Risk Assessment – all risks approach

Slides:



Advertisements
Similar presentations
1 OBJECTIVES: TO HAVE A CLEAR IDEA ON HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL * TO UNDERSTAND THE METHODOLOGY TO PERFORM GROUP RISK ASSESSMENT.
Advertisements

Risk Management an Element of Loss Control
A Joint Code of Practice Objectives and Summary Presentation
Risk Management Introduction Risk Management Fundamentals
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Action 1: Mission/task analysis Action 2: List Hazards Action 3: List Causes STEP 1 IDENTIFY THE HAZARD STEP 2 ASSESS THE RISK Action 1: Assess hazard.
Criticality Analysis Slide 1 Criticality – Mil-Std-1629 Approach n CRITICALITY is a measure of the frequency of occurrence of.
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
Human factors Training & Competence CaspianExplorer.com.
Unit 6 – Risk Management and safety management system
Improving Construction Industry Safety Marton Marosszeky ACCI - UNSW
The Australian/New Zealand Standard on Risk Management
Operational Risk Management for Airport Emergency Planning
Job content Social relations Material working conditions Terms of employment Risk assessment Action plan Productivity Quality Reputation improving Occupational.
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Risk Management at a Glance. Terms Hazard Hazard Risk Risk Probability Probability Severity Severity Estimating Estimating Exposure Exposure Risk Assessment.
PHILOSOPHY OF ACCIDENT PREVENTION
Occupational health and safety
Hazard Identification
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
14 Pierrepont Rd (617) Newton, MA 02462
YACHTING AUSTRALIA Club Risk Management Template A Practical Resource for Clubs and Centres.
Ship Recycling Facility Management System IMO Guideline A.962
Basics of OHSAS Occupational Health & Safety Management System
© 1 Confined Space Entry Issues Craig Schroll, CSP, CUSA FIRECON
constructionsite Risk Assessment Procedures constructionsite Risk Assessment Procedures  Define the Work Activity  Understand the Work Method  Define.
Health and Safety Policy
Shaanxi Normal University International Business School Baolai Wei A Cost Analysis for Navigation Risk.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
OPERATIONAL RISK MANAGEMENT
Hazards Identification and Risk Assessment
Risk Assessment Codes and Ergonomics COL Mary Lopez 12 August 2003.
September 2002 (Version 1) CIWMD Training and Risk Assessment.
Risk Assessment Soft Skills Programme Nexus Alliance Ltd.
Session 181 Risk Analysis RISK = LIKELIHOOD X CONSEQUENCE.
A European campaign on Risk Assessment Common errors in Risk Assessment.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.
1. 2 Hazard Assessment 3 Your accident rates or injury rates will be reduced by being pro-active in Hazard Assessment.
Ferris State University & Michigan Department of Career Development 1 Hazard Assessment.
Multi-National Brigade (East)
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Risk management Be aware. Take care. Hazards exist wherever you work. They can place you and others at risk.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
CATASTROPHIC (I) Loss of ability to accomplish the mission or mission failure. Death or permanent total disability (accident risk). Loss of major or mission-critical.
OHSAS Occupational health and safety management system.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Risk Assessment & Risk Control December 2014 Dr Emer Bell Integrated Risk Solutions.
BTEC Level 3 Sport Unit 3: Assessing Risk in Sport
BTEC Level 3 Sport Unit 3: Assessing Risk in Sport
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
Ranjan kumar Assistant Manager CCL,Ranchi
Risk management Be aware. Take care.
ESSA Grading Criteria Can the finding lead to a mishap?* No
Ensuring a safe workplace
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
Risk Management Policy & Procedures
Research Project Overview
DEFINITIONS.
Risk management - HIRAC awareness presentation
Quality Risk Management
Air Carrier Continuing Analysis and Surveillance System (CASS)
RISK ASSESSMENT “Risk management tool, for a safe workplace”
Risk Management At international schools
Unit I Module 3 - RCM Terminology and Concepts
Risk Scoring: Likelihood Less than 10%
SELDOM (D) Remotely possible; could occur at some time
Presentation transcript:

Risk Assessment – all risks approach John F. Ring BE, Dip.OSH, Dip.SHWW ,Dip.Env.Eng., MIITD, MIFS, MIOSH, Eur Ing C.Eng.MIEI. College Safety Officer, UCC

Application of Risk Assessment EU/ IRL Legislative Requirement Safety Management Risk Management

The Law & Risk Assessment A Safety Statement must be based on a completed risk assessment Risk Assessments must be maintained and up-dated. HSA Inspectors in Cork require to see Risk Assessments as follows: Job, room, area, equipment, activity, process basis

Application of Risk Assessment Safety Management Prioritise safety action programme. Rank and prioritise safety audit findings. Evaluate benefit of accident prevention measures & costings. Risk Management Relative ranking of various types of risks ( all potential losses) Prioritise actions. Prioritise expenditure (via risk and risk reduction benefits)

Types of Risk Assessment Quantitative Scientific studies & measurements Comparison of results with limit values Occ. Hygiene, Noise, Structural design, Ergonomics etc. Qualitative Semi-scientific or non scientific Judgement decisions Professional and personal experiences/ biases. Codes of Practice

Qualitative Risk Assessment (1) ‘Decide’ on risk level using judgement, experience and technical knowledge Low or Medium High or Very High Extremely Subjective Personal and individual variations! May not be ‘bought in to’ by any medium to large scale organisation

Qualitative Risk Assessment (2) Use a numerical model to assess risk. Probability and consequence models Judgement, technical knowledge and experience required. Subjectivity remains A good model reduces personal & individual biases/ variations !! Could be ‘bought in to’ by any medium to large scale company

Problems with Numerical Models ‘Every’ risk is either Very High or Low! Assessments often do not relate to reality! Results are easily rubbished! Not seen to be very scientific! Users may not be considered ‘professional’ Non- life risks are generally not covered. How can other risk priorities be compared?

Risk Nomogram in use at UCC Semi-scientific Easy to Use Well received Risk Assessment by Dept. (devolved) Little variations in use Good spread of results Source: Dr. Hani Raafat of Aston Univ. Economic, Life and Environment Risk Types (on 1 model) Graded Consequences Probability /Frequency Exposure duration

Risk Nomogram Dr. Hani Raafat Four Types of Risk Consequences Economic (6 categories) Personnel (6 categories) Public and Reaction (6 categories) Environment (6 categories)

Risk Nomogram Dr. Hani Raafat Risk Consequence 1: Economic Category I < €1 k Category II < €10 k Category III < €100 k Category IV < €1 m Category V > €1 m Category VI Total Loss

Risk Nomogram Dr. Hani Raafat Risk Consequence 2 : Personnel Category I : Insignificant Category II : Minor Category III : Major Category IV : Severe Category V : Fatality Category VI : Multiple Fatalities

Definitions: Effects on Personnel Insignificant: No human injury expected or < 3 days lost time Minor: Injury/ Illness, 3 – 28 or 56 days lost time, full recovery expected. Major: Injury/Illness, 28 + or 56+ days lost time, or permanent slight incapacity Severe: Permanent incapacitating injury/ illness.

Risk Nomogram Dr. Hani Raafat Risk Consequence 3: Public and Reaction Category I : Nuisance ( Mild reaction) Category II : Complaints ( Minor local outcry) Category III: GP attendances /Complaints ++.) Category IV: Hospitalisation or Local Media attn Category V : Serious Injury or National Media attn Category VI : Fatality or Govt & Media attn

Risk Nomogram Dr. Hani Raafat Risk Consequence 4: Environment Category I : Insignificant Category II : Temp. Short Term Damage Category III : Major Pollution Category IV : Severe Pollution Category V : Widespread Damage Category VI : Catastrophic Damage

