Sketches Likely Materials ROUGH (±15%) $-Cost Estimate Team Member Assignments → Division of Project Effort

ENGR-11_Tank_Agitator_Design_Project.ppt 13 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentation  CrDR  CRITICAL Design Review (CrDR) By Team Members M3 & M4 Detailed Layout and Schematics Engineering Physical Analyses –Force/Loading –Corrosion/Wear –Energy/Power Materials & Component Selection 95+% Accurate $-Cost Estimate

ENGR-11_Tank_Agitator_Design_Project.ppt 14 Bruce Mayer, PE Engineering 11 – Engineering Design Design Presentation  CrDR First-Cut Drawing Package –Parts, Assy, Schematic –Bill of Material With Part Numbers –Sources of Supply for Purchase Parts  Phone Numbers of Suppliers  Catalog Number for Purchase Parts FINAL Cost Estimate to ±5% Demonstrate (INSTALL on Tank MockUp) –Non-Working MockUp (Std extra credit) –Working ProtoType (High extra credit)

ENGR-11_Tank_Agitator_Design_Project.ppt 15 Bruce Mayer, PE Engineering 11 – Engineering Design AutoCAD Tank Template Template Posted to WebPage SeaWater_Tank_Template_E _BMayer_ DWG

ENGR-11_Tank_Agitator_Design_Project.ppt 16 Bruce Mayer, PE Engineering 11 – Engineering Design Labor & Materials Estimates  For Parts Designed by the STUDENT, the Part-Cost will NOT be published.  Instead the Designer must solicit from Fabricators ESTIMATES or QUOTATIONS for the Cost to Fabricate the Parts  Material-$ Estimates Find Materials Costs on the InterNet  Production Labor-$ Estimates Call Fab Shops See During Office Hours MTT instructors –Mr. Ashley Long –Mr. Mike Absher See B. Mayer –Last Resort

ENGR-11_Tank_Agitator_Design_Project.ppt 17 Bruce Mayer, PE Engineering 11 – Engineering Design Design Resources  Good Component Catalogs McMaster-Carr (the best) Grainger (Motion Generators – motors) Omega Engineering (Sensors) Newark Electronics (Electrical Elements) PIC Design (Mechanical Elements) Cajon/SwageLok (plumbing & valves) Bimba (Motion Generators – Pneumatic Linear Actuators)

ENGR-11_Tank_Agitator_Design_Project.ppt 18 Bruce Mayer, PE Engineering 11 – Engineering Design Grainer Branch in Hayward  Google “Grainger”

ENGR-11_Tank_Agitator_Design_Project.ppt 19 Bruce Mayer, PE Engineering 11 – Engineering Design Example Schedule ItemStartFinishTask/MileStone Description 1Wk-01Wk-02UnderStand Functional Requirements 2Wk-02Wk-03Form Team 3Wk-02Wk-04BrainStorm Solutions, Select 2-3 for Feasibility Assessment 4Wk-04Wk-05Concept Feasibility Analysis (Pros & Cons); Select Best Concept 5Wk-05Wk-06Select Source-of-Motion; Finalize: Agitator Concept, Mtg to Tank 6Wk-06Wk-08Make AutoCAD Layout, Find Supplier for Source-of-Motion 7Wk-07Wk-08Prep for CONCEPTUAL Design Review – Ref. CDR ScoreSheet 8Wk-08 CONCEPTUAL DESIGN REVIEW (CDR) PowerPoint Presentation 9Wk-09 Iterate on Design based on CDR “Post Portem” Review 10Wk-10Wk-12Design Control System, Find Supplier for Control-Sys Components 11Wk-10Wk-14Detail-Design and Formal ACAD dwgs for “Piece Parts” 12Wk-10Wk-14Research Suppliers and Select Purchased-Parts; Need Cat. No.s 13Wk-12Wk-15Construct Accurate and Complete Bills of Material 14Wk-12Wk-15Determine Manufacturing Methods, Collect Cost Data 15Wk-12Wk-15Detail-Design and Formal ACAD dwgs for SubAssys & FinalAssy 16Wk-15Wk-16Prep for CRITICAL Design Review – Ref. CrDR ScoreSheet 17Wk-17 CRITICAL DESIGN REVIEW (CDR) PowerPoint Presentation xtraWk-10Wk-17Build, Assemble, Test, and Demonstrate ProtoType HardWare

ENGR-11_Tank_Agitator_Design_Project.ppt 20 Bruce Mayer, PE Engineering 11 – Engineering Design Weekly Reports  Each TEAM will submit a Weekly Report (WkRpt) on the Dates Listed in the Course Schedule Suggest Team Members Alternate Writing the Reports  Report Form & Example on Webpage Chabot_Engineering_Weekly_Report_Tem plate_0906.doc Chabot_Engineering_Weekly_Report_Tem plate_and_Instructions_1209.docx

ENGR-11_Tank_Agitator_Design_Project.ppt 21 Bruce Mayer, PE Engineering 11 – Engineering Design Weekly Reports  Report Length → 1-2 pages Appendices NOT included  Report Content Two Required §’s → –Previous Week Accomplishments –Plans for Next Week Optional § → Appendix (or Appendices)  Example Posted on WebPage Weekly_Report_Example_BMayer...doc

