My Job? South African Triage Scale and Acute and Emergency Case Load Management Policy Implementation Officer.

Slides:



Advertisements
Similar presentations
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Advertisements

The information contained in this presentation, the source code and underlying program are protected by copyright owned by PlusDelta Technologies, LLC.
What are the causes and consequences of ED overcrowding? Inability to move admitted patients from the ED to appropriate inpatient units – Hospital occupancy.
SAFER Patient Flow Bundle The patient flow bundle is similar to a clinical care bundle. It is a combined set of simple rules for adult inpatient wards.
Inquiry into Public Hospital Performance Ambulance Victoria Presentation 2 December 2009.
Acknowledgements RHH ED staff Safety and Quality Unit RHH for their participation and valuable contribution Next Steps It is envisaged over the next 12.
Irish National Acute Medicine Programme Patient Flow Model O’Reilly O, Courtney G, Casey A* Problem Patients requiring urgent care experienced long delays.
EDIS Emergency Department Information System
Mr David Chung Emergency Medicine NHS Ayrshire and Arran.
How Fast Are We? Throughput Times for Admissions From the Emergency Department Brian Hom; Deborah Porter RN, NM; Kathleen Chambers RN, MSN, CPN; Laura.
Local Unscheduled Care Action Plan and Winter Planning Health and Social Care Partnership Meeting 24 Oct 2013.
Acute Medicine Programme A clinician-led initiative of the Royal College of Physicians of Ireland (RCPI), the Irish Association of Directors of Nursing.
Ideas from UK modernisation: The Improvement Partnership for Hospitals Penny Pereira Ideas from UK modernisation.
Refining and Redefining Emergency Flows
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
Oxford Radcliffe NHS Trust
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Surge Capacity Plan EMERGENCY DEPARTMENT.  Surge capacity strategies will be implemented when volume exceeds staffing and/or treatment space POLICY:
Value Stream Management for Lean Healthcare ISE 491 Fall 2009 The Identification of Waste in Healthcare - Lecture 4.
1 Providing Timely Access to Healthcare or Must Patients be Patient? Based on presentation by Professor Linda Green Columbia Business School April 20 th,
Scorecard Tool Steve Kisiel, MS Vince Placido, BSE Jeffery K. Cochran, PhD James R. Broyles, BSE.
Eastern Health: Improving ED to Ward Transfer
Exit Tent Suspected ward Confirmed ward Recovering ward Morgue Confirmed entry door Dead on arrival Patient flow at Lunsar Ebola Treatment Centre Patient.
New Zealand Eastern Health Urology OPD Fran Brockhus – Assistant Director of Nursing.
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
15: The ‘Admin’ Question Patient flow Dr Tony Kambourakis.
Redesigning Care in the Paediatric Emergency Department CYWHS, SA Presented by Ms Heather Gray Chief Executive : CYWHS 25 th November 2005.
REFORMING EMERGENCY CARE St. Jude's Past, present and future.
EFFECTS OF RESIDENTS ON EFFICIENCY IN AN EMERGENCY DEPARTMENT J. Silberholz, D. Anderson, E. Sze, J. Lim, E. Taneja, E. Tao, B. Kubic, K. Johnson, D. Kalowitz,
EFFECTS OF RESIDENTS ON EFFICIENCY IN AN EMERGENCY DEPARTMENT J. Silberholz, D. Anderson, M. Harrington, Dr. Jon Mark Hirshon, Dr. Bruce Golden 1.
Dr Dan Beckett Consultant Acute Physician NHS Forth Valley.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Is the 7 day service the future of pharmacy in acute medicine? David Young.
Cleveland Clinic Science Internship Program How Fast Are We? Throughput Times for Admissions from the Emergency Department Brian Hom; Deborah Porter RN,
An Introduction to Improvement. To develop a basic understanding of: Service improvement in healthcare Some of the tools and techniques used To apply.
Nicole Sutherlin Brianna Mays Eliza Guthorn John McDonough.
Symposium sponsors:  Mount Sinai Department of Emergency Medicine  Emergency Medicine Associates (EMA)
CORRECTIONS HEALTH SERVICES FY Budget Worksession July 11, 2011.
Lean Healthcare - The Identification of Waste in Healthcare
Preparing for Winter 2011/12 Guidance Overview Stuart Low Planning Manager Scottish Govt NHSScotland Business & Performance Mgt Team.
Understanding the Patient Journey Process Mapping and Value Stream / Flow Analysis.
On the basis of data Collection of life saving patient transfer to higher center, we found that about 53.19% of patient were transferred more than one.
Lean in Healthcare Jennifer Nguyen. Learning Objectives  Lean Re-cap  Lean Strategies  Lean Tools  Lean in Healthcare  Apply Lean Strategies  Homework.
Jason Holland 10/06/2013 Changing face of Unscheduled Care The Implementation of new roles within the Emergency Care Directorate across Pennine Acute Hospitals.
ED Capacity Management Admissions Flow through ED Tim Parke ED Consultant through ED.
Value Stream Mapping.
ED Stream Workshop Acute MOC
CHILDREN AND YOUNG PEOPLE’S HEALTH SUPPORT GROUP Unscheduled Care Helen Maitland National Lead.
Understanding Variation and Setting Capacity. Why do we get backlog and queues? Because demand exceeds activity Because we want to be efficient Because.
Emergency Access Information Network - May 2009 ‘Why do people attend’ NHS Forth Valley A&E and what do we need to do to better manage demand’ Kathleen.
Marian Conde University of Central Florida Leadership and Management
Discharge Pathway Preparation for admission Hospital ward to make contact with the person as far in advance as possible so that arrangements can be made.
Preceptorship Teaching Project Jennifer Nagy Auburn University School of Nursing.
Marketing Strategies and Non-Admission Review Lisa Bazemore, MBA, MS, CCC-SLP Director of Consulting Services.
Is the 7 day service the future of pharmacy in acute medicine? David Young.
Why Crowding matters Dr Katherine Henderson FRCP FCEM Registrar Royal College of Emergency Medicine UK Consultant in Emergency Medicine St Thomas’ Hospital.
Pathway of care for people with learning disabilities Consent to treatment Does the person have the capacity to consent? Can the decision wait until the.
We’re counting the benefits of EPR Find out at: epr.this.nhs.uk We’re counting the benefits of EPR Find out at: epr.this.nhs.uk The introduction of EPR.
Kate Parker, Senior House Officer in Paediatric Dentistry Foundation Program Sharing Good Practice Event 11/6/14 Improving the efficiency of dental general.
Productive Working Lara Fox Project Manager. What is Productive Working? Productive working involves efficient, effective and safe processes within a.
Two Kinds of People.
Operational & Process Improvement using Simulation
Presented by Jacob Edwards
Virtual Provider in Triage
Lean Healthcare - The Identification of Waste in Healthcare
Evaluating Effectiveness of a Chair Unit in a Tertiary Academic Medical Center Yash Chathampally MD, MS.
Lean Healthcare Deployment and Sustainability Overview
Unscheduled Care Forum September 4th, 2018
Operational site management principles
Operational site management principles
Presentation transcript:

