Neponset Watershed CIC Grant Task 7: Regional O&M Database Framework for a cloud-based tool for stormwater management operations & maintenance plan development,

Slides:



Advertisements
Similar presentations
Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
Easy DCR Development Control Regulation Online Building Permission System.
The main portal page is the entry point to your project information.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NJDEP Maintenance Guidance for Stormwater Management
What is it and what can it do for me?
On-Line Database Placement Application Tutorial. How to Change Your Information On York’s System.
Applying for the VT Multi-Sector General Permit
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
California Integrated Water Quality System (CIWQS) and Electronic Self Monitoring Reports (eSMR) Presentation to California Dischargers.
Copyright 2003 By NTREIS, Inc. Welcome to NTREIS Listings “ADD/EDIT” PowerPoint Presentation.
9/10/2015 What’s New? Edline at Valley View!! Joyce Potempa Technology Department presentation to Building Support Staff February 2, 2010 Institute Day.
Copyright COMPLETExRM, Inc. All rights reserved. Sales Presentation 1 For Real Estate.
Horsley Witten Group, Inc. Public Workshop Typical Maintenance Costs January 19, 2011 Several Slides Courtesy of Center for Watershed Protection Rhode.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Involve Conference - People in Research 6 th September 2006 How can Social Care Online and the new National Social Care Research Register contribute to.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
From the Beginning Design Standards and Other Post-Construction Program Elements.
1 The Office of the Commissioner of Financial Regulation Maryland’s Foreclosed Property Registry.
BSW Post Degree Applying for Placement Orientation :: School of Social Work.
Web Center Training ©2003 Optimum Technology, Inc.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Overview by: Patrick Otsuji - SWRCB Michelle Beckwith - RWQCB.
San Rafael, California November 12, 2015
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
Page 1 of 42 To the ETS – Create Client Account & Maintenance Online Training Course Individual accounts (called a Client Account) are subsets of the Site.
Neponset Watershed CIC Grant Task 7: Regional O&M Database Framework for a cloud-based tool for stormwater management operations & maintenance plan development,
PMO Advisors, LLC PMO Advisor © Release 2.1. The PMO Advisor Portal The PMO Advisor is a gateway to Project Management tools. This portal has two primary.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
Research and Innovation REPORTING and PAYMENT (in practice) v
Section 3 Opportunities Applicant Registration Instructions.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
My MCC Service Portal Welcome to presentation of new MCC.com.sg.
ActivityInfo How to report? Use the login details you were granted
ENGINEERING SERVICE CENTER EMSWeb FES-West 2009 ENVIRONMENTAL MANAGEMENT SYSTEM WEB SITE (EMSWeb) Eugene Wang NFESC -- Code 423 (805)
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
Systems Development Life Cycle
Welcome! To the ETS – Create Client Account & Maintenance
MS4 On-site evaluations & common findings
Ariba Contracts: Initiate eSignature
Underground Injection Control
Ontario Cup Tournament Convenor Guide May 2013
Flow chart to determine whether coverage is required
IHCDA Online Annual Owner Certification
MS4 OVERVIEW 2015.
ECM SERVICES Group Stormwater Monitoring Program
Illicit Discharge Detection & Elimination (IDDE) Plan
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Presentation transcript:

Neponset Watershed CIC Grant Task 7: Regional O&M Database Framework for a cloud-based tool for stormwater management operations & maintenance plan development, reporting, enforcement, and public records access

User Types Local permitting authority – View reporting history – Issue enforcement orders Owner / Operator – Create O & M plan based on template – Report O & M activity Public Users – View O & M plans – View reporting history

Owner/Operator: Create O&M Plan Record Specify local permitting authority Project name Parcel numbers (pre- & post subdivision) Watershed / subwatershed (auto generated) Legally responsible party Reporting point of contact Spill prevention / emergency contact Registry of Deeds book & page

File Uploads – O & M Plan PDF site plan of stormwater system (as-built) CAD, shapefile, or KMZ of system (as-built) PDF of final permit documents: – Order of Conditions – Stormwater permit – Special Permit – Subdivision Approval

O & M Plan Template: BMP list Select BMP type (bioretention, hydro separator, retention basin, etc) Indicate number of BMPs on-site Text field describing location / function Boilerplate inspection requirements (editable) Boilerplate maintenance requirements (editable) Confirm schedule of BMP tasks Specify start date and milestone dates

Plan Template: BMP Task Matrix BMP TypeFrequencyTaskTask Type Sweeping QuarterlySweeping Maintenance Hydro Separator AnnualClean-out Maintenance General WeeklyInspect Parking Lot Inspection Bioretention BiannualMulch Maintenance

Plan Template: Pollution Prevention Select materials covered – Multiple choice (& “other, specify”) Boilerplate materials management plan (editable)

Plan Template: Export & Finalize Export O &M Plan as MS Word document Local authority review Edit plan template online Export final O & M plan as PDF and upload to site Municipal user “locks” O & M activities template once plan is approved

Owner/Operator: Reporting Module  Swear by pains of perjury that this is an accurate record of inspection and maintenance SUBMIT BMP TypeTaskDue DateDescriptionCorrective Action Status Hydro Separator Clean-out 1/1/15 CleanedNoneDelayed General Inspect Parking Lot 12/15/14 Inspected Picked up trash Not Complete Sweeping 11/1/14 SweptNone Not Complete BioretentionMulch 1/1/15 Maintained Replanted & mulched Complete

Municipal User: Overview Plan #AddressOwnerView Report GradeView Enforcement View Plan Owner/ Operator Details 5003 Main St3M LLC  95%    5012 Oak DrJones  60%    Elm StWendy’s  100%    st AveFrank  89%    “Grade” is percent of maintenance & inspection requirements completed and reported on-time within past 21 months

Municipal User: Plan Report Plan # 500; 3 Main Street; 3M LLC “Issue Enforcement” generates boilerplate letter/ to Owner/Operator point of contact BMP TypeTaskDue DateDescriptionCorrective Action StatusIssue Enforcement Hydro Separator Clean-out 1/1/15 CleanedNoneDelayed  General Inspect Parking Lot 12/15/14 Inspected Picked up trash Not Complete  Sweeping 11/1/14 SweptNone Not Complete  Bio- retention Mulch 1/1/15 Maintained Replanted & mulched Complete 

Alerts Owner / Operator: Due date approaching – 1 week in advance, 1X Owner / Operator: Due date passed – Weekly digest Municipal Staff: New report submitted – As submitted Municipal Staff: Reports overdue – Weekly digest

Public Users: Overview & Plan Report Plan #AddressOwnerView Report GradeView Enforcement View Plan Owner/ Operator Details 5003 Main St3M LLC  95%    5012 Oak DrJones  60%    Elm StWendy’s  100%    st AveFrank  89%    Plan # 500; 3 Main Street; 3M LLC “Issue Enforcement” generates boilerplate letter/ to Owner/Operator point of contact BMP TypeTaskDue DateDescriptionCorrective Action StatusIssue Enforcement Hydro Separator Clean-out 1/1/15 CleanedNoneDelayed  General Inspect Parking Lot 12/15/14 Inspected Picked up trash Not Complete  Sweeping 11/1/14 SweptNone Not Complete  Bio- retention Mulch 1/1/15 Maintained Replanted & mulched Complete 

All Users: Interactive Map Report “Grade” Good (>90%) Fair (70% - 90%) Poor (<70%) 18 Unquity Road Reporting Rate: 65% Owner: Milltown LLC View Plan Report

Next Steps Refine desired functionality Develop website specifications Prepare RFP