Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.

Slides:



Advertisements
Similar presentations
Autodesk Integrations Overview SmartDesk A seamlessly integrated, affordable, out-of-the-box, Windows based drawing and document management tool for.
Advertisements

ATML Readiness For Use Phase II. Phase II Readiness For Use The ATML: Phase II will build on the Core phases, adding additional ATML components and features.
Data Modeling and Database Design Chapter 1: Database Systems: Architecture and Components.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Prototyping. Horizontal Prototyping Description of Horizontal Prototyping A Horizontal, or User Interface, Prototype is a model of the outer shell of.
IRS XML Standards & Tax Return Data Strategy For External Discussion June 30, 2010.
Configuration Management
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Ship Common Information Model (SCIM)
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
Chapter 1: The Database Environment and Development Process
RUP Fundamentals - Instructor Notes
Chapter 2 The process Process, Methods, and Tools
National Institute of Standards and Technology 1 Testing and Validating OAGi NDRs Puja Goyal Salifou Sidi Presented to OAGi April 30 th, 2008.
ITEC224 Database Programming
© 2008, Integrated Support Systems, Inc. All rights reserved. 1 © 2009, Integrated Support Systems, Inc. All rights reserved. An Implementer's View of.
OASIS ebXML Registry Standard Open Forum 2003 on Metadata Registries 10:30 – 11:15 January 20, 2003 Kathryn Breininger The Boeing Company Chair, OASIS.
9/14/2012ISC329 Isabelle Bichindaritz1 Database System Life Cycle.
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
STEP Shipbuilding Demonstration Highlights Integrated Shipbuilding Environment 4 (ISE 4) 26 June 2006 Ron Wood.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
1 Integrated Logistics Environment (ILE) Project Presented by : Dr. Burton Gischner Date:May 3, 2011 NSRP Joint Panel Meeting San Diego, CA.
DELMIA DPM Assembly This is the Master “Presentation title” page. Type the title of your presentation in the "Presentation title” field. Cette page est.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
1/26/2004TCSS545A Isabelle Bichindaritz1 Database Management Systems Design Methodology.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
Leading Edge Architecture for Prototyping Systems An Overview.
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
Database Design and Management CPTG /23/2015Chapter 12 of 38 Functions of a Database Store data Store data School: student records, class schedules,
The european ITM Task Force data structure F. Imbeaux.
1 Navy Product Data Initiative Overview May 2007.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
Chapter 10 Analysis and Design Discipline. 2 Purpose The purpose is to translate the requirements into a specification that describes how to implement.
3 February Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE Overview Presentation (to.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Ben Kassel NSWCCD Ted Briggs Intergraph Corporation An Alternate Approach to the Exchange of Ship Product.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
ISE4 Integrated Demo Ver 2 May 11, ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull.
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
ISE6 Context Schema Overview
ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
STEP for Multi-Disciplinary Model Management: “Intelligent PDM”
Welcome and Introductions 1 Ron Wood ILE Kick-off Meeting on June 17, 2010 Technology Investment Agreement (TIA): Integrated Logistics Environment.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
Robert Aydelotte ExxonMobil - Upstream Technical Computing 13 May 2004 Standardizing Fluid Property Reporting.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
March 24, ISE-6 Phase 2 Demo March 24, 2009.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
1 S HIP T ECH 2011 A S HIPBUILDING T ECHNOLOGIES I NFORMATION E XCHANGE Total Ownership Cost/Quality/Energy Efficiency Completion and Validation of the.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Application of the ISO for BIM Xenia Fiorentini, Engisis.
1 Long Term Retention of Product Model Data Ben Kassel Naval Surface Warfare Center Carderock Division Distribution Statement A : Approved For Public Release;
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
CM Spec analysis Markup from discussion 15/3. Summary of the scenario by way of the key business entities & their relationships CR Req Implem System or.
Systems Development Process and Methodologies Dr. T. Ravichandran.
Electrical wiring harness interoperability: functionalities of AP242 ed2; preparation of the STEP 'electrical' Implementer Forum By Sophie Hérail (CIMPA.
Presentation transcript:

Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems Ron Wood, Northrop Grumman Shipbuilding Pete Lazo, Product Data Services Ben Kassel, NSWC CD

Shipbuilding Data Exchange Problems – Proprietary exchange formats – Point to point interfaces – 3D geometry not linked with ship design data – AP 203/214 STEP geometry only Design Tools Other IPDE Analysis Tools Integrated Prod. Data Env. (IPDE) CAD Tool Shipyard Navy Class Society 10/23/20092 CAD File Design Data Design Data Addressed through use of standards Problem with commercial CAD translators for the foreseeable future. SNAME 2009

Current Ship Programs 10/23/20093SNAME 2009

NPDI & SCIM  NPDI (Navy Product Data Initiative) – To specify the requirements for and drive the implementation of product data systems based on an open architecture having suitable functionality and enterprise-wide interoperability to support affordable Navy ship design, construction and service life support – Initial version of the IPDE Specification has been written and delivered to the Navy for review and comment  SCIM (Ship Common Information Model) – SCIM will codify the models developed and prototyped by the ISE Project under NSRP over the past nine years – It will be a separate document from the IPDE Specification being produced by the NPDI Project, but it will be referenced by that IPDE Specification – Full version of the SCIM has not yet been completed Six of fifteen proposed chapters have been developed One of the remaining chapters deals with Product Life Cycle Support and will be based on the results of the ISE-6 Project 10/23/20094SNAME 2009

