September 26-29, 2005 Knoxville. Tennessee USA Progress and Plan of the PROTO-SPHERA Program Outline of the Talk 1)Introduction to PROTO-SPHERA 2)The PROTO-PINCH.

Slides:



Advertisements
Similar presentations
Electrodes and PROTO-PINCH Presented by A. Mancuso PROTO-SPHERA Workshop - Frascati, 18-19/03/2002 Associazione Euratom-ENEA sulla Fusione.
Advertisements

Associazione Euratom-ENEA sulla Fusione Culham September 2003 Status of the PROTO-SPHERA Proposal Outline of the Talk 1)PROTO-SPHERA purpose.
Associazione Euratom-ENEA sulla Fusione Culham September 2003 RISERVA Verticale.
Associazione Euratom-ENEA sulla Fusione Culham September 2003 RISERVA 11.
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Seminario UT FUSIONE Aula Brunelli, Centro Ricerche Frascati 8 Febbraio 2010 Ideal MHD Stability Boundaries of the PROTO-SPHERA Configuration F. Alladio,
Seminario UT FUSIONE Aula FT23, Centro Ricerche Frascati 25 Ottobre 2011 PROTO-SPHERA Experiment: Time scenarios & Power Supplies requirements F. Alladio,
Second Peer Review for New MGI Valves for NSTX-U (Update on Valve Testing) R. Raman, et al. October 29,
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Risultati della fase 1 di Multipinch Franco Alladio WiP – 14 Luglio 2014.
Design Constraints for Liquid-Protected Divertors S. Shin, S. I. Abdel-Khalik, M. Yoda and ARIES Team G. W. Woodruff School of Mechanical Engineering Atlanta,
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
ICC2004 Madison, Wisconsin The Multi-Pinch Experiment Outline PROTO-SPHERA purpose & aims Theoretical basis & analysis Multi-Pinch: a step towards PROTO-SPHERA.
PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
Study on supporting structures of magnets and blankets for a heliotron-type fusion reactors Study on supporting structures of magnets and blankets for.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
A. Canton, S. Dal Bello 13 th IEA/RFP Workshop Density control in RFX-mod A. Canton, S. Dal Bello Consorzio RFX, Padova, Italy.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Heat Flux Gradient Limits for Liquid-Protected Divertors S. I. Abdel-Khalik, S. Shin, and M. Yoda ARIES Meeting, San Diego (Nov 4-5, 2004) G. W. Woodruff.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
Conclusions of phase 1 & transition to phase 2 of MultiPinch Franco Alladio Luca Boncagni, Andrea Grosso, Alessandro Lampasi, Giuseppe Maffia, Alessandro.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Results of PROTO-PINCH Testbench for the PROTO-SPHERA experiment F. Alladio, L.A. Grosso, A. Mancuso, S. Mantovani, P. Micozzi, G. Apruzzese, L. Bettinali,
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
Progress in ARIES-ACT Study Farrokh Najmabadi UC San Diego Japan/US Workshop on Power Plant Studies and Related Advanced Technologies 8-9 March 2012 US.
Cavity support scheme options Thomas Jones 25/06/15.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
PROTO-SPHERA Diagnostics PROTO-SPHERA WORKSHOP Frascati March 18-19, 2002.
ARIES AT Project Meeting - Princeton, NJ 18 Sept 00 1 ARIES-AT Toroidal Field (TF) and Poloidal Field (PF) Coils Tom Brown, Fred Dahlgren, Phil Heitzenroeder.
Overview of the KSTAR commissioning M. Kwon 3 June, 2008.
IPC Stress Relief Lands and terminals shall be located by design so that components can be mounted or provided with stress relief bends in.
DIII-D SHOT #87009 Observes a Plasma Disruption During Neutral Beam Heating At High Plasma Beta Callen et.al, Phys. Plasmas 6, 2963 (1999) Rapid loss of.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
OPERATIONAL SCENARIO of KTM Dokuka V.N., Khayrutdinov R.R. TRINITI, Russia O u t l i n e Goal of the work The DINA code capabilities Formulation of the.
Summary of Winding Pack Thermal Results K. Freudenberg
ITER In-Vessel Coils (IVC) Interim Design Review Thermal Structural FEA of Feeders A Brooks July 27, 2010 July 26-28, 20101ITER_D_353BL2.
Behaviour of Runaway Electrons during Injection of High Z Impurities/Gas Puffing in HT-7 S.Sajjad INSTITUTE OF PLASMA PHYSICS,HEFEI CHINA.
Design Point Studies for next step device National High-heat-flux Advanced Torus Experiment NHTX C Neumeyer 6/8/6.
Mechanical Designs of The Central Detector Jinyu Fu
GOLEM operation based on some results from CASTOR
PROTO-SPHERA experiment ISTW2015 | Princeton, 3-6 November
The Joint Meeting of 4th IAEA Technical Meeting on Spherical Tori and 14th International Workshop on Spherical TorusFrascati, 7 to 10 October Ideal.
Euratom TORE SUPRA  CEA comments on documents provided by the Project Leader Introduction I Performance issues II Operation Issues III. Manufacturing.
Cavity support scheme options Thomas Jones 25/06/15 1.
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
A PROPOSED TF JOINT DESIGN FOR THE NSTX CENTERSTACK UPGRADE Robert D Woolley 25 February 2009.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Page 1 of 19 Design Improvements and Analysis to Push the Heat Flux Limits of Divertors M. S. Tillack, X. R. Wang, J A. Burke and the ARIES Team Japan-US.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Power Supplies requirements of the PROTO-SPHERA experiment P. Micozzi 1, F. Alladio, L. Boncagni, F. Causa, E. Giovannozzi, A. Grosso, A. Lampasi, G. Maffia,
Joint Meeting of the 3rd IAEA Technical Meeting on Spherical Tori and the 11th International Workshop on Spherical Torus St. Petersburg, 3 to 6 October.
Instrumentation for status monitoring of SST-1 superconducting magnets
Construction and Status of Versatile Experiment Spherical Torus at SNU
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Evolution of Spark into Flame Kernel
Produktentwicklung und Maschinenelemente
RF operation of REX-ISOLDE
First results of plasma centerpost in PROTO-SPHERA
F. Alladio, A. Mancuso, P. Micozzi, F. Rogier*
PROTO-SPHERA experiment ISTW2015 | Princeton, 3-6 November
Presentation transcript:

September 26-29, 2005 Knoxville. Tennessee USA Progress and Plan of the PROTO-SPHERA Program Outline of the Talk 1)Introduction to PROTO-SPHERA 2)The PROTO-PINCH Experiment: results 3)Engineering Design and Analysis of PROTO-SPHERA 4)Multi-Pinch Experiment 5)Conclusions Stamos Papastergiou, Franco Alladio, Alessandro Mancuso, Paolo Micozzi, CR-ENEA, CP 65, Frascati (Roma), Italy 1

September 26-29, 2005 Knoxville. Tennessee USA Aims at producing a Spherical Torus (ST) with a Screw Pinch (SP) replacing the centerpost 2 Introduction to PROTO-SPHERA (Spherical Plasma for Helicity Relaxation Assessment) Ip: toroidal current Bt: toroidal field Bp: poloidal field Je: pinch current

September 26-29, 2005 Knoxville. Tennessee USA 3 Engineering Design of PROTO-SPHERA

September 26-29, 2005 Knoxville. Tennessee USA Physics Design I e, I p = 40, 50 kA pinch, ST currentsI e, I p = 60, 240 kA A=R/a = 1.6 aspect ratioA ≤ 1.3  pulse = 80  s~1/100  R pulse duration  pulse ≥ 70 ms ~ 1  R PROTO-SPHERA aims at sustaining the plasma for more than  R =  0 a 2 /  (resistive time) to verify the stability of the configuration 4 Tokyo University - Japan

September 26-29, 2005 Knoxville. Tennessee USA Main Breakdown features  Screw pinch (SP) formed by a hot cathode breakdown  Filling pressure p H ~10 -3 ÷10 -2 mbar  Cathode filaments heated to 2600 °C  V e ~100 V applied on the anode  Initial electrode arc current limited to I e ~8.5 kA 5

September 26-29, 2005 Knoxville. Tennessee USA Test of PROTO-SPHERA Cathode & Anode Arc breakdown in configuration similar to PROTO-SPHERA PROTO-PINCH Experiment - Results 6

September 26-29, 2005 Knoxville. Tennessee USA Anode  No  Damages after 1000 discharges  Material W 95% Cu5%.  Scheme : Puffed Hollow Anode  P WAnode = 2/3 ( ) kW » 56 kW (module)  A surface = m 2  D pw = P W / A surface » 30 MW/m 2  anode arc anchoring with Cathode DC heated (a)  No Anode anchoring with AC cathode heating (b) ab 7

September 26-29, 2005 Knoxville. Tennessee USA Cathode Emissivity  Coil Material : Pure W  Wire Diameter = 2 mm  Total Coils Number = 378  Single Coil emission = 167 A  Tot126 module 3 X 167 A  63 kA  Current Density  1 MA/m 2 Conical Wire Terminal & Clamp Cathode – Extrapolation to PROTO-SPHERA 8 W Mo

September 26-29, 2005 Knoxville. Tennessee USA Gas PuffIe TotSurf = 0.2 m 2 W Cu5% OFHC Hardened CU Gas Puff Anode Power Handling Capability: PROTO-SPHERA Tested = 9 MW PROTO-SPHERA Max = 6 MW Anode Extrapolation to PROTO-SPHERA 9

