Stormwater permitting requirements for small municipal separate storm sewer systems 2015 Environmental Trade Fair Stormwater: MS4.

Slides:



Advertisements
Similar presentations
SW101 Municipal Separate Storm Sewer Systems (MS4s)
Advertisements

What are TMDLs? and What Might They Mean to MS4 Permittees?
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
EPA Region 6 MS4 Conference July 28 – August 1, 2014
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates
Total Maximum Daily Loads in MS4 Storm Water Programs.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Water Quality Seminar September 23-24, 2015 Hanne Lehman Nielsen and Rebecca Villalba.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Stormwater: MS4. Permitting requirements for small municipal separate storm sewer systems Environmental Trade Fair.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
North Hennepin Community College MS4 Plan October 24, 2014.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
2017 Environmental Trade Fair.
Stormwater Pollution Prevention Program Compliance
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Town of Melbourne Beach
Summit County MS4.
Sacramento County Stormwater Quality Program
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

Stormwater permitting requirements for small municipal separate storm sewer systems 2015 Environmental Trade Fair Stormwater: MS4

Polly Porter Compliance Assistance Specialist Waco – Region

SBLGA STAFF

Technical Assistance Free and Confidential. Multi-media. Compliance Hotline. One-on-one help from regional staff. Special programs (if eligible). EnviroMentor (EM). Site Visit / Compliance Commitment (C2).

Who does SBLGA help? Airports. Auto Body / Repair. Building Contractors. Car Washes. Compost Operations. Concrete Batch Plants. Drinking Water Plants. Dry Cleaners. Foundries. Local Governments. Marinas. Metal Finishers/Fabricators. PST Facilities (fuel). Print Shops. Manufacturing Facilities. Reinforced Plastics. Surface Coaters. Trade Associations. Transportation/Distribution. Wastewater Plants. Wood Products.

Compliance resources can be searched by industry, issue or special topics. TexasEnviroHelp.org

What is stormwater? What is a discharge? Stormwater is rainfall. Run-off carries potential pollutants as a discharge.

Rule References Federal. Clean Water Act. 40 Code of Federal Regulations. o Chapter State. Texas Water Code. o Chapter Texas Administrative Code. o Chapters 281, 305, 308.

EPA National Pollutant Discharge Elimination System CGP (Construction) MSGP (Industrial) Phase I and II MS4s (Municipalities, et al) TCEQ Texas Pollutant Discharge Elimination System Agency jurisdiction

TPDES Multi-Sector General Permit (MSGP). o TXR (August 14, ). Construction General Permit (CGP). o TXR (March 5, ). Municipal Separate Storm Sewer Systems (MS4s). o Phase I – large and medium cities. Individual / customized. o Phase II – small cities. General Permit TXR (Dec. 13, ).

What is a permit? ● Effluent limitations and requirements for 5 years. ● Authorizes discharges from specific activities and certain non-stormwater discharges.

It’s just dirt.

How does that hurt?

Litter and debris damage water quality

Preventing Pollution is everyone’s job

What is an MS4? Publicly owned or operated drainage system designed to convey stormwater. Not a wastewater collection or sewer. May include non-traditional entities such as military bases, transportation systems, hospitals, universities, correctional facilities and a variety of districts.

Regulated Districts Jurisdiction of the TCEQ: GCDGroundwater Conservation District. IDIrrigation District. MMDMunicipal Management District. MUDMunicipal Utility District. RDRegional District. SCDStormwater Control District. SUDSpecial Utility District. WCIDWater Control & Improvement District. WIDWater Improvement District.

Urbanized Area High density of residential population identified by most recent U.S. Census (2010): o at least 1,000 people per square mile and. o at least 50,000 total population. Conveyance located fully or partially within UA. Must regulate only that portion within UA. “Once in, always in.”

Urbanized Areas are regulated MS4s

Urbanized Clusters are not regulated

Most Recent Census Williamson County MS4s must regulate only the portion inside the UA not covered by another entity’s permit/SWMP.

Applications Deadline was June 11, Full permit coverage: o Notice of Intent - form o $100 application fee. o Stormwater Management Program Waiver 1 Option – form Estimated totals received: o 507 NOIs. o 72 Waivers.

Authorization Process Submit NOI, SWMP and fee. Administrative review by the TCEQ. o Additional information from applicant. Technical Review of SWMP. o Additional information from applicant. Public Notice published in newspaper. o Public Meeting. Approved by the TCEQ.

Waiver Option Waiver 1: Serve population less than 1,000 within a UA. No significant contribution to: o pollutant loadings of and interconnected MS4. o pollutants identified as a cause of impairment to receiving water body. Change in those conditions requires NOI/SWMP. Waiver 2: Data and labor intensive. More costly than permit.

Impaired Water Body 2012 Index of All Impaired Waters (cat. 4 & 5). Identify pollutant of concern. Determine if MS4 contributing POC. SWMP must include: o Focused BMPs for reducing POC. o Measurable goals for each BMP. o Bacteria - identify and focus on sources. o Assess progress. Include in Annual Report.

Water Body with TMDL Total Maximum Daily Load established. Identify cause of impairment. Determine if MS4 contributing POC. SWMP must include: o Targeted controls for reducing POC. o Measurable goals for each control. o Create benchmarks. o Bacteria - identify and focus on sources; refer to watershed’s Implementation Plan. o Assess progress – collect or use other’s data. Include in Annual Report.

Administrative Requirements Application for permit coverage. Stormwater Mgmt. Program approved by TCEQ. o Establish measurable goals to MEP. o Maintain records evaluating efforts. o Implement SWMP by end of permit term. Annual Report. o Submit within 90 days of end of each permit year.