NPDI Scope Integrated Product Development Environment (IPDE) Product Data Manager IPDE Core Capabilities Product Data Management Configuration Mgmt Change Mgmt Status Dep. Mgmt Document Mgmt Process Control Access Control Requirements Tracking Work Authorization Reconfigurable IPDE Product Data Access Product Model Navigation Collaboration Tools Visualization Tools Reporting Tools Tool Integration Material Mgmt. Collaboration Reqts. Mgmt. Logistics Support PublishingDesignEngineeringPlanningTestConstruction Ext. Application ProcurementMRP Other Shipyards Data Exchange 10/23/20095SNAME 2009

NPDI SCIM ConceptDetailConstruction/Test In Service SupportDecomm. Milestone Reviews/ Decision Points SCIM To External Systems/ IPDEs Preliminary IPDE/PDMs maintained by Maintenance Contractor IPDE/PDM maintained by Design Agent/Builder Archive 10/23/20096SNAME 2009

Panel Project  Purpose – To determine the feasibility of using existing AP214 translators with NPDI SCIM data to improve the exchange of early and detail design data, and perform an initial validation of the SCIM.  Benefits – Develop an effective interim solution Develop recommendations for existing ship programs Demonstrate feasibility of using NPDI SCIM to exchange design data for DDG-1000 program and Navy LEAPS repository. – Lay groundwork for adoption of SCIM Initial validation of NPDI SCIM Generate SCIM test cases 10/23/20097SNAME 2009

Panel Project (Cont.)  Scope – Develop linkage between AP 214 and SCIM file – Ship and Molded Form test cases – Structural test cases – Piping test cases  Deliverables – Test Cases – SPS paper – technical approach – Final Report – includes SCIM recommendations 10/23/20098SNAME 2009

Current Situation for IPDE  3D geometry linked with CAD Attributes Design Tools Integrated Prod. Data Env. (IPDE) CAD Tool Shipyard CAD Files Visualization Files Design Data AP 214 XML CAD Attr CAD Translator 3D Shapes Attributes from CAD tool (CAD vendor specific) XML PDM Attr Attributes from PDM tool (Ship program specific) 10/23/20099 Limiting factor – CAD translator No other way to extract 3D data Requires translator from vendor’s IPDE translator – usually XML based Relatively easy to modify IPDE Translator SNAME 2009

CAD Translator Example - ISDP 10/23/ STEP AP 214 File #1012=PRODUCT(': m:1412:170347:40:',': m:usr:avlpd609005_00','equipment',(# 1002)); #1013=PRODUCT_RELATED_PRODUCT_CATEGORY('item','',(#1012)); #1014=PRODUCT_DEFINITION_FORMATION_WITH_SPECIFIED_SOURCE(': m:1412: :40:','equipment',#1012,.NOT_KNOWN.); #1015=PRODUCT_DEFINITION('','equipment',#1014,#1003); #1016=PRODUCT_DEFINITION_SHAPE(': m:usr:avlpd609005_00','equipment',#1015); XML Attribute File <ss_om_eqp comp_path=": m:usr:avlpd609005_00" comp_tagx=": m:1412:170347:40:" symbology="300:2:1:0:" class_name="VDequipment“ rep="4" macro_name="avlpd609005" macro_lib="avlpdmech03"> <ss_om_collector eqp_family="avtank01" eqp_partno="1CC97-LP-V " eqp_partrev="000" p_macro="avlpd609005" nomenclature="Receiver, Storage" mac_name="avlpd609005" /> <ss_om_collector eqp_number="RAC-TK1" eqp_descr="AC_UNIT_REFRIG_TANK" unit_number="1440" compt_number=" Q" sirobid="NULL" mark_user="double 0" sirid=" " system_name="RAC" zone_number="1440" /> SNAME 2009

