OVERVIEW OF THE REGULATORY STRUCTURE IN THE ELECTRICITY SECTOR IN WEST BENGAL Mr. C.R.Bhowmik, Adviser West Bengal Electricity Regulatory Commission 1.

Slides:



Advertisements
Similar presentations
Regulatory Framework and Emerging Issues Mahesh Vipradas.
Advertisements

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
Consumer protection and service quality improvement mechanisms Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
Prayas Energy Group, India NATIONAL CONFERENCE ON: “10 YEARS OF THE ELECTRICITY ACT, 2003: A CRITICAL REVIEW” SECTOR PERFORMANCE AND REGULATION Presentation.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Power Sector SCENARIO in Rajasthan Presented By: Deepak Saxena CUTS Centre for Consumer Action, Research & Training (CART)
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility)
Enhancing Participation of Consumers in Regulation Reforms in Electricity in Kenya Agnes Wachie 21 st April 2013 Nairobi Safari Club Hotel.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Prayas Energy Group, India Regulatory process to enhance transparency and accountability: examples from India Bishkek, September 2011 Presentation By Prayas.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Energy Regulation Legislation in Sri Lanka
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Electricity Reforms in Bangladesh
Small-Scale Embedded Generation (AMEU and its Work Group Input) Gerrit Teunissen 18 April 2013.
Empowering People The Electricity Governance Initiative PRAYAS- PUNE ENERGYGROUP Smita Nakhooda 11 May 2007 New York CSD 15.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
Realigning Utility Incentives Commissioner Wayne E. Gardner Pennsylvania Public Utility Commission Keystone Energy Efficiency Alliance Sept. 20, 2011.
Federal Energy Management Program Key Provisions of Current Legislation Renewable Working Group September 10, 2002 Nancy Carlisle NREL.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
1 Protection of the rights of consumers in Energy sector Malkhaz Dzidzikashvili 27 June - 3 July, 2008 Georgian National Energy and Water Supply Regulatory.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Foreign Trade (Development and Regulation) Act, 1992  Chapter I - Preliminary  Chapter II- Power of Central Govt to make orders and announce Export and.
Prayas Energy Group, India Transparency in Electricity Service Delivery: Billing, Quality of Service and consumer issues Bishkek, September 2011 Presentation.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
System design for partial liberalization on electric industry Rules related to use of networks Establishment of a fair and transparent transmission rules.
1. Mirza Hamid Hasan 29 September  Need for Regulation  Historical regulation authority and mechanism  Creation of present regulatory agencies.
Electricity Regulatory Commissions in India: Resources, Transparency and Public Participation Shantanu Dixit Prayas, Pune, India
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Institutional arrangement for energy statistics in India D. Sahoo Dy. Director General Central Statistical Organization, India.
17 November  Electricity (Amendment) Bill 2014 was put up to Lok Sabha on 19 th December 2014  It was referred on 22nd December, 2014 to the Standing.
New Challenges for the Power Sector 18 th India Power Forum On 17 th November, 2015, Hotel Imperial, New Delhi Presentation by: Shri V. S. Ailawadi – IAS.
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
MERC (Net Metering for Rooftop Solar Systems) Regulations, 2015 One Day Workshop on Grid Connected Solar Roof-top Projects in Maharashtra by MEDA.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Gints Zeltiņš Commissioner of the Public Utilities Commission of Latvia Multi-sectoral regulator: Public Utilities Commission of Latvia.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Dispute Resolution Between ICT Service Providers in Saudi Arabia
Operationalizing One Nation One Grid
INTERCONNECTION GUIDELINES
STATE ENERGY AND WATER REGULATORY COMMISSION
Overview of the Electricity Regulation Bill
Overview of the Electricity Regulation Bill
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
The Economic Regulation of Transport Bill, 2018
bihar electricity regulatory commission
Presentation transcript:

OVERVIEW OF THE REGULATORY STRUCTURE IN THE ELECTRICITY SECTOR IN WEST BENGAL Mr. C.R.Bhowmik, Adviser West Bengal Electricity Regulatory Commission 1

BACKGROUND After independence, enforcement of The Electricity (Supply) Act, 1948 led to the creation of State Electricity Boards (SEBs) who were responsibility for planning and implementing the power development programmes at the State level. The Central Electricity Authority was also constituted under the Act to deal with planning issues related to generation, transmission and distribution of electricity at the national level. In addition, as per the Electricity Supply Act 1910, private licensees were allowed to distribute and/or generate electricity in specific areas designated by the concerned State Government/ SEB. Till 1991, power generation, transmission and distribution functions were mainly discharged by SEBs enjoying monopoly power in the respective areas. 2

