VeriSTAR Project Management Intoduction

Slides:



Advertisements
Similar presentations
and Food Safety Management System Certification
Advertisements

AXSYS TECHNOLOGIES LTD THE POWER OF PURE EXPERTISE Machinery Maintenance Crew Management Quality, Health, Safety, Environment.
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Sail marine Consultancy is to provide high quality marine surveying and consulting services with an emphasis on safety and integrity. Sail marine Consultancy.
Program Management Portal: Overview for the Client
Statistical Process Control for the Medical Industry.
ISO 9001 : 2000.
4.0 Reference Data (4.0 Transactional vs. Reference Data & 4.0 Types of Reference Data) After this class, you will be able to: Understand the concept of.
HACCP Manager Software™
CSE 308 Project Management. SWE Communication Skills Management: Run a team meeting Presentation: Present aspects of your project during its development.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Quality Management System
Jw consulting SAP R/3 QM Workshop Rheinfelden Kurt Fantes Prototyp jw LIMS.
Surveyor's certification scheme
Class and Statutory Surveys
Role of Surveyor. 2 Role of Classification Societies ► The mission of Classification Societies is to contribute to the development and implementation.
Introduction to SAP R/3.
SharePoint Collaboration Features & Workflow
ISO 9000 Certification ISO 9001 and ISO
Tracker Web Server Integrated with Tracker Complete compliance management tool Drill-down by project, site, building, date, work type Action management.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
PROACTIS: Supplier User Guide Contract Management.
ISO 9000 Introduction Imran Hussain.
Professional Informatics & Quality Assurance Software Lifecycle Manager „Tools that are more a help than a hindrance”
Structure Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 STRUCTURE COMMANDER Introduction Product Overview.
SQA Work Procedures.
Quality Policy Quality_Policy.ppt Rev. 2.
Even More SQA: Work Procedures
A PRODUCT COPYRIGHT © 2014 PATENT PENDING
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
CS 4310: Software Engineering
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
BVN GM7 – Code of Ethics Head Office – Department Technology Equipment - V1 – April 2009.
DNS Quality Plan. 2 Three main axes : Measures to improve the quality of our services Measures to improve the quality of our fleet Measures to enhance.
VPM Product certification Design Review February 2009.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Training Your Users Introducing new Staff, Students and Employers on the system.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
National Enterprise-Wide Statistical Systems (NEWSS) NURUL EFFA AHMAD DEPARTMENT OF STATISTICS MALAYSIA 26 April 2010 Meeting on the Management of Statistical.
Moodle and Virtual Learning An Introduction. What is Moodle?
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
QuickSuite VIP-QuickSuite: A Collection of tools designed to adjust to solve your company needs.
ST Quality WG I. Béjar Alonso Group Leader’s meeting 6th July.
Authorized economic operator Minimizing risks, optimizing flows.
Robert Aydelotte ExxonMobil - Upstream Technical Computing 13 May 2004 Standardizing Fluid Property Reporting.
RECENT DEVELOPMENT OF SORS METADATA REPOSITORIES FOR FASTER AND MORE TRANSPARENT PRODUCTION PROCESS Work Session on Statistical Metadata 9-11 February.
The Claromentis Digital Workplace An Introduction
© ABB Inc. - 1 A robust portfolio of interoperable solutions Getting started with Industrial IT Certification Document# 3BSE042726, September 2005.
Process Based Integration Approaches and Standards.
Impacts of implementation of 4PM Vesna Kobal, Arctur d.o.o. Rijeka, april 2014.
CONTRACT CONTROL. IPM Global – Why IPM Exists We believe Project Management Software should be easy to use. We believe Software should be flexible, and.
Zespół Szkół Nr 1 w Lubinie ecom4s2p Name of the tool: Internet based e-learning platform, providing easy to use tools for learning and collaboration online.
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Aeronautical Information Services Provider.
Customer Story: Paperless Environment with Laserfiche RIO Abdul Aziz Al Angari Director of IT Department.
Quality Management: Mutually beneficial supplier relationships.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
MICROSOFT DYNAMICS® AX
ISO/IEC
AUDIT & INSPECTION MANAGEMENT TOOL NOTICE Change background image :
UNIT V QUALITY SYSTEMS.
Quality Management Systems – Requirements
NAME 217: Theoretical Ship Design
Choosing a GFSI Recognized Standard
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

VeriSTAR Project Management Intoduction February 2009

Table of content 1- What is VPM ? 2- Main objectives 3- Features 4- Animation 5- VPM Introduction

What is VPM

What is VeriSTAR Project Management ? A WEB based collaborative platform for Project management where all actors ( depending on assigned rights) can review, edit and exchange information on real-time basis. . Initially developped, within Marine Division of Bureau Veritas, for the management of New construction and its transversal activities, it has been extended to some specific activities of Ship in Service www.Veristarpm.com VPM Introduction

