Page 2. Page 2 Data from (6) Month Review Strategic Planning Purpose: to define and deploy the most important strategic priorities to drive performance.

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Software Quality Assurance Plan
Environmental Management System (EMS)
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
How to Document A Business Management System
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Management System
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Quality Assurance/Quality Control Policy
Management Responsibility Procedure Tutorial. Introduction to Management Responsibility In this presentation we will discuss how to write a procedure.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
Quality Representative Training Version
4. Quality Management System (QMS)
ISO 9000 Implementation Imran Hussain.
NON-UNIT EMPLOYEE EVALUATION PROCESS
Product and Process Measures Drive Continuous Product Quality and Business Improvement Angelo G. Scangas, President Quality Support Group, Inc
4. Quality Management System (QMS)
NVLAP Overview and Accreditation Process March 2006.
Core Performance Measures FY 2005
Chart Your Course to Business Success On Target Business Intensive: Session 7 May 8, 2012 Advisors On Target 1.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
On Target Contractor’s Blueprint Chart Your Course to Business Success On Target Business Intensive: Session 8 November 14, 2013 Advisors On Target 1.
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
Visit us at E mail: Tele:
© EAGLE Registrations Inc CONFIDENTIAL 1 Experience Speaks of Lessons Learned ASQ Illiana February 15, 2011.
ISO9001 Pre Assessment Team 10 PT Han Jian Da, Alphy Thomas Kanatt, Xia Xi, Wu Jun, May Lwin, Chit Khun, Mohit Srivastava, Kovalan Venkatesan.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
March 12, About MPC Industries  Flat sheet polishing  Formed Parts polishing  Grinding, Sheet & Plate Backed by over 40 years experience and.
Version Advanced User Training. Instructions This training module contains additional key concepts that are an extension to the concepts in the.
Strategic Planning Process
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
1  Established in 1964  Located in Escondido, Ca Company Vision: To be the most dependable, diversified and efficient job shop, dedicated to unbeatable.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
TTI Performance Evaluation Training. Agenda F Brief Introduction of Performance Management Model F TTI Annual Performance Review Online Module.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
Presented by: Kelly Conrad March 21, 2011.
Graco Supply & Integrated Services Strategic Planning January 9th, 2012 Tim Holland, CEO/President Aman Sangha, Business Analyst/CI.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Table 1. The Five Medical Laboratory Case Studies Jan Martin et al. Transnational Evaluation of a New Continuing Professional Development Activity for.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
UNDERSTANDING ISO 9001:2008.
Training Documentation – Replacing GSPR with RFQ 2.0
ISO/IEC
Field Inventory Services-Sanofi Inventory and Audit Training
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Quality Management Systems – Requirements
ISO 9001 Awareness Training.
CDRL E003 CFAT REPORT TEMPLATE
UNDERSTANDING FOR STANDARD
Operationalizing Export Certification and Regionalization Programmes
AS 9100 Awareness Training.
TRAIN ADVENTURE ANALOGY
Company X Process Mapping Training
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Radiopharmaceutical Production
How to Conduct Effectively
Presentation transcript:

Page 2

Data from (6) Month Review 1.1.1 Strategic Planning Purpose: to define and deploy the most important strategic priorities to drive performance improvement. STRATEGIC PLANNING Data from (6) Month Review Preparation SWOT Planning Session Deployment Meetings 1.1.2- Leadership Communication (Lisa) 1.1.3- Organization Performance (Chuck) 1.1.4- Continuous Improvement (Anthony) 1.1.5- Workforce Development (Kelly) PAC 13 assignments Financial Analysis Operations Analysis Technology Analysis Customer and Markets Analysis Competitive Analysis Standards – AS9100, NADCAP and SEA/LES SWOT Completion From- Customers, Suppliers, and Employee Skills Assessment Customer Interviews/Surveys Employee Interviews/Surveys Supplier Interviews/Surveys SWOT and Business Annual Report Vision Review Mission Review Targets & Objectives Value Stream Mapping (if needed) Review Champions Review Process Owners Review Process Maturity Employee Meetings (4) Supplier Meetings (if needed) Customer Meetings Department and Individual Goals (if needed) Action Plans Recognition Communication (6) Month Review of revised or new “Strategic Planning” Goals, Targets and Objectives. Please read and keep these questions in mind as you complete the attached SPW worksheets. 1.1.1 Strategic Planning Process – How does your organization accomplish its strategic planning? What are the key process steps and who are the participants? How do you ensure that the process addresses strengths, weaknesses, opportunities, and threats; major shifts in technology, markets, and competition? How are standards such as AS9100 integrated into the planning process? What are your key strategic goals and timetables? Page 3