BACKGROUND …..(contd.) The key thrust of the governments (States and Central), during this period, was to supply low cost electricity to the consumers and ensure universal access and connect all villages to the grid. But, it became difficult for the Governments to provide the necessary infrastructure for supplying electricity at low cost. As a result, most of the SEBs ran into irrecoverable loss and huge deficits. The commercial losses with subsidy for all SEB increased from Rs. 4,117 crore in 1991 to Rs. 28,445 crore in 2001 (Economic Survey, , Govt of India). Major policy changes were made by the Government of India to trigger on the reform process in the electricity sector. 3

The Electricity Act 2003 (The Act) replaced all earlier Acts relating to power sector. One of the main objectives of the Act was also to promote efficient and environmentally benign policies in the electricity sector. The Act envisaged for promoting competition in the sector with the following important provisions - – Unbundling SEBs into Generation, transmission and distribution corporations – De-licensing the generation business – Creation of Independent (Electricity) Regulatory Commissions Provide Open Access to the transmission and distribution network to promote competition – Thrust on Non-Conventional (RE) sources and promotion of energy conservation through tariff and other mechanisms – Rationalization of tariff structure and progressively reduction of cross-subsidies In addition the Electricity Act, 2003 also emphasized on developing a National Electricity Policy and a National Tariff Policy to provide the SERCs the roadmap for chalking out appropriate regulations. BACKGROUND …..(contd.) 4

The Electricity Act, 2003 and Functions of the STATE COMMINNSIONS Major functions of the State Commission (WBERC) - Section 86 to frame Regulations pertaining to – Determine Electricity Tariff – Regulate Electricity Purchase and Sale – Promote cogeneration and generation of electricity from renewable sources by providing suitable measures for connectivity with the grid – Specify or enforce standards with respect to quality, continuity and reliability of service by licensees The State Commission shall ensure transparency while exercising its powers and discharging its functions Formation of a State Advisory Committee under Section 87 to advise the commission on – Major questions on Policy – Matters relating to quality, continuity and extent of service provided by the licensees – Compliance by licensees with the conditions and requirements of their licensee – Protection of consumer interest – Electricity supply and overall standards of performance by utilities 5

DISTRIBUTION LICENSEE ELECTRICITY CONSUMERS ELECTRICITY ELECTRICITY BILL against USAGE ELECTRICITY REGULATORY COMMISSION Framing regulations Determination of tariff Conduct of Business by the Licensee Quality of Service Components of Electricity Bill Grievance Redressal Seek consumer participation in framing regulations and Tariff 6

Notification No. & Date Some selected Regulation 9/WBERC dated This is a Notification constituting West Bengal State Advisory Committee in terms of section 87(1) of the Electricity Act, /WBERC dated West Bengal Electricity Regulatory Commission (Recovery of Expenditure for Providing New Connections) Regulation /WBERC dated West Bengal Electricity Regulatory Commission (Miscellaneous Provisions) Regulation, //WBERC dated West Bengal Electricity Regulatory Commission (Guidelines for Establishment of Forum for Redressal of Grievances of Consumers and Time and Manner of Dealing with such Grievances by the Ombudsman) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Phasing For Open Access in Distribution / Sale of Electricity) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Conduct of Business) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Open Access) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Balancing and Settlement Code) (Amendment) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Open Access) (Amendment) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Standards of Performance of Licensees Relating to Consumer Services) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Cogeneration & Generation of Electricity from Renewable Sources of Energy) Regulations, /WBERC dated West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations,

Regulation 33: Conduct of Business Regulation, 2007 Total three chapters Chapter-I (General): 1.Short title, commencement and interpretation. 2.Definitions. 3.Commission’s office, office hour and sittings. 4.Quorum for meeting. 5.Language of the Commission. 6.Secretary of the commission 7.Advisory Committee. 8.Consultant. 9.Assistance of Experts. 10.Investigation 11.Consumer Association 8

