1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

The Midwest ISO from a Transmission Owner Perspective.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
SMUD Sustainable Energy Supply Progress in Carbon Reduction POU 101: CMUA Briefing of Legislative Staff February 26 th, 2015 Obadiah Bartholomy Powering.
Jim Larranaga Men’s Basketball Head Coach, AP National Coach of the Year University of Miami Our Formula for Success: The Miami Way.
Resource Adequacy in PJM
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Highway-Byway Cost Allocation: What it Offers MISO January 2010 Presented to the Organization of MISO States CARP and the Midwest ISO RECB Task Force Meeting.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Plug-In Electric Vehicles… What has to happen on the other side of the outlet? MARC Conf. Session 4 – Electric Cars: Can we charge our way to a carbon-free.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
The Efficiency of Energy Efficiency Program Tom Van Paris Vice President-Member Services & Communications October 18, 2012.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
An Overview of Our Regulatory Proposal
Montana Ambassadors Helena, Montana February 25, 2011.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Charles Hosken, General Manager Imperial Irrigation District
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Melissa Seymour Midwest Market Structure Iberdrola Renewables June 7, 2010 Mid-America Regulatory Conference Kansas City, MO Integrating Renewables on.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Demand Response in Midwest ISO Markets February 17, 2008.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
Network Customer Meeting Access Metric Update November 16, 2006.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
BUILDING THE NEXT ERA OF CLEAN ENERGY 2010 Mid-America Regulatory Conference - Integrating Renewables to the Grid F. Allen Wiley Vice President, Business.
Investing in America’s Electric Future Morry Markowitz Group Director, External Affairs New Mexico Utility Shareholders Alliance October 7, 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
PJM©2013www.pjm.com Deployment of smart-grid technologies – Technology and market challenges Stu Bresler VP, Market Operations PJM Interconnection University.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
2015 Mace Advocacy alliance policy conference
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
PJM Restructuring Roundtable Panel I: The Integration of Variable Energy Resources in PJM Markets, Planning, and Operations March 30, 2016 Eric Thumma,
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Wind Management at MISO
Evolving Economic Dispatch in SPP
Andrew Ott, President & CEO PJM Interconnection
New England Resource Adequacy
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Creating Benefits for New England: Putting the Pieces Together
Wholesale Electricity Costs
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010

2 Ameren Company Statistics Total Assets Total Revenues Employees Electric Customers Gas Customers Service Area Generation Peak Load (2006) Transmission Miles 2009 $23 Billion $ 7 Billion 9, Million 1.0 Million 64,000 Sq. Miles 16,200 MW 18,265 MW 7,500

3 Transmission Planning Challenges The four Ameren Utilities in MO and IL are Transmission Owning members of the Midwest ISO Ameren plans its transmission as an integrated system  to continue to provide reliable service to customers,  to be more environmentally responsible by enabling growth in renewables,  to improve the efficiency of the delivery system,  to reduce congestion in wholesale markets,  to provide flexibility in response to climate legislation. Current challenges in the Midwest ISO include:  Uncertainty regarding Renewable Standards, climate legislation, load growth, fuel prices, etc.  Piecemeal approach to transmission expansion for new generation interconnections  Potential retirements of generating units due to low market prices and environmental requirements  Congestion in and across organized markets during both on and off peak conditions  Unit commitment, dispatch and minimum load problems due to renewable growth

4 New Projects at Prevailing Voltages Midwest ISO Regional Generation Outlet Study

5 Prevailing Voltages plus DC

6 Midwest ISO Regional Generation Outlet Study New Projects Primarily 765kV

7 Cost Allocation Objectives To encourage needed transmission development in order to provide reliable service and promote efficient market operations. To provide appropriate locational signals for new generation development. To equitably assign the costs of new transmission to those who derive benefits from its development.

8 How does MISO measure up? MISO will file on July 15 Current proposal  No change to Reliability or Regionally Beneficial Projects  Multi-Value Projects –80% to all loads based on MWH –20% to all generators based on MW capacity  Generator Interconnection –345 kV & greater: 90% “higher of” and 10% load ratio share –< 345 kV: 100% “higher of” network upgrades or MVP charge Reliability projects are already addressed MVP concept should help get needed projects built, but criteria need to be defined “Higher of” for new generation gives some incentive for locational decision-making Shortcomings:  Proposal does not attempt to define who benefits to equitably assign costs, particularly with regard to existing generators.  Cost assignment to generators will likely have negative market impacts as well.

9 Going Forward The Midwest needs transmission development to maintain reliable, efficient and environmentally responsible electric service and to promote economic development. Plans need to provide sustainable benefits across a diverse set of potential futures. Cost allocation must encourage new transmission development not impede it.