GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL.

Slides:



Advertisements
Similar presentations
72V - Recoil, Recoil IS, & Instinct New Vehicle Delivery Tips
Advertisements

Gateway Training Workshop Module Two
Chapter 9 Radio Maintenance MComm – Ch Confidence Testing Preventive Maintenance Corrective Maintenance Summary Overview MComm – Ch9 - 2 >>
Perspective SR-22 Electrical System
GS3055-I GSM Universal Wireless Alarm Communicator
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
FIU Chapter 7: Input/Output Jerome Crooks Panyawat Chiamprasert
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Circuit Analysis and Troubleshooting A Six Step Procedure Created by Jimmie Fouts Houston County Career Academy for.
Landing and Taxi Lights Anti-collision Lights Navigation Lights Cockpit and Cabin Lights Instrument Panel Lights Click on a System Link to Start.
United States Army Combined Arms Center Troubleshooting TBC Workstation.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Power-Fill Operation Demonstration Power-Fill Operation Demonstration (See Installation and Operation Manual for detailed instructions)
1 Engine Protector Safe Rider Vehicle Technologies (Pty) Ltd PO Box 11376, Rynfield South Africa Tel./ fax Cell:
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
The Comfort System Product Presentation The Intelligent Home System.
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
DP Cabinet.
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
Chapter 8 Output Modules.
(Smart Loop System) Installation Guide. Rev B Shipping Box Contains Everything that is included in the box being shipped to a customer should contain.
Charging System Service
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
AccuMax Multi-Point Injection Mechanics
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
1 9 April 2011 Seismic Station Operator’s Guide To The Q330 Upgrade System 9 May 2011.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
SCADA and Telemetry Presented By:.
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
Trends in seismic instrumentation Based on the book Instrumentation in Earthquake Seismology Jens Havskov, Institute of Solid Earth Physics University.
1 © Red Lion Controls Inc. Introducing the RAM 9000.
A COMPUTER is an electronic device. Every computer performs 4 general operations: 1. Input 2. Process 3. Output 4. Storage.
Idaho National Engineering and Environmental Laboratory Upgrade of INEEL Seismic Stations and Strong Motion Accelerographs to Digital Field Acquisition.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Troubleshooting Your Network Networking for Home and Small Businesses.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
POWER PLANT USED IN TELECOM
Guide to Linux Installation and Administration, 2e 1 Chapter 9 Preparing for Emergencies.
BATTERY DRAW TEST SC10 By Vance Bloom Objective Student will determine if an abnormal “Key OFF Battery Drain” is present.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Datron World Communications Inc. RT7000 HF TRANSCEIVER FIELD MAINTENANCE PROCEDURES.
GS3055-I GSM Universal Wireless Alarm Communicator
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Kaaba Technosolutions Pvt Ltd1 Objectives Learn that a computer requires both hardware and software to work Learn about the many different hardware components.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
NERC Lessons Learned Summary LLs Published in September 2015.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Semester 1 v CCNA 1 Module 1:Introduction. Semester 1 v Connecting to the Internet.
Group #15 Matt Frank Russell Geschrey.  This project was chosen because of an interest in wireless communication systems, namely BAN's (body area networks)
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
How SCADA Systems Work?.
EnTrans Technology Co., Ltd.
GSN Station Operator Technical Training Program (TTP 2005)
Chapter 31 Battery Systems.
PLC Hardware Components.
Circuit Analysis and Troubleshooting
Product Training Module
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Series 5300 Lithium Cell Formation System
Presentation transcript:

GSN Station Operator Technical Training Program (TTP 2005) Albuquerque Seismological Laboratory ASL

Training Installation, maintenance and operation training are conducted during the initial installation of the station. Refreshed during any maintenance visit.

Glossary ASL – Albuquerque Seismological Laboratory Comm-link – Remote system connection from DAU to DPU DA or DAU – Data Acquisition (Unit) of a Remote system. DAU/DPU – Combined Data Acquisition Unit and Data Processing Unit (Local System) DCC – Data Collection Center DP or DPU – Data Processing Unit. The recording portion of a Remote system. GPS – Global Positioning Satellite

Glossary Continued GSNMAINT –Technical personnel at ASL that handle Global Seismograph Network Maintenance I/O – Input or Output to a module or device IRIS – Incorporated Research Institutions for Seismology LISS – Live Internet Seismic Server QC – Quality Control UPS – Uninterruptible Power System

Training Agenda Effective communication with ASL System hardware descriptions Software operation Maintenance procedures Trouble shooting Data analysis Grounding and lightning protection Shipping hardware to ASL

Contacting ASL By Send all station specific messages to: This is a mail list of all technical persons at Albuquerque Seismological Laboratory Use the format below to help us sort mail and quickly respond to your station problems. Subject: CODE Problem description

Why Do We Use Mail Lists? More than one person is aware of the problem. Multiple points of contact. Maintenance priority is assigned. Actions taken. Data quality is verified. Mail List is notified when the problem is solved.

Problem Handling Flowchart

Data Flow from SAML to ASL

GSN System

Q330 Recording System Example

Detailed System Hardware Descriptions and Training Conducted by Field Engineers on hardware systems matching the specific configuration for each participating station.

Local Power System

Power System Component Descriptions Voltage Regulator –Used to regulate AC voltage. –Corrects for low or high commercial power. Constant Voltage Transformer –Conditions the input AC voltage to the DC UPS (battery charger).