Regulation 33: Conduct of Business Regulation, 2007 Chapter –II: General Rules concerning the proceedings before the commission The proceedings before the Commission may relate to any of the following matters:- 1.Determination of tariff 2.Issue of license/ amendments/ cancellation 3.Adjudication or resolution of dispute. 4.Open access. 5.Regulation of purchase and procurement process of Electricity. 6.Investigation. 7.Complaint against contravention of Act or Rules or Regulations or Directions or Order of the commission. 8.Any other matter provided under the Act. Quorum The Commission may initiate any proceedings suo motu or on a petition filed by any affected person who can file such petition in terms of the provisions of these Regulations and the Act. Petition and Pleading before the Commission : - All Petitions to be filed before the Commission shall be type written, cyclostyled or printed neatly and legibly on white paper in six copies and every page shall be consecutively numbered. 9

Regulation 33: Conduct of Business Regulation, 2007 Chapter –III: Miscellaneous 1. Appeal under Section 127 of the Act - Appeal to be filed before the Appellate Authority by a person aggrieved by the final order of the Commission in Form – Interim order. 3. Review of the decisions, directions and orders. 4. Continuance of proceedings after death etc. 5. Publication of the petitions. 6. Confidentiality. 7. Specified fees. 8. Requisite fees shall be paid in terms of the fees regulations. 9. General order :- The Commission may pass any general order and may direct the same for publication in any news paper for protecting the interest of the consumers, the licensees and the generating companies under the Commission in the state of West Bengal. 10. Saving of inherent power of the Commission. 10

Regulation 47: Cogeneration & Generation of Electricity from Renewable Sources of Energy Issuance of Renewable Purchase Obligation (RPO) Fixing the Price caps for electricity from different sources along with the time till such prices shall remain fixed SourcePrice/KwhPeriod of validity of the Price Biomass (A maximum fuel mix of 15% conventional fossil fuel shall be allowed on yearly basis). Rs years WindRs years Small HydroRs years Grid Connected Solar PV power plants (100 Kw upto 2 Mw or more ) Rs years Roof top Solar PV sources (2 Kw upto 100 kw)-- Municipal Solid WasteRs years Bio-gasRs 55 years 11

Regulation 47: Cogeneration & Generation of Electricity from Renewable Sources of Energy Roof top Solar PV sources (2 Kw upto 100 kw) can be installed for injecting into the distribution system of a licensee only by such institutional consumer(s) like ⁻Government hospitals and health centres, ⁻Hospitals and health centres owned and run by any private charitable organization, ⁻Government and Government aided schools and academic institutions, ⁻Government offices and organizations, ⁻Any housing complex already promoted for this purpose by Government or any Government agency for the development of renewable sources, Such injection from roof-top solar PV sources of the above mentioned consumer(s) shall not be more than 90% of the consumption from the licensee’s supply by the above mentioned consumer(s) in a financial year. Such injection from roof-top solar PV sources of the above mentioned consumer(s) shall be settled on net energy basis at the end of each financial year. 12

Regulation 48: Terms and Condition of Tariff and Incentives for Promoting Demand Side Management Time-of-the-Day (TOD) Between hours and hours - Normal period - Normal Tariff; Between hours and hours – Peak period – Higher Tariff; Between hours of the same day and hours of the following day shall be treated as the off-peak period – Lower Tariff. The same tariff scheme could be differentiated based on Period of Year (Summer, monsoon and Winter) applicable only for generating companies, one licensee selling power to another licensee, or any specified class of consumer. If due to such tariff differentiation, any variation in the licensee’s revenue earning exceeds its aggregate revenue requirement, such excess revenue earning shall be treated as an incentive to the licensee. Power factor Rebate / Surcharge Load Factor Rebate / Surcharge 13

Scope for Consumer Participation 1.Tariff Determination Process – Step-I: Generators and Licensees submit tariff petition indicating total Aggregate Revenue Requirement (ARR) of the control period as per Tariff Regulations with all necessary supporting documents in the office of the Commission. – Step-II: Gist of the tariff petition with the approval of the Commission then published by the Generators and Licensees at least in three news paper (Bengali,English,Hindi) inviting comments/suggestion within some specified days and time. – Step-III: Comments/suggestions/objections received within due date are considered before tariff determination by the commission. – They are mentioned in brief with comments of the Commission in the tariff order of the Commission. Tariff order is issued within 120 days from receipt of the petition following detailed procedure indicated in the Tariff Rugulations. 14

Scope for Consumer Participation 2. Framing Regulations – SERCs frame regulations based on notifications/guidelines/regulations framed by CERC. – The draft regulations are uploaded at the website of the SERC – Comments are sought from the consumers/consumer groups by publishing relevant information in the local dailies (English, Hindi and Bengali) – Comments received are then considered while finalising the Regulation 15

THANK YOU 16