1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 MICE Funding Agency Committee Technical Status of the MICE Project Contents: Technical organisation of project Target Decay solenoid Infrastructure Moving.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 UKNF/MICE OsC PM report Summary assessment of MICE Risks, pressures and worries Project management Electrical substation, accommodation Redefining the.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 CDM Status Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
1 PM report International & UK programmes Overview Reconstructing the schedule The UK Project Management team Progress with major subsystems Substation.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
1 MICE MPB/RLSR Integration of Step IV Readiness of the major subsystems Installation sequence and schedule considerations Logistics, staffing and local.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, DL, 4 th -7 th June 2008.
1 MICE CM28 Schedule & Risk Comment Schedule reconstruction and management The ‘straight to Step IV’ discussion How a schedule meeting can work Risks (and.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
MICE CM28 Engineering Session Summary (On behalf of Wing)
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009

MICE CM24 Contents: Progress & highlights August shutdown Planning for Phase Two Organisational things 2

3 Progress & Highlights Two crucial topics are going pretty well: Decay solenoid Addition of MLI successful Has held 900 amps for one hour Minor problem with compressor chiller right now Robust plan exists for working solenoid for September running More later I’m sure And the target Re-engineered design is complete and drawings all done Manufacturing techniques identified and contractors selected Parts now in manufacture Still on schedule for end July Meeting to discuss integration with ISIS on June 17 th See Jason’s talk later......

Progress and Highlights Infrastructure mechanical –Now drawing to a close! –False floor complete –All walkways done –All galleries done –Rolling platform for step II installed –Air conditioning commissioned except for minor changes to pullies –We will stop using term ‘infrastructure’ –Integration of steps I – V instead –Main air compressor installed and nearly wired 4

Progress and Highlights Infrastructure Electrical –DL & contract staff have made huge progress, despite necessarily limited UK manpower allocation: –All cable routes, specifications etc have been designed and drawn – we now have a clear starting point –Installation of tray work and trunking for the above making good progress –Air compressor wiring also going well –PPS system has lower priority at present, but not a worry just now –Design and specification of 2MVA transformer upgrade is largely done, ready to negotiate with Operations Board as a non-MICE cost –Support for DL RF project, liquid hydrogen and spectrometer solenoid operation also in progress 5

Progress and Highlights As part of the infrastructure project’s conclusion, R5.2 will ‘shut down’ during all of June, so that we can do: –Main lighting upgrade (much needed, current situation bordering on dangerous) –Installation of blue lighting (radiation hazard areas) –Fire detection and protection installation (legal requirement) –Floor sealing and painting –Painting and decoration of walls and ceiling This is so Step I and Step II can be done in ‘clean’ conditions – important for tracker readout and other gear –Please bear with us during June, back to normal on 6 th July –See Tim Hayler talk in engineering session 6

Progress and Highlights Spectrometer solenoid #1 –Some problems with cooldown at manufacturer –Suspected leak in one vent tube –Currently being investigated/fixed –No indication of schedule implication yet –Hope to gain some insight this week from Steve & Mike AFC module –Coil former difficulties now solved, but at expense of envelope problem for absorber pipework –Solution put forward by Shigeru, Wing and Mike –Agreed by TB recently –More cost and delay –Critical that this is followed up with Tesla 7

August shutdown 17 th August – 2 nd September Probably most important period this year, we have to: Assure ourselves the Decay solenoid is fully operational Remove the synchrotron shielding Install the target Reposition D1 magnet & test Very tight, access dependent on ISIS cooldown Might have to work shifts Willie & Co are well prepared Additional University and STFC staff available 8

Planning for Phase Two Many thanks to those who contributed to the cost and schedule review – a boring and difficult job We still have some work to do, but have a much better idea of what the constraints on the project are Phase Two has to face some difficult facts Right now we seem to be driven by three main influences: Scope of UK funding Delivery schedule of major subsystems The ISIS user run schedule What it might mean in practical terms, still much discussion to be had of course

Planning for Phase Two UK allocation fy 09/10 only allows us to build: Re-instated Step I Install Step II Complete the infrastructure, PPS and electrical work Manpower is cut severely, University staff brought in to help, but dismantling a successful team is a huge risk..... Delivery of major subsystems Also a worry, no real information yet, but are planning on spectrometer solenoid at RAL in Autumn 2009, given 3-4 months integration, it begins to fit with the above Pure conjecture on my part at present, but Focus Coil module #1 looks like Easter 2010 – already points to significant Step IV delay 10

Organisational things Thanks to Willie & Co, the Hall organisation continues to run very well Noticeable improvement to CDM rule adherence by visitors and contractors – well done everyone During June, Andy will deputise for Willie Message to the MOMs: Block advance booking at Ridgeway House is getting difficult Rose has opportunity to advance book rooms in Chilton for all likely MOM & visitor requirements, what do you all think? I’ll get opinions during CM Will soon have re-chargeable cost code for each MOM institute – hopefully make transport, etc easier 11