Offered by Dave Scott & Associates, Inc.. TrendWall ® Interior Landscape Solutions TrendWall Flexible Fast Sustainable Economical.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

ALUR Wall System.
Doors and Windows.
Dr. Ruth Collins TrinityHaus
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Contents: Cover
Liftslide. Welcome 1)With over two decades of experience behind our designs, the company has positioned itself as the forerunner in the use of European.
FVCC Fire Rescue Forcible Entry.
Objective: Develop plans for kitchen cabinets.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Source One Source One Network and Building Solutions.
Innovative New Technologies in Building & Construction.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Economic Advantages. 2 ECONOMIC ADVANTAGES  Comparable costs or less expensive than drywall at the initial purchase.  Substantial savings over the next.
Tel : Fax: P.O.Box : Dubai, UAE.
ARCHITECHURAL ELEMENTS.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
St Helens High School Building Construction
Chapter 4: Air Leakage Control: Materials and Techniques
Residential Construction Unit 6 Interior finishes Mr. Todzia.
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
Interior Construction
What is Thermal Bridging? A reduction of the effectiveness of insulation to reduce conductive heat flow through the building envelope otherwise know as.
WHAT’S THE POINT… why use modular systems? schedule sensitive cost effective flexible and scalable sustainable environmentally responsible.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
PRODUCT MIX. Founded in 1968 Concord Products Inc ™, helps individuals and organizations around the country.
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Wall and Ceiling Construction
Answer® by Steelcase.
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Wall Framing Grimsby Secondary School Technology Dept.
© 2010 MAiSPACE, Inc. ALUR Dividing Wall An Attractive, Cost Effective Sidewall for ALUR Glass Walls and MAiSPACE Floor to Ceiling Panels.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
INTERIOR PAINT & DRYWALL REPAIR Identify the tools needed to paint interior ceilings & walls Learn to repair damaged drywall Learn how to prepare rooms.
A Prefabricated Framing and Enclosure System. The Problem.
 Overview of Interior Finishes  Types  Examples.
ARCHITECHURAL SIMPLICITY.
Interior Paneling Installation Copyright © Texas Education Agency, All rights reserved.
BLUEPRINT READING The ability to do basic drawing and read blueprints are valuable skills needed in all areas of construction. Students do a simple sketch.
Administration Offices Proposed by: Wyatt Marvin and Mitch Sander.
Manufactured Construction Alberta Infrastructure’s Perspective on Current Trends Canadian Center for Healthcare Facilities.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
Reasons for Not Using Demountable Walls
Installation Walkthrough Image Guide
FLEX Architectural Wall System
The Sustainable Solution
Unitized vs Pre-Engineered vs NxtWall
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
The Sustainable Solution
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
The Sustainable Solution
The NxtWall Advantage.
Multistory Office Building
Planning and Scheduling a SIMPLIFIED Construction Project
INTD 503- Materials Topic: Partition Walls
INTD 405 Modern Practices in Interior Design PLANS
House Construction Budget Plan
Wall and Ceiling Construction
Window Schedule A list of the windows to be installed in a building, including complete specifications.
Understanding Blueprints
Objective: Develop plans for kitchen cabinets.
Think About it….. Jot down everything you think you know about residential wall framing. Hint: think about what you already know about floor framing.
Presentation transcript:

Offered by Dave Scott & Associates, Inc.

TrendWall ® Interior Landscape Solutions TrendWall Flexible Fast Sustainable Economical

“recreate the space you need” Flexible

Remodeling is a Mess! Quick Change Cut Down Stack On Flexible

Modular vs Conventional Timeline need space space planning & budget detailed design developmentfinal design & project cost constructionITFF&E move in Change TrendWall Modular Environments Gap between current business needs & conventional solution client’s business conventional process & solution future-proofing your business Lease Term time

Fast “move in faster with TrendWall”

TrendWall manufactured offsite TrendWall delivered & installed FF&E Quick Connect E&D T Bar & Core Finishes HVAC, Sprinkler & Lighting Fast Conventional Project Schedule TrendWall Project Schedule Overall Schedule Reduction 30-50% HVAC, Sprinkler Lighting, Power, Cable Tray Drywall Studs Electrical Power Finishes, Doors & Hardware Data FF&E Electrical Data

Sustainable “reduce, reuse recycle...”

LEED 43.5% Recycled Content 100% Re-Useable Sustainable

Economical “lowers the life cycle cost”

Economical Lower life cycle cost Less disruption Accelerated depreciation

Economical Labor cost 30% Labor cost 70% Product cost 30% Product cost 70% Base Building Cost ConventionalModular Interior Build-Out Costs The 70/30 “swap” General Construction Budget 100%

TrendWall Lay it out Frame it in Stand it up Trim it out

Laying it out Fixed walls Ceilings Windows Monuments

Framing it in Crown Floor plate Wall channels Pilasters

Laying it out Solid panels Glazed panels Door sections Filler panels

Trimming it out Base trim Pilaster covers Finished End Kits

Product Specifications 7' – 10' panel heights Up to 4' stacker Infinite glass openings Modular or hardwire

Class “A” surface materials STC = 41 Meets ANSI/BIFMA X5.6 Product Specifications

Putting it All Together

TrendWall = $124/ft Drywall = $93/ft Project delta = 35% Putting it All Together

$140 $120 $100 $80 $60 $40 $20 $0 $38.93 $92.97 $52.07 $40.83 DrywallTrendWall Labor Material First Time Cost

Disposal Cost Depreciation Tax Benefit Labor Material $250 $200 $150 $100 $50 $0 ($50) $13.19 $40.83 DrywallTrendWall $25.00 $38.93 $92.97 $92.90 $52.07 ($8.29) ($1.91) True Life Cycle Cost

On Time 99.9% on time and complete shipment… An industry best! In Time 80% of standard orders ship in 2 weeks or less- Trendway Xpress orders average 3-day shipping

Backed by our Promise!