My Job? South African Triage Scale and Acute and Emergency Case Load Management Policy Implementation Officer

Triage? First come, first served “eye-ball” To the Letter (“inappropriate”) “Love thy Neighbour” Dr G Special

SATS used correctly ↓Waiting times ↓Emergency Centre Length of stay ↑Patient flow ↑Patient and staff satisfaction ↓Mortality (2% to 0.7%)

SATS Performance Indicator CTS priorityTarget time to treat Performance indicator threshold RedImmediate95% Orange10 minutes80% Yellow60 minutes75% Green240 minutes70%

Time to Triage

Triage (ambulance stretcher cases)

Seen by Doctor 0% Orange patients seen in under 10mins after SATS assigned Orange and Yellow patients are seen by doctor on average 2 hours after arrival (about 50 minutes after triage) – this is in a system where Green patients are streamed elsewhere.

Time waiting in EC 71% of admissions spend over 8 hours in the EC (from arrival) Average is 12,5 hours from arrival to ward bed Average wait from time seen by specialist to time to ward is 7hours.

Overcrowding If your hospital is >90% full OR Over 10% of the patients in the Emergency Centre have been waiting over 8hrs from arrival to admission THEN...

INPATIENT MORTALITY IS INCREASED BY 30%! Mortality risk ratio is 1.1 for each hour spent waiting in the Emergency Centre Mortality risk ratio is 1.2 for each hour spent waiting for a doctor

Overcrowding causes Increased patient mortality Ambulance diversion • Increased inhospital lengths of stay Patients not being placed on the appropriate ward • Medical errors Poor infection control Poor hospital processes • Financial losses to hospital and physician • Medical negligence claims Increased staff burnout and decreased morale

“An overcrowded hospital should now be regarded as an unsafe hospital”

No matter how few resources we have there is always hidden capacity in the systems Use our limited resources more effectively Increase efficiencies, reduce duplication, reduce waste Patients want: the right treatment without mistakes without waiting “Work smart not hard” Systems Improvement

Front Door Issues – Entry Portal GFJ: 20% of CHC referrals are “inappropriate” 40% GP referrals “inappropriate”

EC Efficiency

Nursing Staff 44% of time is non-value added work – giving directions – pushing trolleys – answering phones – finding stock ie Employ 10 nurses and you will get 5,6 nurses’ worth ?Quality of the 56% nursing care done under pressurised and distracting conditions Doctors only slightly more productive...

