MPRDC 1 Operation, Maintenance & Tolling in Road Sector : Potential, Progress & Way Forward Perspective of Madhya Pradesh Vivek Aggarwal MD MPRDC Connecting.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Output & Performance based Road Contracts (OPRC)
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
A framework for organising and financing infrastructure provision Jan-Eric Nilsson, VTI.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Mag. Martin Oder, LL.M. OECD/SIGMA Concessions and Public.
MPRDC 1 MANAGING PPPs Institutional Framework for Contract Management and Monitoring Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure.
Vivek Aggarwal Managing Director, MP Road Dev. Corporation
Financial Provisions for long-term Environmental Liability Case study from Norway Tonje Johnsen Senior legal adviser, Section for Legal Affairs.
PRESENTATION ON PUBLIC PRIVATE PARTNERSHIP (PPP) IN NATIONAL HIGHWAYS BySECRETARY, DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS GOVT. OF INDIA Conference of.
MPRDC 1 PPP in Madhya Pradesh Success Story of Roads Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure.
Unified Carrier Registration (UCR) Update August 24, 2006.
Speech by Dr. Vuong Duc Hoang Quan Director of Investment Department
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
DEPARTMENT OF TOURISM AND PUNJAB INFRASTRUCTURE DEVELOPMENT BOARD invite Public Private Partnership (PPP) for Development of INSTITUTE OF HOTEL MANAGEMENT.
Guaranteed Energy Savings Contracts Contracting Requirements for Local Governments Norma Houston NCGFOA Annual Conference July 18, 2011.
Contractor Safety Management
Organised by Civil Service College, Dhaka Nazrul Islam Executive Director and CEO Infrastructure Investment Facilitation Center 11 February 2012 Basics.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
ZHRC/HTI Financial Management Training
Some figures about Disabled People in Turkey Financial Rules Asist. Prof. Mahmut Geyik.
1 Tanzania National Roads Agency TANROADS BRIEF OVERVIEW OF TANROADS Tuesday 29 th March 2011 Thursday 17 th June
Module 4 Legal Tools for Port Reform.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
Financing Urban Public Infrastructure
ECONOMIC & RISK ANALYSIS
MP was known for bad roads. Improper design based on traditional approach. Budget driven construction methodology in place of demand driven. Poor fund.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
RELATED PARTY TRANSACTION
TAX IN KENYA.
Small-Scale Embedded Generation (AMEU and its Work Group Input) Gerrit Teunissen 18 April 2013.
1 Eastern Caribbean Geothermal Development Project: Institutional and juridical guidelines Denis LEVY GROUPE T I T A N E Member of.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
III Astana Economic Forum. Ensuring Sustainable Economic Growth of Countries in Post-Crisis Period July 1-2, 2010 JSC «Kazakhstan public-private partnership.
Councillor Community Fund Isabell Procter Director of Resources Francis Fernandes Borough Secretary.
Presentation on Strategies for Infrastructure Development in Karnataka By: V. P. Baligar.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
Arnsburger Str. 64, Frankfurt, Germany Tel , Fax Internet:
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
1.  Primary Function  Major Source of Income  Major funds used for this purpose 2.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Loans & advances Under companies act, 2013 To director or company in which director is interested Sec 185 To any other Companies Sec 186.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Infrastructure Development Corporation Limited Risk Mitigation through Project Development Focus on Safer Airplanes in addition to better Parachutes Pradeep.
ADB – Transport Sector Operations in India New Delhi, 26 October 2012 India- Spain Multilateral Partnership Meeting.
Telephone: Indian Roads and Highways: Trends & Opportunities ( )
Restructuring of the Finnish Infrastructure Administration Draft
RURAL CREDIT IN ROMANIA - PRE - ACCESION PERIOD- Brussels, January 27, 2011 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Islamic Development Bank (IsDB)
Treasury of the Republic of Kazakhstan
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Profession Practices (ECIV-5105)
INTERCONNECTION GUIDELINES
Entrepreneurial Finance
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
Makerere University Investors Conference
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Grant Implementation Agreement (GIA)
The Role of Private Sector in Capital Budgeting
Building a secure Home Affairs
Article 5 Setting up the rules guaranteeing Users protection that will
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

MPRDC 1 Operation, Maintenance & Tolling in Road Sector : Potential, Progress & Way Forward Perspective of Madhya Pradesh Vivek Aggarwal MD MPRDC Connecting People Through Quality Infrastructure

Road Network of Madhya Pradesh MPRDC Total MPRRDAMPRDCPWD Total Length ( in Km) Category Total MPRRDAMPRDCPWD Total Length ( in Km) Category Total MPRRDAMPRDCPWD Total Length ( in Km) Category National Highways State Highways Major District Roads (PMGSY) Village Roads Total MPRRDAMPRDCPWD Total Length ( in Km) Category Total MPRRDAMPRDCPWD Total Length ( in Km) CategoryMPRRDAMPRDCPWDMPRRDAMPRDC Total Length ( in Km) PWDMPRRDAMPRDC - National Highways - State Highways - Major District Roads (PMGSY) Village Roads - National Highways - State Highways - Major District Roads (PMGSY) Village Roads - National Highways - State Highways - Major District Roads (PMGSY) Village Roads - National Highways - State Highways - Major District Roads (PMGSY) Village Roads Total Length ( in Km) PWDMPRRDAMPRDC Category Total Length ( in Km) PWD Category Total Length ( in Km) MPRDC PWD Category Total Length ( in Km) MPRRDA MPRDC PWD Category Total Length ( in Km) Category Total Length ( in Km) PWD Category Total Length ( in Km) MPRDC PWD Category Total Length ( in Km) MPRRDAMPRDCPWDCategory Total Length ( in Km) Category Total Length ( in Km)

