P ROJECT D ELIVERY M ETHODS. EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents.

Slides:



Advertisements
Similar presentations
Instruments and development needs
Advertisements

Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr. Judit Gyulay – Dr. Zoltán András Vattai BUTE Department of Construction Technology & Management.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.
European Federation of Engineering Consultancy Associations Presentation September 2009.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
EU SME policy The “Small Business Act” for Europe and its Review
AN INDUSTRY PERSPECTIVE OF THE CIDB PROCESS Transport, Housing, Public Works, Local Government & Provincial Affairs, Water Affairs & Forestry.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Analyzing of Japanese Construction Industry from the Viewpoint of International Desk of Construction Professor. Dr.-Eng. Shizhao DING Research Institute.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
International Federation of Consulting Engineers Session 10: Integrity/Corruption Dr. Jorge Díaz Padilla.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
10.1 Identify Stakeholders
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
ETHICS AND CODE OF CONDUCT: THE NIGERIAN INSURANCE INDUSTRY EXPERIENCE CIIN PROFESSIONAL FORUM 2013 THOMAS O S, NIA NIA.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Copyright ©2004 Pearson Education, Inc. All rights reserved. Chapter 18 Asset Allocation.
Date Supplier Engagement models Traditional Delivery Partner Alliance Limited Partnership DBOM Limited Partnership Outsourcing Supplier Engagement.
The Art of QBS Qualifications-Based Selection (QBS): Procuring Intellectual Services the Smart Way Claude Paul Boivin, ACEC Canada Title #1.
Procurement Systems ARBE121 – PROCUREMENT OPTIONS “The organisational structure adopted by the client for the management of the design and construction.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
EVCA Guidelines and Good Practice in the Management of Privately Held Companies in the Private Equity and Venture Capital Industry 28 June 2005 Second.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
European Federation of Engineering Consultancy Associations.
Development through partnership Construction Industry Development Board Kwena Mokobane 21 June 2013.
Public Private Partnerships Virginia Concrete Conference March, 2011 Public Private Partnerships Dan Dawood, P.E. (PA)
Embedding Sustainability in the Supply Chain Philip Duddell, Sustainable Procurement Limited 10 th September 2015 Conference.
Contact Monitoring Regional Network (CMKN). Why procurement It is estimated that an effective public procurement system could save as much as 25% of government.
Planned Commission Communication on the role of the Private Sector in Development A contribution to the reflexion on How to Innovate International Cooperation.
PPP International Best Practice and Regional Application Overview of Public Private Partnerships (PPPs) April, 2008 Tegucigalpa, Honduras Filip Drapak.
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
CCG Strategy Review Workshop Procurement Theme Group Charles Mills April 30 th 2015.
Dr Denis McBrinn, Development Director, NI Supply Chain Management Best practice and Codes of Conduct.
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
WELCOME TO SKOL The Finnish Association of Consulting Firms SKOL SKOL is a professional and employers' organization for independent and private.
INSTRUCTOR'S MANUAL Chapter 3 ESTABLISHING A BUSINESS.
Methods to enhance site viability Some examples.. Joint venture approaches/risk sharing Local investment models – e.g.TIF Value engineering.
Introduction to DBFM & the bank’s point of view 9 December 2014.
African Institute of Corporate Citizenship founded in Ethos Institute’s 2006 International Conference Government and market social.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
European Economic and Social Committee ACP -EU Private Sector – Engine for Development Brussels October 31, 2014 Ivan Voleš.
Reforming Public Services - views from the voluntary sector Daniel Fluskey National Council for Voluntary Organisations Contact:
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Cooperation with Lobbying Monthly newsletter Annual publication Other issues Intro “MiFID and Regulated Markets” Ludovic AIGROT Chair of the FESE MiFID.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
BIMILACI 2007 Best Practice Procurement of Engineering Services Washington, D.C. May , 2007 Gregs Thomopulos, P.E., FACEC Executive Committee Member,
BEST East – Introduction Developing the capability to deliver more with less Neil Jarrett CWC.
Fostering Valorisation of Publicly Funded Research Dr Pat Frain
CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr
HELLASCO CONFERENCE 2017 The recent developments in the external aid consulting sector September 29, 2017 Ines Ferguson, Chair of EFCA European.
PROJECT DELIVERY METHODS
International Conference of the Slovak Chamber of Auditors
Joint CIB W099 &TG59 International Safety, Health & People In Construction Conference AN EVALUATION OF COLLABORATIVE PRACTICES IN CONSTRUCTION CONSTRACTING.
PROJECT DELIVERY METHODS
Adriana Spassova FIDIC Accredited Trainer & Adjudicator
Alain Bentéjac, FIDIC President
INTERNATIONAL INDUSTRIAL RELATIONS & THE GLOBAL INSTITUTIONAL CONTEXT
Aim of this lecture The determinants of demand and supply on construction industry Various market structures Construction market structure The relationship.
Presentation transcript:

