Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.

Slides:



Advertisements
Similar presentations
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Advertisements

1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
ENTSOG’s view on next steps for regional co-operation Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Brussels, 26 Nov 2010.
Completing the EU internal energy market IFIEC, 22 November 2011
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
Completing the EU internal energy market
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Regional co-operation within the Third Package Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Den Haag, 7 May 2010.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
The EU internal energy market
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Valeria Termini Member of the CEER GA FTS-CEER bilateral meeting, Florence 06 th February 2012 Investment planning rules in Europe.
How will the Third Liberalization package influence the framework of the regulators? Dr. Annegret Groebel Managing Director and Head of International Coordination.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
EUROPEAN COMMISSION Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas Third Package Progress GIE conference
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
1 Cohesion Policy Brussels, 9 June 2009 “ Cohesion policy: response to the economic crisis” European Commission seminar for managing and certifying.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2009, Groningen.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
European Developments Transmission Workgroup 1 st December 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
European Developments Transmission Workgroup 3 rd May 2012.
TITRE ACER: Mission, Structure and Activities Alberto Pototschnig Director E-Control Energy Dialogue Vienna, 7 December 2011.
10 year investment plan ERGEG approach and contribution
The 3rd package for the internal energy market
GRI-S : Infrastructures The Union list of projects of common interest
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Update on European Network Codes
26th February 2015 Teleconference
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
26th February 2015 Teleconference
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets Founded 1st December TSOs from 23 countries

ENTSOG's Mission … by fulfilling its tasks under the 3rd package and offering a platform for a truly European TSO cooperation, ENTSOG shall: - enable easy grid access - facilitate cross-border gas flows - promote the integration of the European energy market - be a fair partner to all stakeholders 2

ENTSOG activity Network Code Development Ten Year Network Development Plan (TYNDP) Summer and Winter Supply Outlook Gas Regional Investment Plans (GRIP) Transparency Platform ( Regional cooperation Co-operation with EC and ACER 3

Network Code Development – Process & Actors Priority setting Framework Guidelines Network Codes Comitology Process Lead Commission ACER ENTSOG Council / Parliament Participation and contribution throughout Stakeholders Member States Commission Regulators TSOs 4

Network Code development: 12 months On the way to EU law Preparatory work Project planning Prepare launch document Interactive draft code development Consultation Prepare final code ACER reviewComitology BAL INT CAM CMP Final Draft NC through internal approval process: delivery date 6 March 2012 Invitation from EC to prepare NC received on Nov 4 th 2011 Prepare for delivery of NC in the area of interoperability rules in 2013 EC currently reviewing text; direct comitology process 5 TAR Tariff provisions form an important part of CAM NC. Process for producing separate tariff legislation currently under discussion

Ten Year Network Development Plan Published bi-annually 1 st (pilot) edition of TYNDP published Dec nd (first formal) edition of TYNDP published 17 Feb month consultation process finished on 25 June TYNDP formally submitted to ACER July 2011 As of September, work started on TYNDP  Next TYNDP to be published Q

Summer / Winter Supply Outlooks Published six-monthly 1 st Winter Outlook was published Oct 2007 by GTE 1 st Summer Supply Outlook was published in June 2010 Some Outlook Reviews are planned to provide a retrospective of actual situation 1 st Review of Summer and Winter Supply Outlooks is planned for Q4 this year, included with Winter Outlook

Gas Regional Development Plans (GRIPs) A new process for most TSOs (started in Feb 2011) − Different framework than for TYNDP; management is with TSOs of the respective regions; ENTSOG to ensure consistency between GRIPs and TYNDP and between GRIPs themselves − Whereas a minimum set of requirements will be agreed for all (six) regions, the GRIPs will nevertheless have a specific regional focus possibly addressing different issues 8

Infrastructure investment influenced by, and in line with, political goals Single European gas market  Third Energy Package  Internal market deadline 2014  Target Model & market rules Security of supply  No energy islands after 2015  SoS Regulation  Energy infrastructure package Sustainability  Climate goals  Renewables & Emissions Directives  Nuclear Phase-Out 9

Ambitious goals require large investments Investment needs and flexibility determined and supported by the market Construction and operation of such infrastructure by TSOs must be sustainable from a long-term financial and regulatory perspective National regulation needs to truly embrace the objective of creating an internal market in gas within the whole Union  Only then it will be possible to realize an integrated gas network supporting the vision for an internal market in gas 10

11 Thank You for Your Attention Wim Groenendijk, Member of the Board ENTSOG -- European Network of Transmission System Operators for Gas Av de Cortenbergh 100, B-1000 Brussels