Page 4

1.1.1 Strategic Planning- Preparation Preparation will encompass the following information gathering- Financial Analysis Report from the CFO Operations Analysis Report from the COO Technology Analysis Report from the General Manager (are we a “Front Runner”) Competitive Analysis Report (based on surveys below) Review of Standards (QAM)- AS9100 Rev. C NADCAP Specifications for Special Processes SEA/LES Surveys used for information gathering- Customer Interview/Survey (see page 6) This Survey should be sent to customers within the top 5% of the customer base and repeated among selected customers to develop better business trends. Supplier Interview/Survey (see page 7) This Survey should be sent to suppliers within the top 5% of the supplier base and repeated among selected suppliers to develop better business trends. Employee Feedback Forms (see page 8) This Survey should be taken from a random sample of 8 to 10 employees involved in the day to day operation of the company. Leadership Processes Self-Assessment Survey (see page 9) Self-Assessment Survey is to be completed by all members of the Lean Management Team and/or Process Owners. PAC 13 assignments Financial Analysis Operations Analysis Technology Analysis Customer and Markets Analysis Competitive Analysis Standards – AS9100, NADCAP and SEA/LES Page 5

Customer Interview/Survey Customer/Company Name: Date: Customer Contact:   Title: In our continuing efforts to improve our quality system, we would ask you to complete this Customer Survey Form and return it to us within one work week of receipt. Your input will assist us significantly in further improving our product quality and responsiveness to your requirements. PLEASE SELECT THE APPROPRIATE NUMBER, WITH "5" INDICATING "VERY PLEASED" AND "1" INDICATING "VERY DISPLEASED". 1 2 3 4 5 OVERALL QUALITY OF PRODUCT ORDERED OVERALL QUALITY OF PACKING, PACKAGING AND PRESERVATION ON-TIME DELIVERY DOCUMENTATION PROVIDED RESPONSIVENESS TO SHIPPING SCHEDULES AND CHANGES 6 PRICING 7 INVOICING 8 COURTESY OF OUR PERSONNEL 9 RESPONSIVENESS OF OUR REQUEST FOR QUOTES 10 RESPONSIVENESS OF OUR PERSONNEL TO COMPLAINTS WE WOULD WELCOME ANY COMMENTS/SUGGESTIONS OR IMPROVEMENTS YOU WOULD CARE TO MAKE ELABORATING ON ANY OF THE SURVEY ITEMS LISTED ABOVE OR ANY TOPIC YOU FEEL WE HAVE OMITTED. COMMENTS: NAME TITLE DATE THANK YOU IN ADVANCE FOR TAKING TIME TO COMPLETE THIS SURVEY. THIS WILL ASSIST C&H MACHINE IN THE CONTINUOUS IMPROVEMENTS EFFORTS. PLEASE SEND THIS SURVEY BACK TO THE ATTENTION OF C&H MACHINE'S QUALITY DEPARTMENT VIA FAX TO: 760-745-2511 Page 6

Supplier Interview/Survey   943 S. Andreasen Escondido, Ca. 92029 (760)746-6459 Fax(760)745-2511 Supplier Quality Survey Survey Conducted By Initial Survey False Yes False No Follow-up Survey Company Name: Supplier Address: Sub-contractor City: State: Zip: Phone: Fax: Web: State or City License # List products and services offered List number of employees Production Quality Total Management Name Title Do you have a documented Quality policy that defines objectives and commitment. Are you ISO 9000 and/or AS9100 approved? Yes No Certification Number If so you do not need to complete the questionnaire below. Please submit a copy of your Certification with this form. Other Certifications Does your company allow pre-arranged visits to your facility by our quality rep to review your quality system? If certified to an accredited third party STOP HERE AND SUBMIT copy of certificate Management Please include Section of Manual / Procedure Does your company have a quality system which is overseen by sufficient authority? Is your quality system reviewed and maintained at regular intervals? Does your company have an organizational chart? Do you have a system for conducting internal audits? Are your quality system procedures available for personnel responsible for the requirements? Contract Review Do you have a documented review procedure that ensures all contract obligations can be met? Document and Data Control Do you have a documented procedure that defines the control and maintenance of documents? What is your length for retention? Handling of Customer Supplied Material Do you have a documented procedure that defines the method of proper material handling? Do you have a documented procedure for notification of damaged customer material? QSF 4.02.4 Rev. NC   943 S. Andreasen Escondido, Ca. 92029 (760)746-6459 Fax(760)745-2511 Supplier Quality Survey Survey Conducted By Page 2 of 2 Process Control Are clearly defined work instructions documented? False Yes False No Are documented procedures in place for reviewing, controlling and updating work instructions? Inspection Are in process inspections and tests performed in accordance to documented procedures? Are the personnel adequately trained who perform functions related to quality? Inspection Measuring and Test Equipment Is measuring and test equipment controlled, calibrated and traceable to NIST? Are documented procedures in place for the identification and calibration of test equipment? Corrective Action Are documented procedures in place that establish requirements for corrective action? Does this procedure define the verification of affectivity? Training Are training records maintained to show personnel have been adequately trained? Print Name of Person Completing Survey: Title: Signature: Date: Office Use Only Does the inquiry and attachments satisfy criteria for approval? Comments Approval Title QSF 4.02.4 Rev. NC Page 7

