1 Corridor Cities Transitway Presented to: Amberfield HOA January 15, 2015.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
ATN Applications: Montgomery County, Maryland Transit Opportunities Advanced Transit Association Annual Technical Meeting January 11, 2014 College Park,
Maryland Transportation Builders and Materials Association November 20, 2013.
This is my “focus” slide, used to make sure that I’m getting the sharpest possible picture on the projection screen. It is the 1954 Freeway Plan for the.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
Twinbrook Sector Plan A New Community in the Technology Corridor
East Bay Bus Rapid Transit Project Description August 11, 2011.
Dudley Square Complete Streets Design Project Public Meeting #1 October 22, :00pm – 8:00pm Boys & Girls Club of Boston Yawkey Club of Roxbury.
9/7/2012 MBS UU.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
MBTA Key Bus Route Improvement Program Joanne Haracz, AICP responsive client solutions since 1976 Pennsylvania Public Transportation Association April.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Lecture 6 Bus Rapid Transit, design elements and operational issues Dr. Muhammad Adnan.
Kansas City BRT Metro Area Express (MAX) TRB BRT Conference, July 21, 2008.
Transit “New Starts” Background and Status Transit Task Force Montgomery County March 2011.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Steering Committee Meeting Presented to Montgomery County Department.
Transit Signal Priority Work Group Report 7/30/13
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
Euclid Corridor Design TRB BRT Workshop July 21, 2008.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Land Use Impacts of Bus Rapid Transit: The Boston Silver Line Victoria Perk, Senior Research Associate National Bus Rapid Transit Institute Center for.
The Potential BRT in Asia
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Use of a Charrette in BRT Station Area Planning Thomas W. Williams, PE AECOM / Sr. Project Manager Grand Rapids, Michigan QUALITY TRANSIT ― NOW.
BRT as a Precursor of LRT? Lyndon Henry Data Analyst Capital Metro Austin, Texas TRB/APTA Joint Light Rail Transit Conference Los Angeles 20 April 2009.
Rapid Transit System Steering Committee Meeting December 4, 2012.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Land Use Study for the Community of Winchester July 9, 2012.
Mark Phillips BSDA/Metro Long-Range Planner. The Foundation: Moving Transit Forward.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Service Planning and Integration Study Work Group Report 7/30/13.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Initial Applications for Automated Vehicles on Exclusive Roadways Advanced Transit Association Annual Technical Meeting January 11, 2009 Washington, DC.
1/30/03 Page 1 Rescue Muni’s Recommendations for Geary Rapid Transit For PAR 1/30/2003.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
City of Alexandria, Virginia Crystal City Potomac Yard Transitway Montgomery County Rapid Transit Steering Committee April 30,
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
TRB/APTA 2004 Bus Rapid Transit Conference The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
DICK RUDDELL EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
16 TH S TREET M ALL RTD B OARD OF D IRECTORS S TUDY S ESSION M ARCH 31, 2015.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
RIVERFRONT TRAILS CLOSED
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
City of Alexandria Virginia Transportation and Environmental Services
D Line Project Overview
Presentation transcript:

1 Corridor Cities Transitway Presented to: Amberfield HOA January 15, 2015

Project History I-270/US 15 Multi-Modal Corridor Study – Highway needs too great – Inclusion of the Corridor Cities Transitway – DEIS, AA/EA, SEA – Independent Utility 2

Locally Preferred Alternative Governor O’Malley: May 11, 2012 Mode: Bus Rapid Transit – 2 lanes – Exclusive guideway – Hiker/biker trail 16 mile alignment – Shady Grove to Metropolitan Grove (9 mile Phase I) Maintenance Facility: Near Metropolitan Grove Phased Construction 3

What is BRT? LRT on Rubber Tires Modern, low floor vehicles Multiple door entry Advanced fare payment Varied runningways Stations Signal priority/preemption Real-time transit info High frequency service Operates on intervals, not a timetable Branded – recognizable and distinct 4

Operations CCT Direct Service and CCT via USG Ridership – 36,000 trips per day in 2035 Design year headways – 3.5 minutes peak – 6 minutes mid-day – 10 minutes off-peak Bus Fleet – 60 ft articulated, low floor, clean diesel hybrid-electric – 39 total buses 5

Current Schedule August 2014 – Draft EA and 15% Design Submittal August 2015 – 30% Design September 2015 – FONSI Winter 2015/2016 – Initiate design activities Winter 2016/2017 – Begin Right-of Way Acquisition/ Permitting/ Agreements Spring 2018 – Begin Construction 2021 – Begin Service 6

Transitway Alignment Nine miles exclusive right-of-way Side running along SHA and Montgomery County roadways Median running on Montgomery County and City of Rockville roadways Limited roadway reconstruction since alignment is through planned or future developments 7

Transitway Alignment 8

9

Typical Sections 10

Follow-up Questions Rick Kiegel MTA Office of Planning and Programming

Station Architecture 12

Station Prototype Platforms - 150’ X 18’ Entrances - Primary & Secondary Canopy - 60% coverage Amenities – ticketing, benches, etc. Ancillary enclosure 13

Concept 1: Surface Station Framework Establish presence Column free platform Clarity Safety Translucent canopy W-section primary frame HSS canopy grid 14 02_PLATFORM VIEW 01_AERIAL VIEW

Concept 1: Aerial Station Framework Community Space Vertical Circulation Establish presence Column free platform Clarity Safety Translucent Canopy W-section primary frame HSS canopy frame 15 01_PLAZA LEVEL VIEW 02_STREET LEVEL VIEW

Concept 2: Surface Station Helix Contextual influence: Bioscience Helix as generative form Translucent Canopy Tree Structure Concrete column Steel Pipe Frame 16 02_PLATFORM VIEW 01_AERIAL VIEW

Concept 2: Aerial Station Helix Community Space Vertical Circulation Contextual influence: Bioscience Helix as generative form Tree Structure Concrete column Steel Pipe Frame 17 01_PLAZA LEVEL VIEW 02_STREET LEVEL VIEW

Operations and Maintenance Facility 18

Operations and Maintenance Facility Secure Site Counter-clockwise circulation : Site lines Parking for initial operations Efficient & safe user/bus circulation 19 01_CIRCULATION DIAGRAM

Traffic Signals Total of 37 signal: 19 new, 17 rebuild, and 1 active control Transit Signal Priority installed corridor wide Current plans show existing and proposed above ground elements Traffic signal plans will be reviewed by SHA, MCDOT, and City of Rockville 20

Traffic Signals Transit Signal Priority Concept of Operations Currently Being Developed: – Focus: maintain correct separation between buses – Priority will be conditional: applied only when issues occur – Potential priority given: green extension at end of cycle or red truncation at beginning of cycle – Warrant analysis: determine where TSP will be installed » Based on intersection V/C 21

Urban Design Station Area Concept Specialized pavement areas Pedestrian lighting Crosswalk treatments Transitway treatment Community signage Projectwide Transitway treatment Finish for structures: MSE walls, retaining walls, portals Crosswalk treatment Wayfinding signage 22 01_Metropolitan Grove