Based on the book: Managing Business Process Flows.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Process Analysis and Applications Module
Throughput Throughput, Utilization, Bottleneck, Effective Capacity, Theoretical Capacity, and Capacity Leverages. November 11, 2011 Ardavan Asef-Vaziri.
Flow Rate and Capacity Analysis
CAPACITY LOAD OUTPUT.
Slide 1Time and Throughput Management & Improvement© Van Mieghem Bottleneck Management and Improvement  Time and Throughput: –Critical Path vs. Bottleneck.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Lin/Operations/Process Analysis & Apps1 Process Analysis and Applications Module u Operational Measures: Time T, Inventory I, Throughput rate R »Link to.
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
Assignment Capacity.
4. Flow-Time Analysis Flow Time 3-Flow Time Reduction Levers Based on the book: Managing Business Process Flows.
Just-In-Time and Lean Systems
1 4. Flow-Time Analysis Inventory adversely affects all competing edges (P/Q/V/D)  Has cost  Physical carrying costs  Financial costs  Causes obsolescence.
OM&PM/Class 2b1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2 Process Analysis –Class 2a + 2b: Process Flow.
Based on the book: Managing Business Process Flows.
MANAGING DEMAND AND CAPACITY Donna J. Hill, Ph.D. Fall 2000.
IV. Little’s Law and Labor Costs
Process Analysis and Applications Module
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Flow Rate and Capacity Analysis
For Products and Services
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines3  Terminology: The characteristics of a queuing system is captured by five parameters:
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
OPERATIONS MANAGEMENT OPRE 6260 Raymond Lutz. Products, Processes, and Performance - Chapter 1 Learning Objectives An operation as a transformation process.
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Operations Managment Kristen’s Cookie - Lecture 4 (Chapters 4 and 5)
OPSM 301: Operations Management
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Chapter 3 Supply Chain Drivers and Obstacles
JIT and Lean Operations
Introduction to lean philosophy
Throughput Part 2 Effective Capacity & Utilization Based on the book: Managing Business Process Flows.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
Managing Processes and Capabilities CHAPTER THREE.
OPSM 405 Service Operations Management
© 2007 Pearson Education 7- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 7 Internal & External Process Simplification 09/25.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
“Without the Cost of Waste …”
OPSM 301 Operations Management Class 5: Business process flows: Analysis Koç University Zeynep Aksin
Flow Rate and Capacity Analysis
1 Ardavan Asef-Vaziri Feb-2013Capacity- Basics Capacity  Case: Scharfen Berger Chocolate Maker  Throughput (Average Flow Rate): Average # of flow units.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Assignment Capacity. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics MamossaAssaf Inc. fabricates garage doors. Roofs are punched in a roof punching.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Operations Management JIT & Lean Systems
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
MANAGING DEMAND AND CAPACITY Chapter 15. Objectives Explain the underlying issue for capacity-constrained services: lack of inventory capability Present.
Key Learnings: Little’s Law
Lean operations and JIT
Chapter 3 Supply Chain Drivers and Obstacles
Inputs and Outputs to Aggregate Production Planning
Analytical Tools for Process Analysis and Improvement
Synchronous Manufacturing
Chapter 3 Supply Chain Drivers and Obstacles
Just-In-Time and Lean Production
Cost Resource-Activity match High Utilization (Low Safety Capacity)
Chapter 3 Supply Chain Drivers and Metrics
Throughput Key Problems
Chapter 3 Supply Chain Drivers and Obstacles
Assignment Capacity The recorded solution to the first problem is available at
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

Based on the book: Managing Business Process Flows. Throughput Part 2b Effective Capacity & Throughput Leverages Based on the book: Managing Business Process Flows.

A Second Example on Throughput Part 2a A law firm handles several types of insurance policies. The theoretical unit loads for an aggregate policy (representing the combination of all policies) are as follows: 4 hours of Resource 1, 3 hours of Resource 2, and 2 hours of Resource 3. Capacity waste factor for resources 1 to 3 is 0.3, 0.1, and 0.3, respectively. Utilization of the bottleneck resource is 0.8. There are 8 working hours per day. Compute the VERY theoretical flow time for an aggregate product. 4+3+2 = 9 hours 2. Compute the theoretical flow time for an aggregate product. 4/(1-0.3) + 3/(1-0.1) +2/(1-0.3) = 4/0.7+3/0.9+2/0.7 = 5.71+3.33+ 2.86 = 11.9 What is the average CWF 11.9(1-CWF) = 9  11.9-0 = 11.9CWF  CWF = 0.24

A Second Example on Throughput Part 2a 3. Compute the daily theoretical capacity of the process. Min(1/4,1/3,1/2) = 1/4 per hour 8(1/4) = 2 per day 4. Compute the daily capacity of the process. Min(1/5.71,1/3.33,1/2.86) = Min(0.175, 0.3, 0.35) = 0.175 /hr Min[1/(4/0.7),1/(3/0.9), 1/(2/0.7)]=Min(0.7/4,0.9/3,0.7/2) = 0.175 /hr or 8(0.175)= 1.4 per day 5. Compute the cycle time. 1/1.4 = 0.7143 day or 8(0.7143) = 5.71 hour OR 1/0.175 = 5.71 hour OR 1/(1/5.71) = 5.71 hour 6. Compute the throughput per day. Capacity = 1.4 per day U=0.8

A Second Example on Throughput Part 2a U = Throughput/Capacity 0.8 = R/1.4 Throughput = 1.12 per day 7. Compute the takt time. 1/1.12 = 0.893 day OR 8(0.893) = 7.14 hours 8. Compute the utilization of the most utilized resource. The problem has already said that the utilization of the process is 0.8. That is the utilization of the most utilized resource. That is utilization of the bottleneck. 9. Compute the utilization of the least utilized resource. The three resources have capacity of 0.175, 0.3, 0.35 per hour OR 1.4, 2.4, 2.8 per day.

