Strategies to Overcome Shortages of Crafts and Maximize Field Productivity Strategies to Overcome Shortages of Crafts and Maximize Field Productivity Bobby.

Slides:



Advertisements
Similar presentations
Organization of Primary Entities
Advertisements

HEAT TRACING SPECIALIST
Developing a Balanced Score Card Session 1 Viki Massey, Quality Coordinator A Joint Venture of London Health Sciences Centre and St. Josephs Health Care.
The HR Paradigm Shift Discover Stakeholder Value for the Human Resources Function.
How to Enhance Personal Productivity By Janet Hadley
Lecture 17 Chapter 9 Managing IT Outsourcing. 2 Final Exam Outline 12 – 3pm, Wednesday June 14 Half short and long answers on theory and principles from.
Continuous Value Enhancement Process
Paul G Williams 19 June 2013 Houston, TX THE IMPACT MEGA PROJECTS HAVE ON IN-PLANT PROJECT EXECUTION.
COMPANY PROFILE PYRAMID ENGINEERING PRIVATE LTD. THE COMPANY The Company was established in 2007, with a small group to provide Plant Maintenance, Small.
Global Procurement Solutions (GPS) Manager of Business Development Final Project, Fall semester December 16, 2000.
INDUSTRIAL & SYSTEMS ENGINEERING
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Management is Essential
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
FuTech Systems Business & Engineering Solutions Technology Group Business & Engineering Solutions Technology Group is a Business Group that involves.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
Risk-Based Inspection Program Best Practice – Executive Summary
Benchmarking at Saudi Aramco
The Library Balanced Scorecard: The Results Please! Joe Matthews American Library Association June 2007.
Introduction to Hospitality, 6e
United States-Canada Regulatory Cooperation Council United States-Canada Regulatory Cooperation Council January 30, 2012 Washington D.C
The New Product and Services Development Process By SK Winning Innovations for Tomorrow (WIT)
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Auctions in the Energy Industry an industry look at bidding goods and services in on-line reverse auctions.
Organizational Behavior, 9/E Schermerhorn, Hunt, and Osborn
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
Chapter 9 New Business Development
Small Business Management
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
The leadership piece. What does the leadership concept mean?  Leadership is chiefly about dealing with the intangibles and the most frustrating situations.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Produced by: 5 Keys Proven to Enhance Worker Performance E.J. (Ted) Lister Lister Management Inc.
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Operational Excellence and Sustainable Performance Improvement Date: 9 June, 2009.
1.1.2 Leadership Communication Supplier Excellence Alliance April 8, 2013 Presented by John Cristman Director, Corporate Quality Integrity Aerospace Group.
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
ACM Using Project Controls to Better Plan and Manage Projects PROJECTS NEED PROJECT CONTROLS.
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
Specialty Crop Block Grant Program –Farm Bill CFDA –
Lean Placement Services
© 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
© 2008 IBM Corporation Challenges for Infrastructure Outsourcing July 29, 2011 Atul Gupta Vice President, Strategic Outsourcing, IBM.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
SUSTAINING GROWTH AT COLYTECH How to organize and manage growth in the dynamic Chinese market?
Produced by: Towards a Rational Cost Model Presenter: Tom Lenahan Tom Lenahan Limited.
Understand the principles for developing effective and lasting alliances Creating and Sustaining Successful Alliances.
Business Management Chapter five. Management  What makes a “good” manager?  What makes a “bad” manager? 5-2.
Managing for results Day 9 Module: Management.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
1 ECC/FMI Survey Results September 3, 2007 Research and Analysis by:
Lau Siang Hua See Shie Ping Terence Leow Shin Woei Ooi Kean Chong Cheong Sheng-En Jonathan Managing Technological Changes.
The leadership piece. How to increase profit? How to deal with …? What new strategy?
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
Unifying Talent Management. Harnessing the Power of Workforce Intelligence in Talent Planning to Drive Business Performance.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Entrepreneurial Strategies. A Major Shift... From financial capital to intellectual capital – Human – Structural – Customer.
Management Consultancy Services in Dubai
Commissioning & Startup
Procuring Professional Services
Best Practices Consortium
Identify the Risk of Not Doing BA
By Jeff Burklo, Director
Presentation transcript:

Strategies to Overcome Shortages of Crafts and Maximize Field Productivity Strategies to Overcome Shortages of Crafts and Maximize Field Productivity Bobby Singh President Project Assurance, Houston, Texas

Presentation Focus Strategies to Overcome Craft Shortages  Industry’s Challenge to Overcome Craft Shortages  Recent Turnaround Experiences  Some of Our Management Weaknesses  Solutions to Overcome Craft Shortages  Improving Craft Productivity

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Contractor Alignment and Team Building Sessions are conducted after the turnaround completion. 10 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Turnaround scheduling staff are frustrated due to the planning software’s limitation to schedule only 1,000,000 activities. 9 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Reengineering is considered to be as-built drawings after operations and process engineering groups have made 10,000 MINOR scope improvements. 8 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Expedited and long-lead materials are found under contractors’ trailers after the turnaround completion. 7 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Sole criteria for selecting qualified contractors is the number of their memberships to golf clubs, burlesque bars and invitations to hunting and fishing trips. 6 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Planning, Cost, Inspection and Safety staff are laid off to save turnaround costs and improve company profits. 5 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds WBS, PSM and HAZOP are perceived as the new Cable TV Channels on the information super-highway. 4 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Company’s turnaround vision, executive mission statement and performance goals are written by professional speech writers. 3 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds Progress status, schedule updates and cost forecasts are performed by local psychics, astrologers and tarot card readers. 2 Achieving World-Class Turnarounds