CAD Translator Example - CATIA 10/23/ STEP AP 214 File #13=PRODUCT_DEFINITION('BR549501XXXDG00000',' ',#6,#3) ; #6=PRODUCT_DEFINITION_FORMATION_WITH_SPECIFIE D_SOURCE('',' ',#5,.NOT_KNOWN.) ; #3=PRODUCT_DEFINITION_CONTEXT('part definition',#1,' ') ; #1=APPLICATION_CONTEXT('automotive design') ; #5=PRODUCT('BR549501XXXDG00000','','',(#2)) ; #2=PRODUCT_CONTEXT(' ',#1,'mechanical') ; #8=PRODUCT_RELATED_PRODUCT_CATEGORY('part',$,(# 25,#39482)) ; #39465=NEXT_ASSEMBLY_USAGE_OCCURRENCE('B ','B000027','',#13,#27,' ') ; #27=PRODUCT_DEFINITION('PLANT_AC_500_TON',' ',#26,#3) ; #26=PRODUCT_DEFINITION_FORMATION_WITH_SPECIFI ED_SOURCE('Added maint space for condenser and chiller tubes removal',' ',#25,.NOT_KNOWN.) ; #25=PRODUCT('PLANT_AC_500_TON','','ENGINEERING DIAGRAM FOR AC PLANT, RAFT AND HARD MOUNTED EQUIPMENT',(#2)) ; #44957=NEXT_ASSEMBLY_USAGE_OCCURRENCE('B ','B000094','',#13,#39484,' ') ; #39484=PRODUCT_DEFINITION('EVAC_ASSY_500T_ AC_PLANT',' ',#39483,#3) ; #39483=PRODUCT_DEFINITION_FORMATION_WITH_SPEC IFIED_SOURCE('',' ',#39482,.NOT_KNOWN.) ; #39482=PRODUCT('EVAC_ASSY_500T_ AC_PLANT','','DEVELOPED FROM: YORK INTERNATIONAL; DWG NO , REV C.\X2\0009\X0\CONNECTIONS PER ANSI B16.22 AND MIL- V ',(#2)) ; XML Atribute File - - ……….. SNAME 2009

AP203 or AP214 define shape using explicit geometry SCIM defines product structure, design parameters, and the relationships between objects. Geometry vs Product Structure 10/23/2009SNAME

AP 214 XML SCIM CAD System Commercial CAD Translator Interim SCIM Translator PDM System Transform proprietary XML data into SCIM format, adding additional PDM data Linkage between geometry and attributes CAD DB XML CAD Attr Interim SCIM Approach 10/23/200913SNAME 2009

Technical Approach  All geometry is contained in AP 214 file – Externally referenced from SCIM file – Modify SCIM schema to add external reference  All product structure is contained in SCIM file – Ignore AP 214 assembly structure  Create SCIM file based on information in CAD XML file, CAD database and/or PDM system 10/23/200914SNAME 2009

Test Case Methodology  Define instance diagram – Defines key objects and relationships  Generate AP 214 file and CAD XML file  Hand populate spreadsheet with SCIM attributes  Generate XML SCIM Test Case File from spreadsheet 10/23/200915SNAME 2009

10/23/ ISE Test Ship – TWR841 This ship is used to locate and retrieve torpedoes and missile drones. It has a maximum payload capacity of 42 long tons which includes the deck cargo plus full liquids, full complement, and normal stores. This ship was selected because it is in-service, has a complete set of drawings available for distribution, and is: Approved for Public Release: Distribution Unlimited. SNAME 2009

TWR Molded Forms 10/23/2009SNAME

AP 216 Instance Diagram 10/23/200918SNAME 2009 Ship Moulded Form Functional Definition Moulded Form Design Definition External Reference Global Axis Placement Principal Characteristics Spacing Table

AP 216 Spreadsheet 10/23/200919SNAME 2009

AP 214 File 10/23/200920SNAME 2009 STEP AP 214 File #112=PRODUCT(‘INGR_0005',‘moulded form',(#02)); #113=PRODUCT_RELATED_PRODUCT_CATEGORY('item','',(#112)); #114=PRODUCT_DEFINITION_FORMATION_WITH_SPECIFIED_SOURCE(‘INGR_0005',‘moulded form',#112,.NOT_KNOWN.); #115=PRODUCT_DEFINITION('',‘moulded form',#114,#03); #116=PRODUCT_DEFINITION_SHAPE(‘INGR_00005',‘mouloded form',#115); #474= B_SPLINE_SURFACE_WITH_KNOTS('port_mid_edge',3,1,((#458,#460),(#462,#464),(#466,#468),(#470,#472)),.UNSPECIFIED.,.U.,.U.,.U.,(4,4),(2,2),( 0.,1.),(0.,1.),.UNSPECIFIED.); #4418= EDGE_LOOP('',(#4338,#4348,#4351,#4353)); #4420= FACE_OUTER_BOUND('',#4418,.T.); #4421= ADVANCED_FACE('port_mid_edge Face',(#4420),#474,.F.); #4463= OPEN_SHELL('MF_twrhull_comp',(#4416,#4421,#4426,#4431,#4436,#4441,#4446,#4451,#4456,#4461)); #4465= FACE_BASED_SURFACE_MODEL('MF_twrhull_comp',(#4463)); #4467= MANIFOLD_SURFACE_SHAPE_REPRESENTATION('MF_twrhull_comp',( #4465),#111); #4470= PRODUCT_DEFINITION_SHAPE('','moulded form design definition',#334); #6043=SHAPE_DEFINITION_REPRESENTATION(#116,#4470);

XML SCIM File  Test Case 10/23/200921SNAME 2009

Summary of Findings  Demonstrated viability of approach – External reference mechanism will be incorporated into SCIM  Enhanced SCIM – Identified need to document geometry model Project used AP 214 geometry – Triggered generation of fully expanded XML schemas – Identified need to better define mandatory attributes  Determined use of SCIM still requires access to ISO STEP documentation  Identified few minor discrepancies with ISO STEP models 10/23/200922SNAME 2009