Well Design PE 413.

Slides:



Advertisements
Similar presentations
Well Design PE 413 Introduction and API Standards of Casing
Advertisements

PETE 411 Well Drilling Lesson 17 Casing Design.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
PETE 203 DRILLING ENGINEERING
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Chapter 3 Casing design.
Lesson 20 Abnormal Pressure
DRILLING ENGINEERING Well Control.
Lesson 14 Jet Bit Nozzle Size Selection
Drilling Engineering – PE 311 Drill Bit Optimization
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Lesson 22 Prediction of Fracture Gradients
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
PETE 203 DRILLING ENGINEERING
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Petroleum Engineering 411 Well Drilling
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
RIG PROCESSES  Drilling, Coring, Directional Drilling & Survey.  Tripping, Wash & Ream, Fishing.  E- Logging.  Casing & Cementing.  Perforating &Testing.
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Laminar Flow in Pipes and Annuli
Drilling Engineering – PE311 Rotary System
Lesson 4 Drilling Cost & Drilling Rate
Confidential to SMD JIP
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Lesson 25 Well Control, cont’d
Drilling String Design
Footings.
Outline Pore Pressure and Fracture Gradient Drilling Fluid Casing Design Cement Design Drilling Bit Economic Analysis.
Lesson 30 Cementing - cont’d
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
New Fluid Solutions, Inc. NFS-BlackSeal ®. Overview Generally, the types of formations that are prone to lost returns are cavernous and vugular, naturally.
PETE 411 Well Drilling Lesson 9 Drilling Hydraulics - Hydrostatics.
Lesson 15 Surge and Swab Pressures
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
WELL PROBLEMS.
Lesson 18 Casing Design Example
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
Gas Exploration Team Hail 7 Casing Design. Overview Wellbore Schematic Design and load assumptions Design Factors Casing Strings & Connections Details.
1 Petroleum Engineering 406 Lesson 13 Shallow Water Flows.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Lecture items Gamma Ray log * Definition. * Types
Drilling Engineering – PE 311 Turbulent Flow in Pipes and Annuli
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Casing Design.
Well Log Interpretation Basic Relationships
Lesson 21 Prediction of Abnormal Pore Pressure
Yield point and yield stress or strength,  y Offset method finds this yield stress by assuming a 0.2 % strain (.002).002 Big yielding region, large elongation.
6. Gas Kick Behavior Confidential to DGD JIP Slide 1 of 48 by Hans C. Juvkam-Wold Lesson 6 Gas Kick Behavior Dual Gradient Drilling Basic Technology.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Bacha Khan University Charsadda
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Wellbore Stability in Olmos Formation
Section 6-T14N-R94W Sweetwater County, Wyoming 13000’ Almond Test April 24 th, 2010 James Benson Kristin Carter Patrick Gardner Brandon Heiner Aaron Bounds.
Design Factor Collapse
Chapter VIII Packer and Tubing Forces.
Design Factors The axial load on the casing can be either tensile or compressive, depending on the operating conditions.
CASING.
Chapter 2: Casing Design Introduction and API Standards of Casings
Cementing How it is Done
Chapter 2: Casing Design Casing Selection
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Design Factors Collapse Corrected
Chapter 2: Casing Design Calculations of Loads on a Casing
Casing Point Selection
Casing Design Workshop
Design Calculations Combination Strings
Presentation transcript:

Well Design PE 413

Introduction To obtain the most economical design, casing strings often consist of multiple sections of different steel grade, casing depths, wall thickness, and coupling types. Such a casing string is called a combination string. Additional cost savings sometimes can be achieved by the use of liner combination strings instead of full strings running from the surface to the bottom of the hole. However, the potential savings must be weighted against the additional risks and costs of a successful, leak-free tieback operation as well as the additional casing wear that results from a longer exposure of the upper casing to rotation and translation of the drill string.