September 26-29, 2005 Knoxville. Tennessee USA Engineering Design and Analysis of PROTO-SPHERA 10

September 26-29, 2005 Knoxville. Tennessee USA Design Philosophy - Simplicity, symmetry, conservatism. - Viewing capability and good access to electrodes. - All connections to PF coils from top and bottom flanges, external to Machine. - Bellows in coil feedthroughts for adjustment. - Operation and disruption (but no fault) conditions considered. 11

September 26-29, 2005 Knoxville. Tennessee USA Design Aims Operationability, Reliability, Repairability of Machine. Reliability of electrodes and avoidance of arc anchoring. Minimise Technological Risks: provide appropriate elecrical insulation, avoid local coil overheating ( >100°C ) due to hot anode and cathode ( 12MJ, 2750°C ), minimise electromagnetic stresses. 12

September 26-29, 2005 Knoxville. Tennessee USA Operating conditions Temperature20°C Vacuum < mbar (predicted outgassing rate: ~ mbarl/s) Baking 80-90°C Adequate for water removal, coil protection; compatible to Viton O-rings Possibility of N 2 1 mbar contact gas 13

September 26-29, 2005 Knoxville. Tennessee USA Spherical Torus (ST) diameter0.7 m Longitudinal Screw Pinch current 60 kA Toroidal ST current 120÷240 kA Plasma pulse duration 1 s Minimum time between two pulses 5 min. Maximum heat loads on first wall componenets in divertor region 2 MW/m 2, for 1 ms Maximum current density on the plasma-electrode interface 1 MA/m 2 Machine Parameters 14

September 26-29, 2005 Knoxville. Tennessee USA Protection Componenets Thermal and Heat Transfer Behaviour Philosophy: collect the heat ( via radiation ) from the electrodes to black resilient componenet and then conduct or radiate it away in a controlled way. Hot spots are thus avoided. Danger: the hot cathode (less the anode) radiates at 2750°C with ~3.5MW/m 2 and even a 10mm thick coil casing cannot sustain this power density for more than 0.5s without exceeding 100°C 15

September 26-29, 2005 Knoxville. Tennessee USA Thermal and Heat transfer Behaviour Solution: 1.Use of Cu componenets to collect or reflect the heat away from coils. Conservative (but symmetrical) design for the anode. Thermal mass of these components results in operational temperature < 100°C. Water cooled! Optimum design; i.e. one circuit/component, D~10-15mm, v~2m/s, duty cycle 5min. 2.Use of thermocouples in no water cooled componenets to avoid >100°C with frequent pulses; every 5min. 3.Use of 10mm divertor AISI 304LN plates. 2 MW/m 2 for 1 s gives  T~120°C,  th ~320MPa 4.Use of optical diagnostics to view the electrodes which are relatively easily accessible. 16

September 26-29, 2005 Knoxville. Tennessee USA Electromagnetic Forces and Stresses B=50T/sB=500Gt≤1 ms Subdivision of Cu and 304LN plates to achieve ≤100 MPa of eddy current stresses. Unaccounted skin effects (t ~1ms) significant. Conservative prediction of eddy current effects. Electromagnetic forces in the coils (~x10 weight) require to be sustained. 17

September 26-29, 2005 Knoxville. Tennessee USA Predicted and Permitted Stresses ASME III-NB 3221 Stainles Steel Allowable S m for 304LN 100°C : 200MPa [304L S m ~150MPa] Predicted e-m stresses : 320MPa Thermal (divertor) local stresses : 320 MPa (2 MW/m 2,1s) Criterion 1 : 100 <200x1.5 Criterion 2 : 100  320 <200x3 Copper Minimum required allowable at 100°C> 70 MPa (100MPa<70x1.5) Thus  y >115 Mpa and  u > 230 MPa at 20°C i.e. Cu hardenned 18

September 26-29, 2005 Knoxville. Tennessee USA 19 Provisional single anode Cathode ~ START Dimension Simplified PF coils system fed with 600 A, 120 V Does not need cooling Aim: verification of the arc formation & stability Multi-Pinch Experiment START Vacuum Vessel

September 26-29, 2005 Knoxville. Tennessee USA 20 START in Frascati Arrival Disassembling May 2004 October 2004

September 26-29, 2005 Knoxville. Tennessee USA 21 Multi-Pinch Experiment: Phase I & Phase II

September 26-29, 2005 Knoxville. Tennessee USA CONCLUSIONS There is high degree of confidence that the design, construction and reliable operation of PROTO-SPHERA are feasible The Multi-Pinch experiment is being constructed to prove the formation and stability of the PROTO-SPHERA initial arc PROTO-SPHERA can be obtained simply adding components to Multi-Pinch Adequate technological basis, particularly in relation to electrodes, for extrapolation to a bigger device is expected 22