Strategy Rationale Oregon Recovery Plan Washington Recovery Plan NOAA Monitoring Guidance (includes RPAs) Integrated Status & Trends Monitoring (ISTM)

Slides:



Advertisements
Similar presentations
Collaborative, Systemwide Monitoring and Evaluation Program
Advertisements

Evaluate recreational and commercial mark-selective fisheries. (35018) Geraldine Vander Haegen, WDFW Charmane Ashbrook, WDFW Chris Peery, U. Idaho Annette.
Annual Stock Assessment – Coded Wire Tag Program (ODFW & WDFW) BPA Project Numbers: and
Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Project No Tara White, Shannon Jewett, Josh Hanson,
Assessment of A-run Steelhead population in the Clearwater Nez Perce Tribe Department of Fisheries Resources Management.
Monitoring and Evaluation of Yearling Fall Chinook Salmon Released Upstream of Lower Granite Dam Nez Perce Tribe Department of Fisheries Resources Management.
BiOP RPA 52.6 ISAB recommends a regional tagging & marking plan BioAnalysts, Inc.
Lower Snake River Compensation Plan Hatchery Evaluations – Salmon River Project No Nez Perce Tribe Department of Fisheries Resources Management.
Information Needs for the Integrated F&W Program (ESA and Power Act) Jim Geiselman - BPA.
Spatial scales of homing and the efficacy of hatchery supplementation of wild populations Northwest Fisheries Science Center National Marine Fisheries.
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
WRIA 8 Fish in/Fish out Monitoring Summary
Frank Leonetti, Snohomish County
Summary of Recommendations: Peer Review of FY 13 Science Workplan Trinity River Restoration Program Preliminary Fiscal Year 2013 Science Workplan.
CSMEP Goal: Improve the quality and consistency of fish monitoring data, and the methods used to evaluate these data, to answer key questions relevant.
ESCAPEMENT GOALS? WE DON’T NEED NO STINKING ‘SCAPEMENT GOALS! Hal Michael Washington Department of Fish and Wildlife
Adult Steelhead Monitoring Challenges in Cedar Creek, WA Josua Holowatz & Dan Rawding.
Precision of Redd Based Escapement Estimates for Steelhead
Coordination of Tag and Mark Recovery Programs Dan Rawding WDFW.
Coho Reintroduction in the Upper Columbia: Using Adaptive Management to Achieve Success Fisheries Resource Management Yakama Nation.
Where are we going? Regional monitoring and evaluation of hatchery/supplementation programs.
Resident Fish Above Chief Joseph and Grand Coulee Dams Project No Kalispel Tribe of Indians Washington Department of Fish and Wildlife Spokane.
Integrated Status & Trend (ISTM) Project: An overview of establishing, evaluating and modifying monitoring priorities for LCR Steelhead Jeff Rodgers (ODFW)
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
Coordinated Assessments Project; Priorities and Expectations March 16, 2015 StreamNet Executive Committee.
A Guiding Framework For Regional Monitoring Participants –Alan Byrne (IDFG) –Alex Conley (Yakima Salmon Recovery Board) –Chris Drivdahl (WA State NPCC)
StreamNet Project Overview for Data Management Category Review Bruce Schmidt Pacific States Marine Fisheries Commission Presented to: NPCC Independent.
Documenting O. mykiss life histories in the White Salmon River prior to the reintroduction of anadromous fish above Condit Dam. Brady Allen and Patrick.
1 Habitat Action Effectiveness Program for the FCRPS BiOp.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
May 10, 2012 Presented by Micki Varney Oregon Department of Fish and Wildlife.
Washington State Steelhead Status Review PACIFIC COAST STEELHEAD MEETING JON ANDERSON WASHINGTON DEPARTMENT OF FISH & WILDLIFE MARCH 9-11, 2010.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
1 Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) June ??, 2007 DRAFT.
Lewis River Fish Passage Monitoring and Evaluation Plan (draft)
Pacific Coast Steelhead Management Meeting What Are Managers Required to Provide Their Constituents? March 9-11, 2004 Bob Leland.
Monitoring Challenges for VSP Parameters in the Oregon Portion of the Lower Columbia River Jamie Anthony Monitoring Coordinator.
Evaluating Fish Response to Habitat Restoration Overview of Intensively Monitored Watershed Research in the PNW Rationale for IMW approach Extent of current.
Lower Snake River Comp Plan M & E Program SPY’s thoughts based on 3 weeks.
Washington’s Lower Snake River Compensation Plan Steelhead Program – A retrospective and program adaptive management overview Mark Schuck and Joe Bumgarner.
Estimating integrative effects of the H’s on salmon populations.
Principal funding: Bonneville Power Administration, NOAA-Fisheries Principal Investigator: Dr. Chris Jordan, NOAA-Fisheries Actual work on the project.
Chinook Salmon Supplementation in the Imnaha River Basin- A Comparative Look at Changes in Abundance and Productivity Chinook Salmon Supplementation in.
Adult steelhead evaluations in Imnaha River tributaries William Young, Jocelyn Hatch Nez Perce Tribe Department of Fisheries Resources Management.
Status & Trend Monitoring Data End User Management Questions, Directives, Research & Monitoring Plans and Other Strategies 1.Federal Columbia River Estuary,
Integrated Status and Trends Monitoring Demonstration Project Pacific Northwest Aquatic Monitoring Partnership Bernadette Graham Hudson, Lower Columbia.
Establishing a Network of Intensively Monitored Watersheds in the Pacific Northwest PNAMP Effectiveness Monitoring Workgroup April 7, 2005.
October 20 & 21, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Lower Columbia Sub-Basin.
The influence of variable marine survival on fishery management objectives for wild steelhead Dan Rawding & Charlie Cochran.
BPA F&W Program Data Management Needs for Monitoring Support and Coordination Coordinated Assessments Workshop, 2011.
Bryce Glaser Dan Rawding (WDFW)
1 Independent Scientific Advisory Board June 12, 2003 A Review of Salmon and Steelhead Supplementation.
Improved access to data to support high level indicators for salmon and steelhead.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Yakima Steelhead VSP Project: Resident/Anadromous Interactions Gabriel M. Temple 1913 “Landlocked Steelhead”
What do we have in common? Do more with less! PNAMP Integrated Status & Trend Monitoring Workgroup.
November 3-5, 2009 Stevenson, WA Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop Upper Columbia Sub-Region 2 Listed ESU/DPS Steelhead-
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) CBFWA – Ken MacDonald ESSA Technologies Ltd. - Marc Porter State Agencies IDFG.
RTT Analysis Workshop Synthesis: Data Gaps and Research Needs (Chapter 5) Presented by Keely Murdoch MaDMC Chair Yakama Nation.
Coordinated Assessments Project Overview & Next steps January 17, 2012 Presented to: Independent Science Review Panel Tom Iverson, CBFWA.
Welcome Lower Columbia River Conservation and Recovery Plan 2013 Annual Implementation Team Meeting August 19, 2013.
Fish Passage Barriers & Salmon Recovery
Five basic objectives of ISTM
The Reintroduction of Late-Run Winter Steelhead into the Upper North Fork Lewis River, Washington, using F1 Wild Broodstock Hatchery Adults.
Application of Genetic Baseline: Aiding the Recovery of Steelhead
Yakima River Steelhead Status and Trends RM&E Project Overview:
Summarize Strategy The strategy is comprehensive. Covers:
YKFP Spring Chinook Supplementation Assessment
Columbia Basin Coordinated Anadromous Monitoring Strategy Workshop
Presentation transcript:

Strategy Rationale Oregon Recovery Plan Washington Recovery Plan NOAA Monitoring Guidance (includes RPAs) Integrated Status & Trends Monitoring (ISTM) Recommendations Estuary Module

ISTM STEPS Ongoing 1. Identify and prioritize decisions, questions, and objectives 2. Evaluate extent to which existing programs align with these decisions, questions, and objectives Proposed 3. Identify most appropriate monitoring design to inform priority decisions, questions, and objectives 4. Use trade-off analysis to develop specific recommendations for monitoring based on outcomes of objectives Recommend implementation and reporting mechanisms

Review & Proposed TradeOff Analysis

ODFW WDFW LCFRB OWEB USFS Etc. Collaborative, Integrated, Coordinated, & Efficient Monitoring Plan PNAMP Integrated Status & Trend Monitoring Workgroup

Monitoring Challenges In LCR  Lost/loosing census (dam counts at Marmot -Sandy, Powerdale-Hood, & Hemlock -Wind)  Poor visibility (glacial runoff & sediment ) in Hood, Sandy, and Toutle Rivers  High elevation (early snow), difficult access, & safety concerns in canyons on Sandy & Toutle Rivers preclude coho surveys, and some steelhead and Chinook surveys  Redd surveys for steelhead don’t provide biological data (sex ratio, age, % hatchery spawners) because they no carcass recoveries  Limited Funding  Lost/loosing census (dam counts at Marmot -Sandy, Powerdale-Hood, & Hemlock -Wind)  Poor visibility (glacial runoff & sediment ) in Hood, Sandy, and Toutle Rivers  High elevation (early snow), difficult access, & safety concerns in canyons on Sandy & Toutle Rivers preclude coho surveys, and some steelhead and Chinook surveys  Redd surveys for steelhead don’t provide biological data (sex ratio, age, % hatchery spawners) because they no carcass recoveries  Limited Funding