P ROJECT D ELIVERY M ETHODS

EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents 26 professional associations from 26 European countries Represents FIDIC in Europe aspires to positively influence EU legislation that impacts on the engineering consultancy promotes fair competition and transparent procurement rules is a network/business platform for member associations and European firms requires all its members to comply with its Code of Conduct which governs the performance and quality of service offered by the member firms

Project delivery methods will affect our business Integrated project delivery methods bring new business opportunities for Engineering Consultants Engineering Consultants can play several roles in the extended supply chain But Engineering Consultants need more strength for higher and other risks The firms have to adapt to seize the opportunities!

Potential positions, roles and tasks in the supply chain

Standard project organisation for built assets

Variety of new project delivery methods for built assets 1.Traditional design-bid-build contracts 2.Integrated management contracts 3.Integrated design and engineering contracts 4.Integrated design and build contracts 5.Financed integrated design and build contracts

General remarks Each project delivery method comes with specific contracts with variation on obligations, risks, liabilities and way of remuneration Working for both clients and contractors in different project stages can easily result in a potential conflict of interests Engineering Consultants have to cherish their position as trusted advisor to each client! Characteristics of the various project delivery methods

1. Traditional Design-bid-Build Contracts

1. Traditional design-bid-build contracts Role(s): consultant and designer for the client, supervisor to the contractor Remuneration: fee based or lump sum Expectation: trusted advisor, make your best effort, minimize risk for the client Liability: restricted, own risk low Types of contracts: general contracting, subcontracting, trade contracting

2. Integrated Management Contracts

2. Integrated management contracts Role(s): project manager, programme manager, budget and scope manager, client role to the subcontractors Remuneration: fee based, maximum amount Expectation: delegated responsibility from the client, minimize risk, delivery within scope, time and budget Liability: restricted, own risk low Types of contracts: Project management, Design management, Construction management, Facility management, Programme management

3. Integrated Design and Engineering Contracts

3. Integrated design and engineering contracts Role(s): consultant and design integrator for the client, design manager and supervisor to the contractor Remuneration: lump sum, bonus/malus Expectation: minimize risk for the client, fully responsible for the design and construction management Liability: less restricted, own risk high Types of contracts: Management Contractor, Total Engineering, Target Fee Contracting, PD/DM/CM

4. Integrated Design and Build Contracts

4. Integrated design and build contracts Role(s): project definition and procurement consultant for the client. Design partner or engineering subcontractor for the D/B Contractor Remuneration: fee based or lump sum. Often low margins with a win fee from the contractor Expectation: successful procurement for the client. Winning design for the contractor and predictable building costs Liability: restricted, normal risks Types of contracts: Design Build, Alliancing, Turn Key

5. Financed integrated Design and Build Contracts

5. Financed integrated design and build contracts Role(s): project definition for the client, consultant to the banks, design manager, facility manager, engineering subcontractor, etc. Remuneration: fee based, lump sum, dividend on own investment, service fee etc. Expectation: minimize risk for the SPV, fully responsible for the design, facility management, etc. Liability: less restricted, own money at risk. High procurement costs and risks Types of contracts: PPP, PFI, DBFM, DBFMO