MPRDC 3  Incorporated as wholly owned State Govt. Company under Companies Act 1956, in July  ‘Highway Authority’ for State Highway.  Upgrades, Constructs and Strengthens the total length of State Highways.  Develops projects in the State on Public Private Partnership basis.  The Hon’ble Chief Minister of Madhya Pradesh is the chairman, Hon’ble Minister of Public Works Department & the Chief Secretary are the Vice Chairmen, the Principal Secretaries of the Finance dept., Forest Dept., Urban Administration & development and Mining Dept. are the members of the Board.  MD, MPRDC is also one of the director. Madhya Pradesh Road Development Corporation

MPRDC 4 Invite private investment by providing grant / premium to / by the concessionaire on competitive bidding Our Projects

MPRDC 5 Category/ModelCost (Crores) Ongoing BOT (Toll)16053 BOT (Toll + Annuity)3260 BOT (Annuity)4578 ADB4159 Regular Contract1689 ROB/RUB1645 Border Checkpost1094 OMT45 Building Works165 Projects in Pipeline ADB Loan IV Lanning Of 3 State Highways on BOT (Toll) 4500 Grand Total40188

Our Projects: Cost Share in Crores of Rupees MPRDC 6

BOT Models MPRDC 7 3. BOT (Toll + Annuity) Model 4 BOT (Annuity) Model 5. Deemed Shadow Fee Model 1. OMT Model 2 BOT (Toll) Model

MPRDC has envisaged to take up roads on OMT (Operate Maintain & Transfer) mode under Public Private partnership. Above roads are developed by MPRDC through ADB funding/Budgetary Support of the State Government. 15 such roads are identified by MPRDC amongst which 3 roads are awarded on Premium & 1 is under tender stage. Concession Period – Project specific, normally 9-12 years Concessionaire to undertake management, operation & maintenance of Highways Augmentation of facility to be done MPRDC 8

Construction, monitoring and inspection by Independent Engineer. Remuneration, cost & expenses of Independent Engineer to be paid by the Concessionaire in four six monthly installments. Concessionaire to pay Concession Fee to the Authority. Concession Fee is the bidding parameter. This fee to increase by 10% per year as compared to the immediately proceeding year. MPRDC 9

Concessionaire can seek O&M support also. User Fee - pre-decided, increase on the basis of WPI Toll on only commercial vehicles. Passenger vehicles are exempted from toll. Escrow mechanism for fund flow. Capital cost for road improvement along with maintenance of roads. Cost to be incurred on Land Acquisition & Utility Shifting will be borne from State Highway Fund. MPRDC 10

Conditions Precedent to be satisfied by the Concessionaire within 45 days from the date of Concession Agreement and prior to COD:  Submission of Performance Security.  Execution of Escrow Agreement.  Legal opinion of the Legal Counsel on the concession. Procurement of Right of Way to the Site within 30 days notice given by the Concessionaire upon providing Performance Security. COD within 45 days from the date of Concession Agreement. In case of delay, 0.2% of Performance Security for each day. MPRDC 11

Provision for Change of Scope. Force Majeure Act or event which i.is beyond the reasonable control of the affected party. ii.Affected Party is unable to prevent by exercising due diligence & Good Industry Practice. iii.has Material Adverse Effect on the Affected Party.  Types of Force Majeure: i.Non-Political Event ii.Indirect Political Event iii.Political Event MPRDC 12

Effects of Force Majeure on Concession  Prior to COD- period for achieving COD shall be extended by a period equal to the duration of Force Majeure event.  After COD: Concession Period shall be extended in proportion to the loss of fee on a daily basis, if daily toll collection is less than 90% of average daily fee. Loss of 25% in collection of fee as compared to Average Daily Fee for 4 days entitles the Concessionaire to extension of 1 day in the Concession Period. MPRDC 13

14 Initiatives of MPRDC - BOT(OMT)MODEL TYPES OF FORCE MAJEURE ACTSALLOCATION OF COST AFTER COD TERMINATION PAYMENT Non-Political Event Act of God, epidemic, adverse weather conditions, earthquake, landslide, cyclone, flood, strikes, boycotts etc. Party shall bear their respective Force Majeure Cost & neither party shall require to pay to the other party any cost. 50% of debt due less insurance cover payable to the concessionaire Indirect Political Event Act of war, industry or state wide strike, civil commotion, political agitation Force Majeure cost shall be reimbursed by MPRDC to the concessionaire. Amount equal to the debt due Payable to the Concessionaire Political Event Change in Law, unlawful revocation of any clearance, license, permit, authorization, NOC, consent, approval of exemption required by the concessionaire. Force Majeure cost shall be reimbursed by MPRDC to the concessionaire. Amount equal to the debt due payable to the Concessionaire NOTE: - Upon Occurrence of Force Majeure prior to COD, the parties shall bear their respective cost & no Party shall pay to other party any cost.