VSP Monitoring Strategy* 1. Annual surveys of natural and hatchery origin spawner abundance at population scale – facilitates productivity, diversity, & distribution assessment Ongoing  Oregon Coho (~$268k/year – Oregon Lottery)  Fall Chinook (~$93k/year – Mitchell Act)  Spring Chinook redds and carcasses census in Sandy and Clackamas (~$40k/year – SFR)  Washington Steelhead (MA)  Chinook (MA & BPA)  Chum (BPA) Gaps  Oregon - Steelhead & Chum Esc (~$319k/year st only)  Washington – Coho Esc(~$600k/year) 1. Annual surveys of natural and hatchery origin spawner abundance at population scale – facilitates productivity, diversity, & distribution assessment Ongoing  Oregon Coho (~$268k/year – Oregon Lottery)  Fall Chinook (~$93k/year – Mitchell Act)  Spring Chinook redds and carcasses census in Sandy and Clackamas (~$40k/year – SFR)  Washington Steelhead (MA)  Chinook (MA & BPA)  Chum (BPA) Gaps  Oregon - Steelhead & Chum Esc (~$319k/year st only)  Washington – Coho Esc(~$600k/year) *Pending ISTM project results

2. Annual surveys of juvenile densities and distribution at MPG scale Ongoing  Oregon (~$42k/year – Oregon Lottery) Gaps  Washington 2. Annual surveys of juvenile densities and distribution at MPG scale Ongoing  Oregon (~$42k/year – Oregon Lottery) Gaps  Washington VSP Monitoring Strategy* *Pending ISTM project results

3. Life cycle (Fish In/Out) monitoring in at least one sub-watershed per MPG Ongoing  NF Scappoose (~$12k/year – Oregon Lottery)  River Mill Dam, Clackamas ($? - PGE)  Hood River (BPA)  Grays & Wind (BPA)  MAG, Kalama, Coweeman, Cedar(State, MA,PSC)  Tilton & Upper Cowlitz (TPU) Proposed  Clatskanie River (~$60k/year)  Cedar Creek, Sandy River (~$50k/year)  EF & WF Hood River (~?/year CTWS)  Rotating smolt traps in Sandy River (~$50k/year b )  Rotating smolts in unmonitored WA tribs 3. Life cycle (Fish In/Out) monitoring in at least one sub-watershed per MPG Ongoing  NF Scappoose (~$12k/year – Oregon Lottery)  River Mill Dam, Clackamas ($? - PGE)  Hood River (BPA)  Grays & Wind (BPA)  MAG, Kalama, Coweeman, Cedar(State, MA,PSC)  Tilton & Upper Cowlitz (TPU) Proposed  Clatskanie River (~$60k/year)  Cedar Creek, Sandy River (~$50k/year)  EF & WF Hood River (~?/year CTWS)  Rotating smolt traps in Sandy River (~$50k/year b )  Rotating smolts in unmonitored WA tribs a Annual cost will go down once infrastructure is in place b Supplemented by with additional Portland HCP funds? VSP Monitoring Strategy* *Pending ISTM project results

Habitat Monitoring Strategy* 1. Annual GRTS-based habitat surveys at MPG scale Ongoing  In wadeable streams (~$68k/year – Oregon Lottery) Proposed  In non-wadeable streams (~$100k/year) 2. Periodic GRTS-based habitat surveys at population scale Ongoing  None Proposed  Wadeable streams (~$156k/year)  Non-wadeable streams (included in MPG scale estimate) 1. Annual GRTS-based habitat surveys at MPG scale Ongoing  In wadeable streams (~$68k/year – Oregon Lottery) Proposed  In non-wadeable streams (~$100k/year) 2. Periodic GRTS-based habitat surveys at population scale Ongoing  None Proposed  Wadeable streams (~$156k/year)  Non-wadeable streams (included in MPG scale estimate) *Pending ISTM project results

Precision & Sample Size Targets*  + 30% of estimate  sites or 30% of sample frame (whichever comes first)  + 30% of estimate  sites or 30% of sample frame (whichever comes first) *Pending ISTM project results