TOP TEN LIST When a Company is NOT Managing World-Class Projects and Turnarounds When a Manager says, “I have not read Bobby Singh’s latest book World-Class Turnaround Management.” 1 Achieving World-Class Turnarounds

Industry Challenge Cost and schedule performance of most Capital Projects and Plant Turnarounds is being severely impacted by : 1. Shortages of qualified crafts 2. Experienced supervision Strategies to Overcome Craft Shortages

Industry Challenge Poor performance on capital projects and turnarounds is further compounded by: 1. Poor field productivity 2. Low actual tool time 3. New regulatory requirements 4. Integration with large capital projects Strategies to Overcome Craft Shortages

On a typical construction the actual tool time on a 10-hour work shift Is less than 4 hours Not an Encouraging Productivity Statistics Productivity – Tool Time Strategies to Overcome Craft Shortages

How many of you folks have their Projects and Turnarounds results adversely impacted by Craft shortages and poor productivity? Strategies to Overcome Craft Shortages

Some of Canada’s large tar sand projects have experienced cost overruns of over Billion Dollars due to craft shortages and poor field productivity. Past Performance Results Strategies to Overcome Craft Shortages

Ethylene Turnaround in Houston Area Planned crafts during turnaround:2000 Actual maximum number of crafts1200 * Turnaround scheduling started 24 months before the turnaround ** 2 large mechanical contractors were selected for execution Past Performance Results Strategies to Overcome Craft Shortages

Large Turnaround in Lake Charles Planned welders / pipe fitters crafts 124 Actual welders provided by contractor 31 * Other mechanical contractor was added to supplement primary contractors ** Contractors started planning 18 months before the turnaround Past Performance Results Strategies to Overcome Craft Shortages

Ethylene Turnaround in Lake Charles Planned welders / pipe fitters crafts112 Actual crafts provided by contractor115 * Multiple contractors were selected to execute turnaround work scope ** Craft requirements and contracting strategy were developed 18 months before the turnaround Past Performance Results Strategies to Overcome Craft Shortages

During some recent large turnarounds and capital projects, the problems resulting from shortage of qualified crafts and poor productivity was so bad, that to help finish the work, the companies had to rely on: Highly Experienced, Motivated and Productive Crafts !!! Overcoming Craft Shortage Challenge Strategies to Overcome Craft Shortages

Contracted Foreign Crafts from: Philippines India IndiaCroatia Strategies to Overcome Craft Shortages

Welcome to the new realities of executing plant Projects and Turnarounds in the 21 st Century Foreign Pools of Contracted Labor Strategies to Overcome Craft Shortages

Turnaround Management Benchmarking Key Performance Areas Strategic Planning Work Scope Management Contracting Strategy Manpower Planning Productivity Improvement Leaders = Industry Average = Laggards = Strategies to Overcome Craft Shortages %

We Must Accept Our Weaknesses  Owners’ planning resources and expertise are limited and shrinking  Most companies do not perform front-end planning to identify craft needs and develop craft procurement strategies  Companies spend most efforts reacting and fighting fires than up-front strategic planning Strategies to Overcome Craft Shortages

We Must Accept Our Weaknesses  Manpower plans and solutions are developed without participation of contractors and consultants  We hope and sometimes pray for highest results without mitigating the potential problems and implementing innovative approaches  Past poor results have been tolerated without any consequences Strategies to Overcome Craft Shortages

We have met the enemy and the enemy is us. Strategies to Overcome Craft Shortages

 Start the planning early – 18 to 30 months before the turnaround  Start integrated planning with capital projects months before turnaround date  Strategic Planning – Recognize the challenges early and identify innovative solutions Steps Towards the Ultimate Solution Strategies to Overcome Craft Shortages

 Identify 80% + Turnaround Work Scope months before the turnaround date  Identify preliminary craft requirements months before the turnaround  Develop contracting strategies that reflect new market conditions – select contractors months before the turnaround Strategies to Overcome Craft Shortages Steps Towards the Ultimate Solution Steps Towards the Ultimate Solution

 Select multiple high performance contractors  Do not overstretch contractors beyond their core strengths and capabilities  Develop contractor contingency planning to quickly act in case primary contractors could not perform  Jointly develop craft procurement plans Smart Solutions Strategies to Overcome Craft Shortages

 Select specialty contractors for complex work  Utilize fixed-fee and incentive contracting to create win-win and high-performance work environment  Implement Productivity Improvement Plan in consultation with contractors and consultants Smart Solutions Strategies to Overcome Craft Shortages

 More emphasis on pre-fabrication  Modularization construction  Contractor alliances tied to performance baseline  Splitting the turnaround into smaller and manageable work scope  Reliance on contracted pools of foreign labor Emerging New Trends Strategies to Overcome Craft Shortages

 Implement Productivity Improvement Plans  Establish realistic budgets  Programs to seek only qualified crafts  Efficient work / safety permits systems  No smoking projects and turnarounds  Enforce discipline during breaks and quitting time Productivity Improvement Ideas Strategies to Overcome Craft Shortages

 Extensive planning and true look-ahead schedules for next 2-4 shifts  Minimize changes to execution plans  Have efficient safety meetings  Eliminate wait time due to materials and equipment delays Productivity Improvement Ideas Strategies to Overcome Craft Shortages

Sadly, there is no Magic Wand to overcome this problem. Ultimate solutions is to take several small but smart steps: 1.Set higher expectations 2.Start craft planning early 3.Seek qualified staff and contractors 4.Synergistic and efficient work environment Conclusion Strategies to Overcome Craft Shortages

If all the above does not work, then call: Project Assurance. Questions and Answers Session ! Conclusion Strategies to Overcome Craft Shortages