A Second Example on Throughput Part 2a Throughput is 1.12 per day. U1 = 1.12/ 1.4 =0.8 U2 = 1.12/ 2.4 =0.47 U3 = 1.12/2.8 = 0.4 10. On average how many flow units are with the resources (in the processors) There are three resources with U1 = 0.8, U2=0.47 , U3 = 0.4 0.8+0.47+0.4 = 1.67 11. Suppose the number of flow units in all the waiting lines are 10 units. Compute the flow time. (A day is 8 hours.) R = 1.12 per day I = 1.67+10 = 11.67 RT = I  1.12T = 11.67  T = 11.67/1.12 = 10.42

Throughput Improvement Mapping Throughput ≤ Effective Capacity ≤ Theoretical Capacity Throughput << Capacity – External Bottleneck External blockage (demand) - ↑sales efforts, ↑ advertising budget, ……. Make them an offer they can’t refuse. ↓prices, ↑quality, ↓time ↑variety. External starvation (supply) - identifying additional suppliers, more reliable suppliers. Throughput = Capacity – Internal Bottleneck Increase financial capacity - modifying the product mix. Increase physical capacity - ↑ c ↓ Tp if Capacity ≈ Theoretical Capacity If Capacity << Theoretical Capacity.

Reducing Resource Capacity Waste ↓ Tp Capacity << Theoretical Capacity  resources are not utilized effectively; eliminate of waste; ↓ Tp or ↑ Net Availability. Eliminate non-value-adding activities. Avoid defects, rework and repetitions – These two are exactly the same as what was stated for flow time reduction. For flow time we focus on activities along the critical path. For flow rate we focus on activities performed by bottleneck resources. Increase Net Availability – Reduce breakdown and work stoppage by improved maintenance policies and effective problem-solving, to reduce the frequency and duration of breakdowns and maintenance outside of working hours. Reduce absenteeism.

Reducing Resource Capacity Waste Reduce setup time – setup time per unit is Sp/Qp. Decrease the frequency of changeovers, reduce the time required for each setup and manage the product mix to decrease changeover time from one product to the next. Move some of the work to non-bottleneck resources – This may require greater flexibility on the part of non-bottleneck resources as well as financial investments in tooling and cross-training. Reduce interference waste – Eliminate starvation and blockage among work-stations. Methods improvement. Training. Management.

Increasing Resource Levels ↑ c Capacity ≈ Theoretical Capacity  Resources are efficiently utilized; increase the theoretical capacity. Increase the level of resources. ↑ c. buy one more oven Increase the size of resource units - Larger load batch - more loaves in the oven Increase the time of operation – ↑ Scheduled Availability, Overtime Subcontract or Outsource Technology- Speed up the activities rate - Invest in faster resources or incentives for workers.

Setup Batch and Total Unit Load Setup or Changeover: activities related to cleaning, resetting and retooling of equipment in order to process a different product. Qp : Setup batch or lot size; the number of units processed consecutively after a setup; Sp : Average time to set up a resource at resource pool p for a particular product Average setup time per unit is then Sp/Qp Sp/Qp is also included in Tp Setup batch (also lot size): number of units processed consecutively after a setup EXAMPLE: painting cars->how many cars before you change paint color

Setup Batch Size: Throughput or Flow Time What is the “right” lot size or the size of the set up batch? Lot Size  or  ? The higher the lot size, the lower the unit load and thus the higher the capacity. The higher the lot size, the higher the inventory and therefore the higher the flow time. Reducing the size of the setup batch is one of the most effective ways to reduce the waiting part of the flow time. Load batch: the number of units processed simultaneously. Often constrained by technological capabilities of the resource. Setup batch: the number of units processed consecutively after a setup. Setup is determined managerially. Setup batch (also lot size): number of units processed consecutively after a setup EXAMPLE: painting cars->how many cars before you change paint color

Throughput or Flow Time Product Mix: 50%-50% Set-up time 30 min per product Working hours 8 hours/day 10 min/unit A Operation B 20 min/unit 1 machine 100% available Compute the effective capacity under min cost strategy. Two set-ups each for 30 min = 60 mins An aggregate product takes (10+20)/2 = 15 Production time = 8*60-60 = 420 mins Capacity = 420/15 = 28 aggregate units Each aggregate unit is 0.5 A and 0.5 B (total of 14A and 14B)

Throughput & Cost or Flow Time Compute the capacity under min flow time strategy. In a minimum inventory strategy, we produce two product at a time then switch to the other. 10 min/unit A Operation B 20 min/unit 1 machine 100% available Product A: 2(10)0+30 = 50 Product B: 2*(20)+30 = 70 An aggregate product takes (50+70)/2/2 = 30 = 0.5 hour Capacity = 8/0.5 = 16 aggregate units per day. Each aggregate unit is 0.5 A and 0.5 B (total of 8A and 8B) 8A and 8B need 4*30*2 = 4 hrs Setup + 8*10+8*20 = 4 hrs Production,