Cindy Miller – 214.325.3646 Cindy Frey – 214.563.9738 www.cbdfw.com 2900 Ridge Road Rockwall, TX 75032.

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Building Codes, Zoning Ordinances
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
Construction in the Future
Headquarters 565 Electric Road, Salem, VA TEL (540) FAX (540) California Office 8665 Argent.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
eQuest Quick Energy Simulation Tool
CON 4003 Construction Estimating Prof R. V. Locurcio.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Civil Engineering & Architecture 2.3 Residential Design.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Blue Prints.
A Revolutionary New Panelized Construction System Steel frame panels for each project are built in CHS’s manufacturing facility and delivered to job-site.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Carpentry Basically a person who builds or repairs wooden structures, as houses, scaffolds, or shelving.
Chapter 8: House Construction
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Finishing the Building
Construction Drawing Occupational Safety and Fundamentals
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
presents 5080 Meridian Street Pre-Construction Appraisal performed March 2009 $1,650,
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Affordable housing project
 Overview of Interior Finishes  Types  Examples.
Property Inspection & Analysis: The Improvements
Technology Of Today Mr. Plansinis.  Is the design and building of structures.  Is not limited to buildings. Can be dams, highways, canals, waterways,
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Estimating and Scheduling CEE 492
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
Final half of the semester Putting theory into practice 1.
Rosemead.
The art and science of designing and construction of buildings.
Highveld Industrial Park Workshop No. 13 Information Memorandum
How Completed Interiors Are Achieved: Designing & Building
Construction Documents
Design of a Commercial Shopping Center
(Refer to Chapter 2 of the textbook)
Multistory Office Building
Designing a Commercial Shopping Center
Design of a Commercial Shopping Center
New Morehead State Bowling Facility
Decisions and considerations of choosing or building a new home.
ISA Prime Developments
The Bond Street Wharf Baltimore, Maryland
2 Southville Road | Southborough, MA
Components of Construction
INDUSTRIAL / COMMERCIAL Facility For Lease
1 Semester Project Design A Multi Story Office Building
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
House Construction Budget Plan
Master Facilities Committee Evaluation and Identification
© OnCourse Learning.
Excellent Investment Opportunity R66 Business Center – For Lease
FARR’S BUILDING APARTMENTS
Presentation transcript:

Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX 75032

Mann Glass Company P R E S E N T S

Mann Glass has been in business for 45 years as a manufacturer of custom glass. Mann Glass sits on acres with approximately 180 feet along the South line of Ferguson Road. The property has a 15,698 square foot NRA single tenant industrial building that was built in The property is well located with visual from I-30 and is designed with adequate considerations for utility and functional factors related to tenancy. Information herein deemed reliable but not guaranteed. Clients please very information.

Site Description Location: 7318 Ferguson Road Dallas, TX Size: Acres or 93,785 square foot Street Frontage: Approximately 180 feet along the South line of Ferguson Road Visibility: Interstate Highway 30 and Ferguson Road Permitted Use: Examples – Retail – Commercial Development – Light Manufacturing Utilities Water – City of Dallas Sewer – City of Dallas Electricity – TXU Telephone – Southwestern Bell Gas – Atmos Energy Highest and Best Use: Light Industrial Manufacturing Facility/Warehouse Facility

Photos $4,000,000

Photos 15,698 Industrial Building with office space Manufacturing Equipment

Photos Glass and Equipment Warehouse Area Warehouse Cutting Area

Photos Polishing and Cutting Equipment Warehouse Holding Space

Photos Manufacturing Equipment

Photos 1999 Half Ton Dodge Glass Delivery Truck Cutting Tables

Photos Manufacturing Equipment I-30 and Ferguson Road View

Photos 1999 Half Ton Dodge Glass Delivery Truck Drive Up Entrance and Extra Storage Area

Description of Improvements The property improvements consist of a 15,698 SF (NRA), single-tenant industrial Building. The property is known as 7318 Ferguson Road and contains a one story building. Please refer to site map for further information. Other site improvements include sanitary sewer and other utility lines, building-mounted lighting and concrete access drives. The following is a summary description of basic components of the Property improvements. Structural components and those not readily visible have been estimated based on discussions with informed sources and/or local construction standards: Improvements: 15,698 square foot NRA single-tenant industrial building Year Built:1974 Foundation:Reinforced concrete slab and footings on compacted gravel and composite base Frame:Concrete and structural steel construction Exterior Walls:Concrete Roof Structure:Exposed structural steel joists and metal roof deck supporting a flat roof system Interior Walls:Concrete and fire rated gypsum wallboard in office and bathroom, concrete walls in shop area.

Description of Improvements Exterior Lighting: Building-mounted lights Interior Lighting: Fluorescent commercial fixtures and high power sodium ceiling mounted fixtures in the shop. Fluorescent and incandescent in bathrooms and office HVAC: Gas fired space heaters in the shop area and only fans for circulation. Small package HVAC system for the offices Doors and Windows: Type commercial grade steel and aluminum with steel frame roll up shop doors. Metal and hollow wood doors with metal/glass or wood frames throughout Electrical: Typical high demand commercial service Plumbing: All plumbing systems are assumed to be in compliance with city code Floors: Interior floors in public area have vinyl tiles, carpet and finished concrete floors in shop areas Restrooms:Adequate facilities have standard commercial grade fixtures including commercial type toilets and u rinals

Site Map

Area Neighborhood Map

Inventory List BRT Beveller 10/89 - $52,614 ELB Polisher /91 - $73,000 ELB 17 4/01 - $113,660 Zanetti Diamatic Edger 8/95 - $19,750 Model Master Bevel – 1500 x /04 - $202,045 ELB-10 12/95 - $ Woods Cup Model MR49LAC 10/95 - $2,285 CNC Cutting Table 1/98 - $92,000 CAMBI 1/99 - $26,000 Bovoni Mini Max – 361+1S 6/99 - $78,900 Nissan Fork Lift 4/ $18,186 Matrix Equipment 5/04 - $16,186 Salem Equipment 12/04 - $4,500 Office Furniture 3/07 - $2,690 Computer Equipment 9/02 - $5,217 Copier 3/01 $500 Bavelloni TM4 12/98 - $6,000 Numerous Other Equipment 2003 ¾ Ton Single Glass Truck w/Rack 2008 Chev ¾ Ton 4 Door Diesel * Buyer to verify all inventory * Complete list of inventory upon request