Harvest Monitoring Strategy  Improve precision of harvest estimates. ($?)  Needed for VSP productivity estimate  Hatchery harvest rates from CWT are used as surrogate for wild fish  Consider incorporation of genetic & PIT tag sampling to supplement & compare with CWT  CWT recovery program ◦Fund CWT program to achieve 20% sample rate ◦Provided wands/scanners to sample PIT tags  Improve precision of harvest estimates. ($?)  Needed for VSP productivity estimate  Hatchery harvest rates from CWT are used as surrogate for wild fish  Consider incorporation of genetic & PIT tag sampling to supplement & compare with CWT  CWT recovery program ◦Fund CWT program to achieve 20% sample rate ◦Provided wands/scanners to sample PIT tags

Hatchery Monitoring Strategy  Segregated and Integrated Programs  CWT Program  Relative Reproductive Success  VSP Abundance  Residualism/Ecologiocal Interactions from Juvenile Sampling  Segregated and Integrated Programs  CWT Program  Relative Reproductive Success  VSP Abundance  Residualism/Ecologiocal Interactions from Juvenile Sampling

Effectiveness Monitoring Strategy  Pre- & Post- habitat monitoring at restoration sites ◦ Ongoing  ~15 restoration sites per year ($? – Oregon Lottery) ◦ Proposed  Pending ISTM project results  Intensively Monitored Watersheds ◦Ongoing  OR (None) & WA (MAG) ◦Proposed  Pending ISTM project results  WA (Wind)  Pre- & Post- habitat monitoring at restoration sites ◦ Ongoing  ~15 restoration sites per year ($? – Oregon Lottery) ◦ Proposed  Pending ISTM project results  Intensively Monitored Watersheds ◦Ongoing  OR (None) & WA (MAG) ◦Proposed  Pending ISTM project results  WA (Wind)

Critical Uncertainty Research Ongoing:  Relative Reproductive Success ◦Steelhead – Hood, Kalama, & Abernathy (BPA & MA)  ISTM ◦Species Distribution Models for sampling frames (BPA) ◦Master Sample Program for LCR (BPA)  Alternate monitoring ◦DIDSON Sonar (PSC) Proposed:  Chum reintroduction (~$324k/year) ◦Freshwater survival and performance of hatchery fed-fry, direct planted eyed eggs, and natural production following reintroduction of chum salmon into targeted subbasins  Relative Reproductive Success ◦Tule Fall Chinook  ISTM ◦Integration of fish and habitat monitoring ◦Estimation of precision & accuracy of different Columbia Basin monitoring programs (Redds, AUC, MR, PCE) based on LCR data ◦TradeOffs ($, Precision, Accuracy) between monitoring approaches & designs Ongoing:  Relative Reproductive Success ◦Steelhead – Hood, Kalama, & Abernathy (BPA & MA)  ISTM ◦Species Distribution Models for sampling frames (BPA) ◦Master Sample Program for LCR (BPA)  Alternate monitoring ◦DIDSON Sonar (PSC) Proposed:  Chum reintroduction (~$324k/year) ◦Freshwater survival and performance of hatchery fed-fry, direct planted eyed eggs, and natural production following reintroduction of chum salmon into targeted subbasins  Relative Reproductive Success ◦Tule Fall Chinook  ISTM ◦Integration of fish and habitat monitoring ◦Estimation of precision & accuracy of different Columbia Basin monitoring programs (Redds, AUC, MR, PCE) based on LCR data ◦TradeOffs ($, Precision, Accuracy) between monitoring approaches & designs

Data Management Ongoing  StreamNet  OWEB Oregon Watershed Restoration Inventory  WDFW – Spawning Ground Survey (SGS), Age & Scales, & Smolt Trapping databases  Project level data management Gaps  Coordinated region-wide VSP and habitat data management systems ($?) Ongoing  StreamNet  OWEB Oregon Watershed Restoration Inventory  WDFW – Spawning Ground Survey (SGS), Age & Scales, & Smolt Trapping databases  Project level data management Gaps  Coordinated region-wide VSP and habitat data management systems ($?)