Patient flow Who’s closing the hospital??

Ward check Ward 1: 0 Beds, 5 discharges pending Ward 2: 4 Beds, 5 discharges pending Ward 3: 5 Beds, 3 discharges pending Ward 4: 3 Beds, 0 discharges pending

Back Door Issues - Discharge planning Patients admitted on Thursdays have longer lengths of stay than those admitted on Mondays Patients often only leave beds at 17h00 on the day of discharge

Discharge Process Discharge summary written and handed to nurse Folder to pharmacy Transport arranged OPD appointments made Home-based care forms filled Patient waits in bed until medications or transport, whichever comes last This often only happens at 12h00 or 15h00...

With Discharge Planning Day before Contact transport (heads up) OPD appointments Home-based care forms Intern to prepare discharge forms for next day On the Day Discharge round first thing in the morning Transport confirmed Patient to discharge lounge as soon as transport confirmed

With discharge planning, discharge rounds and discharge lounge Total length of stay shortened Every bed hour saved: Reduces mortality and morbidity of patients awaiting beds Reduces Cost to the Hospital

‘all improvement needs a change but not all change is an improvement’

DMAIC D efine the Problem and its impact on the Organization M easure the Current Performance A nalyze the Performance to identify Causes of this Performance I mprove the Problem by attacking its Causes C ontrol the Improved Process to Maintain the Gains.

Finding ideas for change people providing the service patients guidelines (eg AECLMP and SATS policies!) change ideas/concepts (eg lean, 6-sigma) mapping the system identifying underlying problem (root cause analysis) novel ideas (creativity) eg brain storming best practice - sharing ideas What Change can we make that will result in an improvement?

A little about Lean

Types of waste Muri (overburden) – unreasonable work imposed because of poor organisation – pushing person or machine beyond natural limits. Improvement comes at the level of proactive planning.

Types of waste Mura (uneveness): Problems inherent in system design or implementation. Improvement is in smoothing out the process

Types of Waste Muda (non-value added work): waste that becomes apparent once system implemented – Transportation: moving products that are not actually required to perform the processing – Inventory: all components, work-in-progress, finished product not being processed – Motion: people or equipment moving/walking more than is required to perform the process – Waiting: for the next step in the production – Overproduction: ahead of demand – Over processing due to poor tool or product design, creating activity – Defects (mistakes, re-work)

Types of Waste Use of human resources: Rationalisation Creating thinking workers

5 WHY’s Why?

5S Sort Set in order/Straighten out Shine Standardise Sustain

VALUE STREAM MAPPING 10 min 30 min1 Hour 6 min 2 hour 12 min 10 min 2 min 3 hours 24 min 6 hours 40 min

VALUE STREAM MAPPING 8 min 30 min 45 min 10 min 1 hour 6 min 3 hours 24 min 3 hours 45 min

PORTERS

Porters’ Lodge X-ray Ward 4Ward 1 Ward 2Ward 3 Emergency Centre Ward3 to X-rays EC to Ward2 X-ray to EC Ward 2 to Ward 3 EC to X-ray

Porters’ Lodge X-ray Ward 4Ward 1 Ward 2Ward 3 Emergency Centre Ward3 to X-rays EC to Ward2 X-ray to EC Ward 2 to Ward 3 EC to X-ray

Getting ready to suture

Some other processes impacting flow Stock availability and placement Pharmacy throughput Laboratory turnaround time Enquiries setup Time to folder – place for bedside admission? Statistics collection and acting on Escalation Policies

Initiating Change Valley of despair Performance Time

Rapid Cycle Change What can we change that will result in an improvement? PLAN DO STUDY ACT How will we know that a change is an improvement? What are we trying to accomplish? PLAN DO STUDY ACT PLAN DO STUDY ACT PLAN DO STUDY ACT

Improving many parts of the system at once. PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT Wait for doctor Discharges Triage Nursing duties PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT PLA N DO STU DY ACT

End