MPRDC 15 Initiatives of MPRDC - BOT(OMT)MODEL Termination & Termination Payment TerminationTermination Payment Termination for Concessionaire Default During Construction Period: Amount equal to 50% of debt due. Termination for Authority Default i.Debt Due ii.Product of Average Daily Fee multiplied by 60.

Projects identified for OMT S. No.Name of RoadSH. No. Length (in Kms.) 1Bhopal-Vidisha RoadSH Vidisha-Kurwai RoadSH Sagar-Rehli RoadSH Tikamgarh- Orchha RoadSH-11A78.4 5Jabalpur-Amarkantak RoadSH Mandla- Kanha RoadSH Khargone- Barwani RoadSH Barwah- Damnod RoadSH Badnawar- Thandla RoadSH Pachor- Shujalpur- Ashta- Kannod RoadSH-41 & Budhi-Rehti-Nasrullaganj-KhategaonSH Bela- Govindpur- Churhat RoadSH Nagod- Jasso- Sahela-Mohindra- Amarganj Road SH Porsa- Mohgaon- Seondha RoadSH Lukwasa-Ishagarh- Chanderi RoadSH Total MPRDC 16

S.N O NAME OF ROADS. H. N O. LENGTH (in KM) CAPITAL COST (in CRORES) NAME OF CONCESSIONAIRE PREMIUM (Per Year) 1 Badwah- Dhamnod Agroh Infra2.07 Cr. 2 Badnawar- Thandla Eagle Infra0.35 Cr. 3 Budhni-Rehti- Nasrullaganj- Khategaon Madhav Infracon2.52 Cr OMT Projects 17 MPRDC

S.NONAME OF ROADS.H. NO. LENGTH (in KM) CAPITAL COST (in CRORES) 1 Bela-Govindhgarh- Churhat Road OMT Project Under Tender Stage 18 MPRDC

Our Strengths Concessionaire’s faith in MPRDC due to transparency in bidding process. Lender’s faith in MPRDC ensuring Financial Closure of BOT Projects. Most of the projects of MPRDC have achieved Financial Closure in spite of nationwide scenario of Infrastructure sector wherein Financial Closures have become difficult. MPRDC facilitates Concessionaires to achieve FinancialClosure. Deployment of Supervision and Quality Control Consultants with international expertise. Deployment of capable construction agencies with introduction of advance machineries and equipments. MPRDC 19

Our Strengths Adequate Budget provision for Annuity &VGF payments by the State Government. Annuity payment along with bonus on due date. Outsourcing of Expertise. Consultants are appointed for Feasibility Report/DPR and Supervision of Construction. Experts like Legal Advisor, Chartered Accountant, Company Secretary, Environment expert, MIS expert, Road Data System Engineer are engaged in house. In-house financial analysis. Planning is done well in advance at the head office level. Fast decision making. MPRDC 20

Our Strengths Political commitment & support. Concessionaires are treated as partner. Bills are cleared in 2 to 4 working days. All Stake holders are facilitated. Land Acquisition and Environmental Clearances are planned and executed well in advance. Chief General Manager at Head Office & Divisional Manager coordinate with District Administration. NOC of State Forest Department, permissions for utility shifting, tree cutting permission etc are procured before Appointed date. MPRDC 21

State Highway Fund MPRDC 22 GoMP has enacted the Madhya Pradesh Rajmarg Nidhi Adhiniyam 2012 to provide for the establishment of a Fund for investments in the highways & infrastructure projects of the State. Corpus of the Fund is 125 Crores (approx). Executive Committee under the Chairmanship of Chief Secretary to administer the fund. Sources of FundApplication of Fund All payments of PremiumFor Maintenance and Repair of Highways Proceeds towards encashment of Performance Security or Bid Security For Meeting any Development Cost of Highway or Infrastructure Project All returns on investments made out of the Fund For Project Preparation, Pre Tender Activities, Cost towards Utility Shifting, Land Acquisition

Accident Response System Implementation of ARS system on PPP mode is probably a first in the world. State wide implementation of ARS will be first in country. ARS to address safety requirements in the larger perspective. Technical Assistance through ADB for capacity building in road safety. Accident Response System & Traffic Management Centre in Madhya Pradesh including operation & maintenance for 5 years with estimated cost of Rs crores has been proposed. A Road Safety Cell is created in MPRDC. MPRDC has engaged an agency for ARS on Annuity basis. ARS includes centralized call centre, GIS based automatic vehicle tracking system (AVTS), Computer aided dispatch system, Traffic Management Centre. MPRDC 23

24 A country has to pay for its roads. Whether it has them or not, it pays more for those it does not have. So Lets Have them….. Connecting People Through Quality Infrastructure