Technical Requirements Develop and implement comprehensive SWMP to: Reduce pollution to maximum extent practicable. Meet water quality requirements of CWA and TWC. Required only inside of UA boundaries. Best Management Practices, ordinances, and other mechanisms. Include six minimum control measures.

Signatory Authority NOI, NOC, SWMP, Annual Report - 30 TAC Corporation. o responsible corporate officer. Government entities. o principle executive officer. Ranking elected official. o mayor, commissioner, etc..

Delegation of Authority Authorized person may delegate - 30 TAC Authority assigned for other responsibilities. May specify individual OR position having. responsibility for the facility, department, project, activity or environmental matters. Must be in writing – TCEQ form

SWMP Includes a map and six Minimum Control Measures: 1. Public Education, Outreach and Involvement. 2. Illicit Discharge Detection and Elimination. 3. Construction Site Runoff Control. 4. Post-Construction Mgmt. in New & Redevelopment. 5. Pollution Prevention and Good Housekeeping for Municipal Operations. 6. Industrial Sources. 7. Optional – Construction by MS4.

Implementation Options Share program elements w/others: o Phase I or II existing programs. o Phase II developing programs. Each MS4 responsible for: o Applying for permit coverage. o Compliance with SWMP.

Tiered Approach Part II, Section B. 5. (p.12) Requirements based on UA population served: o Level 1: < 10,000. o Level 2: 10,000 – 40,000 & non-traditional. o Level 3: 40,000 – 100,000. o Level 4: > 100,000. Level does not change during permit term.

For each MCM Establish measurable goals. Evaluate / assess efforts to meet goals. Meet MEP standard for each goal. Maintain records evaluating efforts. Report progress annually. Full implementation by end of permit term.

Allowable Non-SW Discharges Part II, Section C (p. 14) Address in relevant MCMs of the SWMP Discharges listed in 40 CFR (d)(2)(iv)(B)(1) Specific potable or uncontaminated sources: o water line flushing (except hyperchlorinated) o swimming pool discharges (if dechlorinated) o runoff from landscape irrigation o incidental spray park water o street wash water o residential vehicle washing o A/C condensate

Assessment Monitor WQ to assess pollutant reductions. Evaluate social indicators / behavior change. Document progress toward goals. o Provide feedback to program management. o Ensure efficient use of resources. o Meet regulatory requirements.

Monitor Water Quality Most direct approach. Verifiable results. May focus on: o Biological – E. coli, fish, algae. o Physical – flow, turbidity, erosion. o Chemical – levels of metals, chemicals, hydrocarbons, bacteria, phosphorus and other nutrients

Public Service Drain Awareness

Social Indicators Gauge public education efforts: o Use surveys or questionnaires. o Take attendance at events or meetings. Behavior changes: o Observation. o Participation. o Increase or decrease in complaints.

Annual Report Status of compliance with permit conditions. Progress towards reducing pollutants. Summary of information and monitoring data. Evaluation of the BMPs. Assessment of efforts toward goals. Statement of activities planned.

Due Dates Within 90 days from end of permit year. Depends on 12 month period selected: o Permit issuance: December 13 – December 12. o Calendar: January 1 – December 31. o Fiscal: August 1 – July 31, etc. Reporting period/date must be consistent.. ›Existing MS4’s - 1st report includes all months since end of last reporting period. ›New MS4’s 1st report includes all months since permit effective date.

If Something Changes Depends on the nature of the change. Requires Notice of Change and revised SWMP if: o Substantive change such as replacing a structural BMP with a non-structural BMP such as street sweeping instead of inlet protection. Does not require NOC/revised SWMP if: o MS4 expands or grows, include in SWMP and report. o Replacing substantially similar BMPs. o Reorganization or personnel changes. o Corrections or clarifications.

TCEQ Investigations Basic review becomes more comprehensive w/time. Recordkeeping and Reporting. o Notice of Intent/SWMP. o Annual Reports. o Supporting data. o Noncompliance Notification – 30 TAC (9). Submitted timely. Met signatory requirements. Included required elements. Used SWMP as reference. Revised as needed w/Notice of Change and new review of SWMP.

How to be in compliance… Know the applicable sections of the permit. Communicate throughout organization. Use available resources and partners. Implement and maintain appropriate controls. Request to change SWMP when necessary. Contact the TCEQ for guidance if needed.

Read the permit… and the SWMP!

TCEQ Resources Assistance Tools for Stormwater Permitting. o Industrial. o Construction. o Small MS4s. Model Ordinance Guide. Annual Report - form Surface Water Maps. Water Quality Data. 319 Non-point Source Grant. o Focused on Watershed Protection Plans rather than MS4 boundaries.

Texas Water Development Board Clean Water State Revolving Fund. o Public entities - cities, counties, districts. o Eligible projects include: Stormwater pollution control. Wastewater recycling, reuse, treatment. Non-point source pollution control. o Low interest rate loans and loan forgiveness. o Projects added throughout the year. Contact: o o

Environmental Protection Agency Urbanized Area Maps. Training and Webcasts. Fact Sheets and Guidance: o MS4 Measurable Goals Guide. o MS4 Program Evaluation Guide. o Model SWMP. o Green Infrastructure / Green Streets. o Smart Growth. o BMPs for Industry. o Low Impact Development.

Other Resources Texas Watershed Steward. Texas Coastal Watershed Program. Center for Watershed Protection. Water Environment Association of Texas. Councils of Government. Texas Municipal League. Other MS4s.

Stormwater Permitting Program Permit and Technical Questions. ● ● ● Stormwater Permitting, MC-148. Texas Commission on Environmental Quality. P. O. Box Austin TX

TCEQ Regional Offices. Small Business & Local Government Assistance

Take Care of Texas