Power System Component Descriptions DC UPS (Battery Charger) –Converts commercial AC power to 24 VDC to the operate the DA and charge the stationary batteries. Stationary Batteries –Power for the DA and seismometers during a commercial AC power outage.

Power System Component Descriptions Battery Preventive Maintenance –Keep the battery terminals clean and dry. –Check for proper voltage in “loaded” and “unloaded” conditions. Battery Replacement –Report any abnormal conditions to GSN Maintenance for replacement instructions.

Photo Voltaic (PV)Power System and VSAT

GSN Q680 System

Q330 and Packet Baler

Equipment Installed in TA Vault

VSAT Antenna and PV Array Examples

Seismometers Borehole Installations –KS54000i –CMG3-TB Surface Installations –STS-1/VBB –STS-2 –CMG-3T –FBA-23 (Accelerometer) –Episensor (Accelerometer)

Seismometers Basic Information –NEVER move a seismometer without locking the mass. –Prevent temperature changes to seismometer and inside vault. –Eliminate seismic noise near seismometers.

Seismometers Operator Maintenance Requirements –Depends on the type of seismometer –Monitor the data quality –Check the mass positions (if data is available) –Center the masses (not possible on all seismometers) –Align the seismometer if it has been replaced (surface instruments only) –Troubleshoot problems

Seismometers STS-2 –Monitor the data for problems –Check mass positions on status screen Center all masses if any mass is more than + or- 5 volts from zero. Use the current procedure provided by GSN Maintenance –Center the masses whenever power is lost to the seismometer –Troubleshooting If data is noisy or spiking, check for moisture problems and re-level the instrument If there is no seismic or mass position data, this is most likely due to a faulty Host Box Request help from ASL

Grounding Grounding is for protection of personnel and reliable equipment operation. Lightning or equipment failures can cause voltage transients that can damage equipment or kill you. All equipment is grounded to one place: Single Point Ground Maintain the integrity of the grounding system installed with the GSN equipment.

Grounding The importance of correctly installing and maintaining a reliable grounding system is explained. Exothermic welding connections are demonstrated.

System Software Training conducted by Software Engineers and Field Engineers. On hardware systems configured for the specific stations. Running the station operational software.

Quality Control Quality Control analysts explain how they verify seismic content of the data. Field Engineers and Quality Control analysts demonstrate and explain the capabilities of data analysis software.

System Maintenance Training is conducted by Field Engineers on hardware configurations for each specific station. Test systems are setup for any unique hardware configurations.

Trouble Shooting Conducted by Field Engineers to locate common problems. Present solutions for possible temporary repairs to keep the station operational.

PRIMARY PROBLEM TROUBLESHOOTING POINTS Before contacting ASL for technical assistance with a station problem please insure the following troubleshooting procedures have been completed.

1.Is power available at all equipment locations? Has there been a commercial power outage? 2.If power is available but a component is not functioning, are fuses blown? 3.Verify normal operation of all LED’s on the system and make notes to inform GSN Maintenance if they are ON or OFF or FLASHING.

4.Note status of Radio or Modem comm- link LED’s if you have this hardware. 5.Inform GSN Maintenance of any electrical storms that may have been in the area when the problem started. 6.If you are not familiar with the above actions ask for guidance from GSN Maintenance.

LIGHTS ON THE QUANTERRA SYSTEM (Example of a Troubleshooting Checklist) CPU Central Processing Unit Board –FAIL (red) OFF = Normal Operation. –STATUS (yellow) FLASHING = Normal operation. –RUN (green) FLASHING = Normal operation. –SCON (green) ON = Normal operation. MVME 712/M Interface Module –Visible through a hole in the front panel are two lights (yellow and green) ON = Normal operation. –The light in the terminator connector on the front panel (green) ON = Normal operation QPWR Quanterra Power Module –The top light (yellow) OFF = Normal operation. –The top light is a blown fuse indicator for the incoming power and will also illuminate when the top power switch is turned off. –The center light (yellow) OFF = Normal operation. –The center light is also a blown fuse indicator. ON = 24 VDC power is lost to the QAP modules. –The bottom light (green) ON = Normal operation. –If the bottom light is not illuminated, there is less than 20 VDC available at the input connector. QDP Quanterra Digital Processor Modules –All 3 (red) lights Flashing brightly each second = Normal operation. –All 3 lights on continuous = CPU has Reset. –Lights flashing rapidly = Memory failure. –Any light flashing dimly indicates that the Digital Processor is trying to send data but the CPU is not accepting the channel. This could also mean a QAP module failure. QVI Quanterra VME Bus Interface Modules –The top light (green) ON For 1 second duration at each minute = Normal operation. –This occurs when the 1 PPM (1 Pulse Per Minute) signal is received from the GPS receiver. –Note: The GPS receiver will not output signals until it has locked onto a satellite. –Middle light (yellow) Flashing brightly and rapidly once each second = Normal operation. –The bottom light (red) Flashing brightly and rapidly once each second = Normal operation.

Operator Responsibilites Tasks to monitor station operational Daily Weekly Periodic These general tasks are tailored for each station.

Contacting ASL By Send all station specific messages to: This is a mail list of all technical persons at Albuquerque Seismological Laboratory Use the format below to help us sort mail and quickly respond to your station problems. Subject: CODE Problem description