M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna

Slides:



Advertisements
Similar presentations
17 February 2010 The Silicon Vertex Detector of the Belle II Experiment VCI 2010 M.Friedl, T.Bergauer, I.Gfall, C.Irmler, M.Valentan (HEPHY Vienna)
Advertisements

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
The Silicon Vertex Detector of the Belle II Experiment
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.

21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
The Silicon Vertex Detector of the Belle II Experiment
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Noise and Capacitor M.Friedl, R.Thalmeier, H.Yin (HEPHY Vienna) 24 September 2015.
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Kodali Kameswara Rao TIFR, Mumbai
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
25 Oct 2011 The Silicon Vertex Detector of the Belle II Experiment IEEE NSS 2011 Thomas Bergauer (HEPHY Vienna) Valencia.
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
DSSD update. 2Manfred Valentan, 3 rd Open Meeting of Belle27-9 July 2009 Outline DSSD design in Vienna: How it is done First test batch of SVD DSSDs Status.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
APV25, Clock and Trigger M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)18 Mar 2009 APV25 Please refer to my December 2008 meeting slides for details.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
The medipix3 TSV project
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L. Bosisio - 2nd SuperB Collaboration Meeting - Frascati SuperB SVT Update on sensor and fanout design in Trieste Irina Rashevskaya, Lorenzo.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
Markus Friedl (HEPHY Vienna)
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
Hybrid Pixel R&D and Interconnect Technologies
Comments to the SVD4 structure
APV25, Clock and Trigger M.Friedl HEPHY Vienna.
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna APV25 & Origami Status M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna

APV25 Purchase & Thinning 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Markus Friedl (HEPHY Vienna) APV25 Purchase Current Belle purchase 1500 diced „normal“ APV chips (~300µm thick) 2500 uncut APVs on wafers (for thinning) Future order 1000 more „normal“ APVs which did not fit in current purchase due to financial limits 8 wafers with a total of 2674 known good dies were delivered to Vienna on 9 Jan 2009 One wafer contains 360 APVs in total Each chip was tested on the wafer, yielding an average of 93% good dies The 1500 normal APVs are at KEK, financial transaction underway 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Markus Friedl (HEPHY Vienna) APV25 Wafer Inspection APV25 wafers (8") Wafer map showing test results (used to ink mark bad dies on wafer) More photos: http://www.hephy.at/gallery2/v/electronics2/8inchwafer On 19 Jan 2009, we sent 1 wafer (319 good dies) for Thinning (100µm target), dicing and waffle packing Received back on 4 Feb 2009 105µm (nominal) thickness 314 (out of 319) good dies (= 98.4% yield) 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Inspection of Thinned APVs Thickness measurement (Mitutoyo CMM) Waffle-packed thinned APV chips More photos: http://www.hephy.at/gallery2/v/electronics2/1stwaferthinned 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Investigation of Thinned APV25 Chips Thickness measurement: 106.6 +/- 3.2 µm Thin dies are still quite rigid, easy handling  thinning mechanically OK Mounting 16 thinned chips on hybrids + 4 normal chips for electrical measurements All perform equally well  thinning electrically OK Next step: populate 2 Origami modules, one with normal, one with thinned APVs If again no difference, we will proceed with thinning all the chip-on-sensor wafers 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Markus Friedl (HEPHY Vienna) SVD Layout & Origami 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Possible SuperSVD Layout 4 layers of double-sided strip sensors Double-layer of DEPFET pixels More on the layout by Thomas Bergauer Geometry optimization is underway Pixel double-layer using DEPFET Strip layers extend to r~14 cm (presently 8.8 cm) Every sensor is read out individually (no ganging) to maintain good S/N  Origami concept for inner DSSDs (red) 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Origami Chip-on-Sensor Concept Total material budget: 0.72% X0 (cf. 0.48% for conventional readout) Kapton hybrid design for 4“ sensor done, being manufactured now Design for assembly jigs is ongoing Module to be constructed in April 2009 (readout connections not shown) 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Markus Friedl (HEPHY Vienna) Origami – 4" DSSD Layout Connectors (on both sides) 2 p-side APV chips 2 p-side APV chips 4 n-side APV chips 3-layer flex hybrid design p- and n-sides are separated by 80V bias n-side pitch adapter is integrated in hybrid ordered at CERN PCB workshop, expected back ~end of March Animal farm (mascots: cat MF, eagle SS, bat CI) Flex fanouts to be wrapped around the sensor edge 18 Mar 2009 Markus Friedl (HEPHY Vienna)

APV25 Trigger, Clock and Dead Time 18 Mar 2009 Markus Friedl (HEPHY Vienna)

No External Restrictions 12.8 25.9 Min Lost: too little distance between triggers (6 clocks min.) FIFO Lost: too many pending readouts (filling APV25 buffers) Nakao-san wishes <3% dead time @ L1=30kHz  OK (0.87%) for 42.4MHz clock, slightly higher (3.43%) at 31.8MHz 18 Mar 2009 Markus Friedl (HEPHY Vienna)

External 500ns Dead Time Requirement (ECL) 11.4 24.0 Nakao-san‘s wish (<3% dead time @ L1=30kHz) met in both cases  0.42% for 42.4MHz clock and 2.7% at 31.8MHz 500ns dead time (as required by ECL) not accounted for APV25 Hence minimum lost figure is always zero 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Markus Friedl (HEPHY Vienna) Summary & Outlook APV Thinning 1st wafer successfully thinned (16.6 µm) Electric sample (~5%) tests are fine Remaining APV wafers to be processed after successful tests on Origami Origami Status flex circuit design submitted for fabrication at CERN, expected back ~end March 2009 Jig design underway, will assemble in April Dead Time Always <3% dead time with both 42.4 and 31.8 MHz clocks in case of 500 ns dead time requirement (ECL) 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Markus Friedl (HEPHY Vienna) Backup Slides 18 Mar 2009 Markus Friedl (HEPHY Vienna)

Markus Friedl (HEPHY Vienna) Origami Concept Extension of chip-on-sensor to double-sided readout Flex fan-out pieces wrapped to opposite side (hence “Origami“) All chips aligned on one side  single cooling pipe Side View (below) 18 Mar 2009 Markus Friedl (HEPHY Vienna)