Page 8

Leadership Processes Assessment Page 9

Page 10

1.1.1 Strategic Planning- SWOT SWOT will utilize the following gathered information- Financial Analysis Report from the CFO Operations Analysis Report from the COO Technology Analysis Report from the General Manager (are we a “Front Runner”?) Competitive Analysis Report (based on surveys below) Review of Standards- AS9100 Rev. C NADCAP Specifications for Special Processes SEA/LES Surveys gathered- Customer Interview/Survey (see page 6) 5 (Min.) Completed This Survey should be sent to customers within the top 5% of the customer base and repeated among selected customers to develop better business trends. Supplier Interview/Survey (see page 7) 5 (Min.) Completed This Survey should be sent to suppliers within the top 5% of the supplier base and repeated among selected suppliers to develop better business trends. Employee Feedback Forms (see page 8) 8 (Min.) Completed This Survey should be taken from a random sample of 8 to 10 employees involved in the day to day operation of the company. Leadership Processes Self-Assessment Survey (see page 9) 1 per Process Owner Self-Assessment Survey is to be completed by all members of the Lean Management Team and/or Process Owners. SWOT Completion From- Financial Analysis Report Operations Analysis Report Technology Analysis Report Competitive Analysis Report Review of Standards Customer Interviews/Surveys Employee Interviews/Surveys Supplier Interviews/Surveys Leadership Processes Self-Assessment Page 11

Complete as Tentative SWOT Analysis Prior to Planning Session. SWOT Analysis 20XX/20XX Strengths (Internal) Weakness (Internal) 1) Versatile Technology (20XX) 1) Divided Location / Team (20XX) 2) Capacity Level (20XX) 2) Lack of Communication (20XX) 3) Service to Customers (20XX) 3) Lack of Training (20XX)   4) Non-standardized Processes (20XX) Opportunities (Internal and External) Threats (Internal and External) 1) New Sales (20XX) 1) Competition (20XX) 2) New Equipment (20XX) 2) Economy (20XX) 3) New Technology (20XX) 3) Inefficiency (20XX) 4) Better Working Environment (20XX) 4) Healthcare Cost (20XX) 5) Increase in Workforce (20XX) 5) Environmental Impact (20XX) Consider the current conditions within C&H Machine, changes in customer requirements, competition and technology. Does the pre-existing SWOT Analysis still apply to calendar year 20XX? Summary of Analysis: What strengths can we build on that would help us to capture the "Opportunities" or deal with the "Threats"? A) B) C) What weaknesses are there to minimize that would enable C&H Machine to capture the "Opportunities" or deal with the "Threats"? Complete as Tentative SWOT Analysis Prior to Planning Session. Page 16

Complete as Tentative Strategic Goals Prior to Planning Session. Page 17

Complete as Tentative Strategic Goal Planning Prior to Planning Session. Page 18

Use as it applies to the SWOT and Planning Session Preparation Page 21

Page 22

1.1.1 Strategic Planning- Planning Session Deployment Meetings 1.1.1 Strategic Planning- Planning Session SWOT and Business Annual Report Vision Review Mission Review Targets & Objectives Value Stream Mapping (if needed) Review Champions Review Process Owners Review Process Maturity Employee Meetings (4) Supplier Meetings (if needed) Customer Meetings (if needed) Department and Individual Goals (if needed) Action Plans Recognition Communication Go over SWOT and Annual Business Report (open discussion after report). Review Company Mission (open discussion after review) Review Mission (open discussion after review) Review Targets and Objectives (open discussion after review) Review Champions (open discussion after review) Review Process Owners (open discussion after review) Review Process Maturity (open discussion after review) Create a value stream of any problem area (if needed) If needed, discuss any matters or issues that arise in deployment. Address these matters or issues and how they relate to (1) thru (6). Revise Goals for Deployment Meetings Page 23