Main objectives

VPM Efficieny increase Quality Added services improvement to client Main objectives of VPM Efficieny increase VPM Quality improvement Added services to client VPM Introduction

- Increasing the efficiency of our services : Main objectives - Increasing the efficiency of our services : - introducing a production tool - Sharing Data (Collaborative Platform) - Changing from a Reactive attitude to a Creative approach - Improving the Quality - Pertinency: using relevant references and data - Traceability: Keeping trace of our interventions - Transparency: Open to all actors - Eliminating the redundancies - Service plus to Clients - Opening access to the concerned projects - Communicating thru BV working Platform - Managing additional services not related to Classification VPM Introduction

Features

Features: Type of projects Different type of projects handled by VPM includes: - New construction of Ships / Offshore platforms (NC) - Design assessment (DWG, PDR) - Product certification (PRC) - AIS ( Alternative Scheme of Inspection) - NDC ( Non dedicated certification: Non linked to a project) - Conversion of units ( NS) - Follow up of the maintenance on existing vessels/Platforms ( Asset Integrity Management System: AIMS) VPM Introduction

Features: Global approach FOR ALL TYPE OF PROJECT CONTRACT REVIEW: - Identification of clients - Definition of the required services - References to apply - Actions and tasks to perform PERFORMANCE - Identification of actions, management of outstandings REPORTING: - Report - Certificates, INVOICING DASHBOARDS FEED BACK VPM Introduction

WWW.Veristarpm.com Independent project New construction Shelf Products Reference: Request for Classification (Class &Statutory) Reference: Customer requirements Reference: Suppliers requirements NC NS, PRC,AIS PDR,DWG NDC Automatically generated Project and manually customized Manual entry Manual entry Survey at yard Design review BVN Product Certification SAY LPO Follow up / Certificates / Reports Ship in service VPM Database VPM Introduction

Features: Actors BV Actors External Actors Project leader / manager Product Certification (BVN) Design review (LPO) Survey of Construction (SAY) External Actors Owner Shipyard/Consultant Applicant for Product certification Equipment supplier VPM Introduction

New construction projects

Features: BASIC CONCEP FOR NEW CONSTRUCTION A Project is managed through its complete lifecycle - Definition of the contract :"Project data" - Validation of the conception: "Design review" activity - Certification of the Material / Equipment:" Product certification (BVN)" activity - Survey of the Construction: "Survey At Yard" activity - Delivery & transfer of Ship's file to "Ship in service" VPM Introduction

Animation

VeriSTAR Project Management New Building Project Setup Actions Exchange of Documents Not covered by NB BV Marine contact Owner Yard Manufacturer New Construction VPM Introduction

VeriSTAR Project Management New Building Owner Yard Manufacturer Request For Class New Construction BV Project leader Creates Request Assigns P L VeriSTAR Project Management New Building Project Setup Actions Exchange of Documents Not covered byVNB BV Marine contact VPM Introduction

VeriSTAR Project Management New Building BV Marine contact Owner Yard Manufacturer Request For Class New Construction Initiates Projects Creates Request Assigns PL VeriSTAR Project Management New Building Project Setup BV Project Leader Actions Exchange of Documents Not covered by NB VPM Introduction

Product Certification VeriSTAR Project Management New Building Project Setup Actions Exchange of Documents Not covered by NB BV Marine contact Owner Yard Manufacturer Request For Class Initiates Projects Creates Request Assigns P L BV Project Leader New Construction Customizes projects Registers documents Assigns BVN centres Assignes Contacts Monitors progress Generate progress reports Checklists (customized) LPO SAY BVN Design Review Survey At Yard Product Certification VPM Introduction

Product Certification VeriSTAR Project Management New Building Design review Actions Exchange of Documents Not covered by NB BV Marine Manager Owner Manufacturer Request For Class Initiates Projects Yard/Consultant Creates Request Assigns PL BV Project Leader New Construction Customizes projects Registers documents Assigns BVN centres Assignes Contacts Monitors progress Generate progress reports Checklists (customized) LPO Registers drawings Reviews drawings Generate progress reports Records status, comments Identifies categories) SAY BVN Design Review Survey At Yard Product Certification VPM Introduction

Product Certification VeriSTAR Project Management New Building BVN Actions Exchange of Documents Not covered by NB BV Marine Manager Owner Yard Manufacturer Request For Class Initiates Projects Creates Request Assigns P M Request for Certification Purchase orders (Short list) Advise Manufacturer BV Project Leader New Construction Customizes projects Registers documents Assigns BVN centres Assignes Contacts Monitors progress Generate progress reports Checklists (customized) LPO Registers drawings Reviews drawings Generate progress reports Records status, comments Identifies categories Create product folder for shelf products Identifies products in a project Initiate design review Submits drawings to LPO Creates/ manages comments Completes product folder Generate reports of inspection Issues certificates Product Design Review SAY BVN Design Review Survey At Yard Product Certification VPM Introduction