◦How it conforms with your strategy  Existing monitoring & tradeoffs reviewed through ISTM  Current monitoring is early Implementation of ISTM & gaps ◦How it informs the BIOP RPA’s  RPA 62.4,50.6,50.7,63.1  ◦Where there adjustments identified  Modify CWT recovery expanded to include PIT tags  Modified Chum to address PRA  New RRS for Chinook  Wind modified for IMW status (Dam Removal & Habitat Restoration) ◦Were these adjustments cost plus, cost minus or cost neutral, include total amounts  All adjustments are cost plus Existing monitoring and its relation to strategy and BIOP RPA’s

◦The only Accord Monitoring in the Lower Columbia Domain occurs in the Hood River By CTWSRO ◦Accord monitoring addresses RPA 50.4, 50.6, 50.7, 56.1, 62.1, 62.4, 64.1, 64.2 ◦M&E was projected to be $499k and proposed to be $502K ◦Habitat monitoring $50K out of $323K annually ◦Does not include ODFW monitoring and OSU RRS steelhead monitoring Summarize any Accord monitoring within your strategy

Summarize, by priority, the new monitoring efforts needed to meet the RPA requirements  ISTM Project funded through PNAMP to complete a comprehensive review of fish monitoring in the LCR and develop an integrated status and trend monitoring program for habitat. (ODFW & WDFW)  Coded Wire Tag Recovery Project This project includes fisheries sampling and spawning ground surveys to recovery coded wire tags. Both of which are needed for estimate VSP parameters of abundance, diversity, and productivity. Scope increased to include PIT tag sampling and achievement of recommended sampling rates. (ODFW & WDFW)  Chum salmon enhancement in the LCR (includes monitoring, restoration, rebuilding, and reintroduction). Funding already secured for planning & development of integrated monitoring plan and habitat restoration in FY10 ($497K). In FY11 Duncan Cr project ( ) & Below the Dams project ( ) to be combined into one project ($1.1M) for full implementation. Includes smolt trapping for multiply listed species on Grays & possibly Hamilton Creek. (ODFW & WDFW)

Summarize, by priority, the new monitoring efforts needed to meet the RPA requirements (continued)  Hood River M&E and Habitat Programs (ODFW and CTWSRO)  Wind River Watershed Assessment. Funding for BACI design in Wind River to assess removal of Hemlock Dam on USFS land per contract # Modification is intended is to elevate Wind River monitoring to IMW-level intensity. Also provides information on other species (Coho & Chinook). Budget includes only fish monitoring (WDFW).

Summarize, by priority, the new additional monitoring efforts needed to meet the strategy. OREGON (Highest Priority)  Implementation of ISTM Recommendations  GRTS-based steelhead redd surveys. Cost: $319k/year  Periodic GRTS-based habitat monitoring at population scale in wadeable streams. Cost/year: $156k (for all pops and all MPGs in LCR)  Habitat monitoring in non-wadeable streams. Cost: $100k/year (includes all pops and MPGs in LCR)  Life cycle monitoring site in Cedar Creek (Sandy River) and rotating outmigrant traps in the Sandy. Cost: $100k/year

Summarize, by priority, the new additional monitoring efforts needed to meet the strategy. WASHINGTON (Highest Priority)  Implementation of ISTM Recommendations  LCR adult coho monitoring of distribution, escapement. Included in WDFW MOA proposal to BPA. Includes development and implementation of "Accuracy & Precision" project to develop LCR- specific apparent residence time estimate. Should also include completion of Coweeman coho survey project ( )

Summarize, by priority, the new additional monitoring efforts needed to meet the strategy. OREGON (High Priority)  Develop new hatchery database system that is compatible with the proposed databases for production planning and marking (Istar) has the ability to store new data fields and expand as need arises, and is readily available to all personnel in ODFW. Cost: $  Juvenile outmigrant trapping at NF Klaskanine and Big Creek to obtain additional information on marine and freshwater survival rates and gather information needed to develop and test habitat capacity models. Cost: $60k/year  GRTS-based surveys above fish counting/passage facilities to evaluate precision and bias. Cost: $60k/year  Macroinvertebrate monitoring at MPG scale. Cost: $50k/year (includes all MPGs in LCR)  Life cycle monitoring site in Neal Cr. (Hood). Cost/year: $100k

Summarize, by priority, the new additional monitoring efforts needed to meet the strategy. WASHINGTON (High Priority)  Fall Chinook Productivity Monitoring Two estimates of RRS for Chinook (one each in strata coast and casacde).  Washougal Weir Construction and Operation of a weir on the Washougal for hatchery tule fall Chinook escapement  Fish In/out Monitoring. Statewide strategy for the high quality escapement and smolt estimates for both fisheries and habitat monitoring  Coweeman Fish In/Out Juvenile trapping and adult escapement estimates for all salmonids.  Kalama River 2nd Generation RRS RRS of naturally produced steelhead with varying degrees of hatchery ancestry.