Selection of Casing Setting Depths The selection of the number of casing strings and their setting depths generally is based on a consideration of the pore pressure gradients and fracture gradients of the formations to be penetrated. The pore pressure and fracture pressure are expressed as an equivalent density and are plotted vs. depth. A line representing the planned-mud-density program also is plotted. The mud densities are chosen to provide an acceptable trip margin above the anticipated formation pore pressure to allow for reductions in mud weight caused by upward pipe movement during tripping operation. A commonly used trip margin is 0.5 lbm/gal or one that will provide 200-500 psi of excess bottomhole pressure over the formation pore pressure.

Selection of Casing Setting Depths

Selection of Casing Setting Depths Point a: to prevent the formation fluid into the well and to reach the desired depth. Point b: to prevent the fracture of formation --> intermediate casing need to run at this depth. Point c: Fluid density is reduced until it reaches to margin of the curve Point d: casing shoe of the surface casing

Example A well is being planned for a location in Jefferson Parish, LA. The intended well completion requires the use of 7’’ production casing set at 15,000 ft. Determine the number of casing strings needed to reach this depth objective safely, and select the casing setting depth of each string. Pore pressure and fracture gradient, and lithology data from logs of nearby wells are given in Fig 7.21. allow a 0.5 lbm/gal trip margin, and a 0.5 lbm/gal kick margin when making the casing seat selections. The minimum length of surface casing required to protect the freshwater aquifers is 2000ft. Approximately 180 ft of conductor casing generally is required to prevent washout on the outside of the conductor. It is general practice in this are to cement the casing in shale rather than in sandstone.

Example

Selection of Casing Sizes To enable the production casing to be placed in the well, the bit size used to drill the last interval of the well must be slightly larger than the OD of the casing connectors. The selected bit size should provide sufficient clearance beyond the OD of the coupling to allow for mud cake on the borehole wall and for casing appliances, such as centralizers and scratchers. The bit used to drill the lower portion of the well also must fit inside the casing string above.

Selection of Casing Sizes

Selection of Weight, Grade, and Couplings In general, each casing string is designed to withstand the most severe loading conditions anticipated during casing placement and the life of the well. The loading conditions that are always considered are burst, collapse, and tension. Because the loading conditions in a well tend to vary with depth, it is often possible to obtain a less expensive casing design with several different weights, grades, and couplings. The casing design usually is based on an assumed loading condition. the assumed design load must be severe enough that there is a very low probability of a more severe situation actually occurring and causing casing failure.

Selection of Weight, Grade, and Couplings The high-internal pressure loading condition used for the burst design is based on a well control condition assumed to occur while circulating out a large kick. The high-external pressure loading condition used for the collapse design is based on a severe lost-circulation problem. The high-axial tension loading condition is based on an assumption of stuck casing while the casing is run into the hole before cementing operations.

Selection of Weight, Grade, and Couplings

Selection of Weight, Grade, and Couplings Burst Design The burst design should ensure that formation fracture pressure at the casing seat will be exceed before the burst pressure is reached. Thus, this design uses formation facture as a safety pressure release mechanism to ensure that casing rupture will not occur at the surface. The pressure with the casing is calculated assuming that only formation gas is in the casing. The external pressure outside the casing that helps resist burst is assumed to be equal to the normal formation pore pressure for the area.

Selection of Weight, Grade, and Couplings Collapse Design The collapse design is based either on the most severe lost-circulation problem that is felt to be possible or on the most severe collapse loading anticipated when the casing is run. For both cases, the maximum possible external pressure that tends to cause casing collapse results from the drilling fluid that is in the hole when the casing is placed and cemented.

Selection of Weight, Grade, and Couplings Collapse Design If a severe lost circulation zone is encountered near the bottom of the next interval of hole and no other permeable formations are present above the lost circulation zone, the fluid level in the well can fall until the BHP is equal to the pore pressure of the lost circulation zone. where Dlc is the depth of the lost circulation zone; gp is the pore-pressure gradient of the lost circulatio zone; rmax is the maximum mud density anticipated in drilling to Dlc; and Dm is the depth to which the mud level will fall.