Risk Nomogram Dr. Hani Raafat Probability (Likelihood): Ratings/Experiences 1 in 10 or 10 -1 (Frequent) 1 in 100 or 10 -2 (Probable) 1 in 1,000 or 10 -3 (Occasional.) 1 in 10,000 or 10 -4 (Remote) 1 in 100,000 or 10 -5 (Improbable) 1 in 1,000,000 or 10 -6 (Extremely remote)

Risk Nomogram Dr. Hani Raafat Exposure to Hazard: Time (% of 24 hr day) < 1 % (very rare) 1 % (rare) 25 % 50 % 75 % 100 % (continuous)

Risk Level Tie Line High (D) Moderate (B) Low (A) Risk Calculator Frequency Risk Level Risk Conseq. Frequent (10 -1 ) Exposure ( % time) High (D) Probable (10 -2 ) <1% 1% VI V Substantial (C) Occasional (10 -3 ) 25% iv 50% III 75% Remote (10 - 4 ) 100% II Moderate (B) ( 24 hr day) I Improbable (10 -5 ) Low (A) Risk types1 to 4 Extremely Remote (10 -6 ) Risk Calculator

Life Risk Case Study A ( Risk Type: Staff safety) Unguarded machine – potential for limb amputation Regular breakdowns and clogging untrained operators No maintenance procedures 6 hours operation /day = 25% of 24 hr day Regular accidents

Risk Level 1 1 Tie Line High (D) Moderate (B) Low (A) Risk Calculator Frequency Risk Level Risk Conseq. Frequent (10 -1 ) Exposure ( % time) High (D) Probable (10 -2 ) <1% 1% VI V Substantial (C) Occasional (10 -3 ) 25% iv 50% III 75% Remote (10 - 4 ) 100% II Moderate (B) ( 24 hr day) I Improbable (10 -5 ) Low (A) Risk types1 to 4 Extremely Remote (10 -6 ) Risk Calculator

Improvement Option 1 Train staff and provide PPE ( traditional response!) Same operating hours & machine set up

Risk Level Tie Line # 1 # 1 High (D) Moderate (B) Low (A) Frequency Risk Level Risk Conseq. Frequent (10 -1 ) Exposure ( % time) High (D) Probable (10 -2 ) <1% 1% VI # 1 V # 1 Substantial (C) Occasional (10 -3 ) 25% iv 50% III 75% Remote (10 - 4 ) 100% II Moderate (B) ( 24 hr day) I Improbable (10 -5 ) Low (A) Risk types1 to 4 Extremely Remote (10 -6 ) Risk Calculator

Improvement Option 2 Train staff and provide PPE has been tried Consider reducing operating hours to 3 hours per day = 12.5% of a 24 hour day Retain machine set up ( un-guarded)

Risk Level Tie Line # 2 # 2 High (D) Moderate (B) Low (A) Frequency Risk Level Risk Conseq. Frequent (10 -1 ) Exposure ( % time) High (D) Probable (10 -2 ) <1% 1% VI V Substantial (C) Occasional (10 -3 ) 25% iv # 2 50% III 75% Remote (10 - 4 ) 100% II Moderate (B) ( 24 hr day) I # 2 Improbable (10 -5 ) Low (A) Risk types1 to 4 Extremely Remote (10 -6 ) Risk Calculator

Improvement Option 3 Guard the machine / provide appropriate interlocks, emergency shut off devices, power isolation facilities Introduce maintenance lock off systems and permit to work Train staff, resume normal hours Maintain the equipment

Risk Level Tie Line # 3 # 3 High (D) Moderate (B) Low (A) Frequency Risk Level Risk Conseq. Frequent (10 -1 ) Exposure ( % time) High (D) Probable (10 -2 ) <1% 1% VI V Substantial (C) Occasional (10 -3 ) 25% iv 50% III 75% Remote (10 - 4 ) 100% II Moderate (B) ( 24 hr day) I Improbable (10 -5 ) Low (A) Risk types1 to 4 Extremely Remote (10 -6 ) # 3 # 3 Risk Calculator