ENGR-11_Tank_Agitator_Design_Project.ppt 22 Bruce Mayer, PE Engineering 11 – Engineering Design Design Project “Deliverables” No.DescriptionTemplate or ExampleNotes and/or Comments 01 Fabricated-Part AutoCAD Drawings Chabot_TitleBlock_D_BMayer_ DWG DWGs 96755[3-8] 41 in CaseStudy PPT-file BoM is ONE item; the Primary Material of construction 02 SUBassembly AutoCAD Drawings (if Used) Chabot_TitleBlock_D_BMayer_ DWG DWG in CaseStudy PPT-file BoM is multiple parts; can be either ON-DWG or Separate document 03 FINAL Assembly AutoCAD Drawing(s) Chabot_TitleBlock_D_BMayer_ DWG DWG in CaseStudy PPT-file BoM MUST be a Separate document 04 Electrical and/or Plumbing Schematic Drawing(s) Chabot_TitleBlock_D_BMayer_ DWG DWG in CaseStudy PPT-file Listed on Final Assembly BoM as a REFERENCE Items 05 SUBassembly Bill(s) of Material (if Used) BoM_PartsList_Template_BMayer_0906.xls _BoM_Drive_Cage_Assy_BMayer_1002.xls Use Columns A-D in BoM Template 06 FINAL Assembly Bill(s) of Material (if Used) BoM_PartsList_Template_BMayer_0906.xls _BoM_PartsList_Example_BMayer_0906.xls FINAL assembly BoM MUST be done in spreadsheet form Use Columns A-D in BoM Template 07ESTIMATED CostBoM_PartsList_Template_BMayer_0906.xlsSum Column-F in the BoM Template 08 Purchased-Part and Supplier Log Engineering_Design_Purchase_Part_Log_ Example_BMayer_0906.xls Students to DESIGN Purchased- Part Numbering system 09AutoCAD Drawing Log Chabot_Engineering_Drawing_Log_ Example_BMayer_0906.xls Students to DESIGN Drawing Numbering system

ENGR-11_Tank_Agitator_Design_Project.ppt 23 Bruce Mayer, PE Engineering 11 – Engineering Design Bruce Mayer, PE Licensed Electrical & Mechanical Engineer Engineering 11 Appendix MileStone Schedules

ENGR-11_Tank_Agitator_Design_Project.ppt 24 Bruce Mayer, PE Engineering 11 – Engineering Design Design Reviews  Functional Requirements Review (FRR). The purpose of the FRR is to review the functional requirements specification document, to ensure the documented requirements reflect the current knowledge of the customer and market requirements, to identify requirements that may not be consistent with product development constraints, and to put the requirements document under version control to serve as a stable baseline for continued new product development.  Conceptual Design Review (CDR). The purpose of the CDR is to review the conceptual design to ensure that the planned technical approach will meet the requirements.  Critical Design Review (CrDR). The purpose of the CrDR is to review the detailed design to ensure that the design implementation has met the requirements  Final Design Review (FDR). The purpose of the FDR is to ensure that the design is completely and accurately documented and ready for formal release to manufacturing.

ENGR-11_Tank_Agitator_Design_Project.ppt 25 Bruce Mayer, PE Engineering 11 – Engineering Design GS 3 Visit – Dec00 Mr. W. A.B. Mayer PC030053aThe S2 investigators pose in front of their subject at the conclusion of the inspection. Mr. W. A. on Left. Bruce Mayer on right. Circa Dec00.

ENGR-11_Tank_Agitator_Design_Project.ppt 26 Bruce Mayer, PE Engineering 11 – Engineering Design S2 Team Inspect Primary Power Box (PPB) Mr. Y. K. Mr. I. A. Mr. A. N. Mr. Y. N. Mr. H. T.

ENGR-11_Tank_Agitator_Design_Project.ppt 27 Bruce Mayer, PE Engineering 11 – Engineering Design Full S2/S8/CE Compliance – Detailed Schedule Ref. BMayer file 3100_S2S8CE_0109.mpp

ENGR-11_Tank_Agitator_Design_Project.ppt 28 Bruce Mayer, PE Engineering 11 – Engineering Design Full S2/S8/CE Compliance – Detailed Schedule

ENGR-11_Tank_Agitator_Design_Project.ppt 29 Bruce Mayer, PE Engineering 11 – Engineering Design OpenProject → Free “Msproj”

ENGR-11_Tank_Agitator_Design_Project.ppt 30 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-System: Pre Shipment Testing

ENGR-11_Tank_Agitator_Design_Project.ppt 31 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-Site Schedule

ENGR-11_Tank_Agitator_Design_Project.ppt 32 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-Site Schedule

ENGR-11_Tank_Agitator_Design_Project.ppt 33 Bruce Mayer, PE Engineering 11 – Engineering Design 2100 ß-Site Schedule ON-Semi_2100_0109_DWG.mpp