Product Certification VeriSTAR Project Management New Building SURVEY AT YARD Actions Exchange of Documents Not covered by NB BV Marine Manager Owner Yard Request For Class Initiates Projects Manufacturer Creates Request Assigns P M Request for survey Comments documents Request for Certification Advise Manufacturer BV Project Leader New Construction Customizes projects Registers documents Assigns BVN centres Assignes Contacts Monitors progress Generate progress reports Checklists (customized) LPO Registers drawings Reviews drawings Generate progress reports Records status, comments Identifies categories SAY BVN Create product folder for shelf products Identifies products in a project Initiate design review Submits drawings to LPO Creates/ manages comments Completes product folder Generate reports of inspection Issues certificates Monitors surveys Manages comments Design Review Survey At Yard Product Certification VPM Introduction Product Design Review

Client for Product Certification VeriSTAR Project Management Independant project Product certification Actions Exchange of Documents Not covered by NB Client for Product Certification Manufacturer Request for Certification BV Project Manager Creates projects New Construction VPM Introduction

VeriSTAR Project Management Independant project Product certification Actions Exchange of Documents Not covered by NB Client for Product Certification Manufacturer Request for Certification BV Project Manager Creates projects New Construction Registers documents Assigns BVN centres Assignes Contacts Monitors progress Generate progress reports Product Certification Checklists (customized) BVN Product Certification VPM Introduction

VeriSTAR Project Management Independant project Product certification Actions Exchange of Documents Not covered by NB Client for Product Certification Manufacturer Request for Certification Request for Certification BV Project Manager Creates projects New Construction Registers documents Assigns BVN centres Assignes Contacts Monitors progress Generate progress reports Product Certification Checklists (customized) Advise Manufacturer LPO Registers drawings Reviews drawings Records status, comments BVN Create product folder for shelf products Identifies products in a project Initiate design review Submits drawings to LPO Creates/ manages comments Completes product folder Generate reports of inspection Issues certificates Design Review Product Certification VPM Introduction Product Design Review

VeriSTAR Project Management Independant project Alternative Inspection Scheme Actions Exchange of Documents Not covered by NB Manufacturer Request for Alternative Inspection Scheme BVN HO Manager Creates projects Assigns Project Manager New Construction VPM Introduction

VeriSTAR Project Management Independant project Alternative Inspection Scheme Actions Exchange of Documents Not covered by NB Manufacturer Request for Alternative Inspection Scheme BVN HO Manager Creates projects Assigns Project Manager BV Project Manager Creates projects New Construction BV Mode 1 VPM Introduction

VeriSTAR Project Management Independant project Alternative Inspection Scheme Actions Exchange of Documents Not covered by NB Manufacturer Submit Certificate/ Supporting doc. Request for Alternative Inspection Scheme Validate Certificat BVN HO Manager Creates projects Assigns Project Manager BV Project Manager New Construction Customizes projects BV Mode 1 VPM Introduction Product Design Review

VeriSTAR Project Management Independant project Design Review Actions Exchange of Documents Not covered by NB Yard/Consultant BV Project Manager New Construction Request for Design Review LPO Creates Projects Registers drawings Reviews drawings Generate progress reports Records status, comments Design Review VPM Introduction Drawing

VeriSTAR New Building Actions Exchange of Documents Not covered by NB Client for Product Certification BV Marine contact Owner Manufacturer Request for Alternative Inspection Scheme Request For Class Submit Initiates Projects Yard/consultant Creates Request Assigns P M Request for Certification Request for Certification Checklists Purchase orders BVN HO Manager Creates projects Assigns Project Manager Validate BV Project Leader/Manager Creates projects New Construction Customizes projects Registers documents Assigns BVN centres Assignes Contacts Monitors progress Generate progress reports Request for Design Review BV Mode 1 Product Certification Checklists (customized) Advise Manufacturer LPO Registers drawings Reviews drawings Generate progress reports Records status, comments Identifies categories Creates Projects (drawing or product design) SAY BVN Create product folder for shelf products Identifies products in a project Initiate design review Submits drawings LPO Creates/ manages comments Completes product folder Generate reports of inspection Issues certificates Endorses Certificate of Conformity Monitors surveys Manages comments Design Review Survey At Yard Product Certification VPM Introduction Drawing Product Design Review

Questions, comments Questions ? VPM Introduction

VeriSTAR New Building END VPM Introduction