Example Use and Format Only Process Worksheet Example Date 10.14.XX 1.              Name of the Process ___Box Assembly Sub-process of Manufacturing Value Stream Owner Joe P. 2.      Customer Requirements - what each customer or segment needs/expects from your process: Shipping: Quality boxes in batches of 50. with complete paperwork; adhering to shipping schedule; Accounting: Accurate complete traveler 3.      Business Requirements - things the business demands of the process: Within budget, adhering to schedule, no scrap, safety 4.      What triggers the start of the process: Receipt of order from Production Control End of process: Acceptance of completed batches of 50 boxes to Shipping 5. Measures of process effectiveness or efficiency are: Assembly cycle time: $ value of scrapped materials; labor costs Example Use and Format Only 6. SUPPLIERS' SPECIFIC INPUTS Internal or external suppliers' specific inputs -materials, labor,, equipment, software, info. 7. PROCESS STEPS Current steps or tasks involved in the process and job roles. List in sequence, then develop flowchart. 8. PRODUCT / SERVICE OUTPUTS All products and service outputs given to internal or external customers Supplier Names Specific Inputs Steps 1. Review traveler 2. Layout cardboard pieces according to template 3. Select appropriate size tape 4. Sharpen scissors 5. Tape each joint in specified sequence 6. Fold each joint 7. Stack completed boxes in basket, up to 50 per basket 8. Fill in items 6-8 on traveler and sign 9. Place on cart 10. Email shipping re: batch completion 11. Record shift results on work log and email to accounting 12. Receive acceptance reply from accounting Job Role Line/cell lead Assembler Assembler Assembler Assembler Assembler Assembler Assembler Assembler Assembler Line lead Line/cell lead Customers Shipping & Accounting Shipping Specific Outputs Completed traveler Batches of 50 boxes in baskets Email Notification Accurate measurement logs each shift Production Control Traveler with box size and color specifications Cardboard sheets Clear adhesive |" tape or 1" tape depending upon box size Scissors Baskets Template Work instructions Purchasing Accounting Quality Dept. Dept. Manager...           Page 24 Managing Process Improvement I

Use as it applies to either the Planning Session or Deployment Meeting(s) Page 25

Page 26

1.1.1 Strategic Planning- Deployment Meeting(s) Planning Session Deployment Meetings 1.1.1 Strategic Planning- Deployment Meeting(s) SWOT and Business Annual Report Vision Review Mission Review Targets & Objectives Value Stream Mapping (if needed) Review Champions Review Process Owners Review Process Maturity Employee Meetings (4) Supplier Meetings (if needed) Customer Meetings Department and Individual Goals (if needed) Action Plans Recognition Communication Through the Deployment Meeting(s) share “Improvements” based on- SWOT and Annual Business Report Company Mission Review Targets and Objectives Review of Champions Review of Process Owners Review of Process Maturity Note- The Deployment Meeting(s) can be a further outlet for ideas that may help to refine the goals of the Planning Session. If needed, a Planning Session shall be reconvened to consider these ideas to see how they dovetail into the goals of the coming year. A new abbreviated Deployment Meeting(s) will be schedule to share the goal change(s). Page 27

Process Worksheet Example Date 10.14.XX 1.              Name of the Process ___Box Assembly Sub-process of Manufacturing Value Stream Owner Joe P. 2.      Customer Requirements - what each customer or segment needs/expects from your process: Shipping: Quality boxes in batches of 50. with complete paperwork; adhering to shipping schedule; Accounting: Accurate complete traveler 3.      Business Requirements - things the business demands of the process: Within budget, adhering to schedule, no scrap, safety 4.      What triggers the start of the process: Receipt of order from Production Control End of process: Acceptance of completed batches of 50 boxes to Shipping 5. Measures of process effectiveness or efficiency are: Assembly cycle time: $ value of scrapped materials; labor costs Revise Process Worksheet- based on new ideas discussed on Deployment Meeting(s). 6. SUPPLIERS' SPECIFIC INPUTS Internal or external suppliers' specific inputs -materials, labor,, equipment, software, info. 7. PROCESS STEPS Current steps or tasks involved in the process and job roles. List in sequence, then develop flowchart. 8. PRODUCT / SERVICE OUTPUTS All products and service outputs given to internal or external customers Supplier Names Specific Inputs Steps 1. Review traveler 2. Layout cardboard pieces according to template 3. Select appropriate size tape 4. Sharpen scissors 5. Tape each joint in specified sequence 6. Fold each joint 7. Stack completed boxes in basket, up to 50 per basket 8. Fill in items 6-8 on traveler and sign 9. Place on cart 10. Email shipping re: batch completion 11. Record shift results on work log and email to accounting 12. Receive acceptance reply from accounting Job Role Line/cell lead Assembler Assembler Assembler Assembler Assembler Assembler Assembler Assembler Assembler Line lead Line/cell lead Customers Shipping & Accounting Shipping Specific Outputs Completed traveler Batches of 50 boxes in baskets Email Notification Accurate measurement logs each shift Production Control Traveler with box size and color specifications Cardboard sheets Clear adhesive |" tape or 1" tape depending upon box size Scissors Baskets Template Work instructions Purchasing Accounting Quality Dept. Dept. Manager...           Page 28 Managing Process Improvement I